메뉴 건너뛰기




Volumn 38, Issue 1, 2011, Pages 328-339

On solving the assembly line worker assignment and balancing problem via beam search

Author keywords

Assembly line worker assignment and balancing; Beam search

Indexed keywords

ASSEMBLY;

EID: 78049444965     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.05.008     Document Type: Conference Paper
Times cited : (99)

References (27)
  • 1
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Gosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International Journal of Production Research 27 1989 637 670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Gosh, S.1    Gagnon, R.J.2
  • 2
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • A. Scholl, and C. Becker State-of-the-art exact and heuristic solution procedures for simple assembly line balancing European Journal of Operational Research 168 3 2006 666 693
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 5
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem. Application to sheltered work centres for disabled
    • C. Miralles, J.P. Garcia-Sabater, C. Andres, and M. Cardos Branch and bound procedures for solving the assembly line worker assignment and balancing problem. Application to sheltered work centres for disabled Discrete Applied Mathematics 156 2008 352 367
    • (2008) Discrete Applied Mathematics , vol.156 , pp. 352-367
    • Miralles, C.1    Garcia-Sabater, J.P.2    Andres, C.3    Cardos, M.4
  • 8
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • J. Bukchin, and M. Tzur Design of flexible assembly line to minimize equipment cost IEE Transactions 32 2000 585 598
    • (2000) IEE Transactions , vol.32 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 10
    • 25144474660 scopus 로고    scopus 로고
    • A special case of transfer lines balancing by graph approach
    • DOI 10.1016/j.ejor.2004.07.025, PII S0377221704004825, Balancing Assembly and Transfer Lines
    • A. Dolgui, N. Guschinsky, and G. Levin A special case of transfer lines balancing by graph approach European Journal of Operational Research 168 2006 732 746 (Pubitemid 41336589)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 732-746
    • Dolgui, A.1    Guschinsky, N.2    Levin, G.3
  • 13
    • 0031677329 scopus 로고    scopus 로고
    • Assembly system design: A branch and cut approach
    • A. Pinnoi, and W.E. Wilhelm Assembly system design: a branch and cut approach Management Science 44 1998 103 118
    • (1998) Management Science , vol.44 , pp. 103-118
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 14
    • 0020781916 scopus 로고
    • Assembly line balancing with processing alternatives: An application
    • P.A. Pinto, D.G. Dannenbring, and B.M. Khumawala Assembly line balancing with processing alternatives: an application Management Science 29 1983 817 830
    • (1983) Management Science , vol.29 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 16
    • 0027148640 scopus 로고
    • RALBA heuristic algorithm for design and balancing of robotic assembly lines
    • J. Rubinovitz, and J. Bukchin RALBA heuristic algorithm for design and balancing of robotic assembly lines Annals of the CIRP 42 1993 497 500
    • (1993) Annals of the CIRP , vol.42 , pp. 497-500
    • Rubinovitz, J.1    Bukchin, J.2
  • 17
    • 0032651420 scopus 로고    scopus 로고
    • A column-generation approach for the assembly system design problem with tool changes
    • W.E. Wilhelm A column-generation approach for the assembly system design problem with tool changes International Journal of Flexible Manufacturing Systems 11 1999 177 205
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 177-205
    • Wilhelm, W.E.1
  • 21
    • 61349138831 scopus 로고    scopus 로고
    • Beam-ACO for simple assembly line balancing
    • C. Blum Beam-ACO for simple assembly line balancing INFORMS Journal on Computing 20 4 2008 618 627
    • (2008) INFORMS Journal on Computing , vol.20 , Issue.4 , pp. 618-627
    • Blum, C.1
  • 23
    • 13444278719 scopus 로고    scopus 로고
    • Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
    • M. Ghirardi, and C.N. Potts Makespan minimization for scheduling unrelated parallel machines: a recovering beam search approach European Journal of Operational Research 165 2 2005 457 467
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 457-467
    • Ghirardi, M.1    Potts, C.N.2
  • 24
    • 14044249418 scopus 로고    scopus 로고
    • Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
    • J.M.S. Valente, and R.A.F.S. Alves Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time Computers & Industrial Engineering 48 2 2005 363 375
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 363-375
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 25
    • 2442621332 scopus 로고    scopus 로고
    • Beam search for peak alignment of NMR signals
    • G.-C. Lee, and D.L. Woodruff Beam search for peak alignment of NMR signals Analytica Chimica Acta 513 2 2004 413 416
    • (2004) Analytica Chimica Acta , vol.513 , Issue.2 , pp. 413-416
    • Lee, G.-C.1    Woodruff, D.L.2
  • 26
    • 67349184629 scopus 로고    scopus 로고
    • Beam search for the longest common subsequence problem
    • C. Blum, M.J. Blesa, and M. Lpez Ibez Beam search for the longest common subsequence problem Computers & Operations Research 36 12 2009 3178 3186
    • (2009) Computers & Operations Research , vol.36 , Issue.12 , pp. 3178-3186
    • Blum, C.1    Blesa, M.J.2    Lpez Ibez, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.