메뉴 건너뛰기




Volumn 65, Issue , 2016, Pages 9-20

Impact of considering need for work and risk on performance of construction contractors: An agent-based approach

Author keywords

Agent based modeling; Competitive bidding; Computer aided simulation; Markup; Multi attribute decision making; Need for work; Risk attitude

Indexed keywords

AUTONOMOUS AGENTS; COMMERCE; COMPUTATIONAL METHODS; DECISION MAKING; RISK PERCEPTION; SOFTWARE AGENTS;

EID: 84958225535     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2016.01.004     Document Type: Article
Times cited : (32)

References (45)
  • 1
    • 0024053852 scopus 로고
    • Questionnaire survey on bidding in construction
    • I. Ahmad, and I. Minkarah Questionnaire survey on bidding in construction. J. Manag. Eng., ASCE 4 3 1988 229 243
    • (1988) J. Manag. Eng., ASCE , vol.4 , Issue.3 , pp. 229-243
    • Ahmad, I.1    Minkarah, I.2
  • 2
    • 84894448594 scopus 로고    scopus 로고
    • Cooperative game theoretic framework for joint resource management in construction
    • (04013066)
    • S. Asgari, A. Afshar, and K. Madani Cooperative game theoretic framework for joint resource management in construction J. Constr. Eng. Manag. 140 3 2014 (04013066)
    • (2014) J. Constr. Eng. Manag. , vol.140 , Issue.3
    • Asgari, S.1    Afshar, A.2    Madani, K.3
  • 3
    • 84945157715 scopus 로고    scopus 로고
    • Developing a virtual laboratory for construction bidding environment using agent-based modeling
    • 04014105
    • R. Awwad, S. Asgari, and A. Kandil Developing a virtual laboratory for construction bidding environment using agent-based modeling J. Comput. Civ. Eng., ASCE 2014 (04014105)
    • (2014) J. Comput. Civ. Eng., ASCE
    • Awwad, R.1    Asgari, S.2    Kandil, A.3
  • 4
    • 84872169947 scopus 로고    scopus 로고
    • Agent-based modeling of occupants and their impact on energy use in commercial buildings
    • E. Azar, and C. Menassa Agent-based modeling of occupants and their impact on energy use in commercial buildings J. Comput. Civ. Eng. 26 4 2012 506 518
    • (2012) J. Comput. Civ. Eng. , vol.26 , Issue.4 , pp. 506-518
    • Azar, E.1    Menassa, C.2
  • 5
    • 84891421777 scopus 로고    scopus 로고
    • A framework to evaluate energy saving potential from occupancy interventions in typical US commercial buildings
    • E. Azar, and C. Menassa A framework to evaluate energy saving potential from occupancy interventions in typical US commercial buildings J. Comput. Civ. Eng. 28 1 2014 63 78
    • (2014) J. Comput. Civ. Eng. , vol.28 , Issue.1 , pp. 63-78
    • Azar, E.1    Menassa, C.2
  • 6
    • 0037076425 scopus 로고    scopus 로고
    • Agent-based modeling: methods and techniques for simulating human systems
    • E. Bonabeau Agent-based modeling: methods and techniques for simulating human systems Proc. Natl. Acad. Sci. U. S. A. 99 Suppl. 3 2002 7280 7287
    • (2002) Proc. Natl. Acad. Sci. U. S. A. , vol.99 , pp. 7280-7287
    • Bonabeau, E.1
  • 7
    • 38249035588 scopus 로고
    • The competitive bidding process: beyond probability models
    • P.D. Boughton The competitive bidding process: beyond probability models Ind. Mark. Manag. 16 1987 87 94
    • (1987) Ind. Mark. Manag. , vol.16 , pp. 87-94
    • Boughton, P.D.1
  • 8
    • 0020297936 scopus 로고
    • General bidding model
    • R.I. Carr General bidding model J. Constr. Div., ASCE 108 4 1982 639 650
    • (1982) J. Constr. Div., ASCE , vol.108 , Issue.4 , pp. 639-650
    • Carr, R.I.1
  • 9
    • 0020721480 scopus 로고
    • Impact of number of bidders on competition
    • R.I. Carr Impact of number of bidders on competition J. Constr. Eng. Manag., ASCE 109 1 1983 61 73
    • (1983) J. Constr. Eng. Manag., ASCE , vol.109 , Issue.1 , pp. 61-73
    • Carr, R.I.1
  • 10
    • 84873543295 scopus 로고    scopus 로고
    • Block configuration modeling: a novel simulation model to emulate building occupant peer networks and their impact on building energy consumption
    • J. Chen, R.K. Jain, and J.E. Taylor Block configuration modeling: a novel simulation model to emulate building occupant peer networks and their impact on building energy consumption Appl. Energy 105 2013 358 368
    • (2013) Appl. Energy , vol.105 , pp. 358-368
    • Chen, J.1    Jain, R.K.2    Taylor, J.E.3
  • 11
    • 16444375325 scopus 로고    scopus 로고
    • Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm
    • S.E. Christodoulou Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm J. Comput. Civ. Eng., ASCE 18 4 2004 322 330
    • (2004) J. Comput. Civ. Eng., ASCE , vol.18 , Issue.4 , pp. 322-330
    • Christodoulou, S.E.1
  • 12
    • 0034269643 scopus 로고    scopus 로고
    • Key factors in bid reasoning model
    • D.K.H. Chua, and D. Li Key factors in bid reasoning model J. Constr. Eng. Manag., ASCE 126 5 2000 349 357
    • (2000) J. Constr. Eng. Manag., ASCE , vol.126 , Issue.5 , pp. 349-357
    • Chua, D.K.H.1    Li, D.2
  • 13
    • 0017465325 scopus 로고
    • Bidding models: effects of bidders' risk aversion
    • R. DeNeufville, E.N. Hani, and Y. Lesage Bidding models: effects of bidders' risk aversion J. Constr. Div. 103 CO1 1977 57 70
    • (1977) J. Constr. Div. , vol.103 , Issue.CO1 , pp. 57-70
    • DeNeufville, R.1    Hani, E.N.2    Lesage, Y.3
  • 14
    • 0026381931 scopus 로고
    • Risk and need for work premiums in contractor bidding
    • R. DeNeufville, and D. King Risk and need for work premiums in contractor bidding J. Constr. Eng. Manag., ASCE 117 4 1991 659 673
    • (1991) J. Constr. Eng. Manag., ASCE , vol.117 , Issue.4 , pp. 659-673
    • DeNeufville, R.1    King, D.2
  • 16
    • 0036813520 scopus 로고    scopus 로고
    • The factors influencing bid mark-up decisions of large and medium size contractors in Singapore
    • M.F. Dulaimi, and H.G. Shan The factors influencing bid mark-up decisions of large and medium size contractors in Singapore Constr. Manag. Econ. 20 7 2002 601 610
    • (2002) Constr. Manag. Econ. , vol.20 , Issue.7 , pp. 601-610
    • Dulaimi, M.F.1    Shan, H.G.2
  • 17
    • 77149144146 scopus 로고    scopus 로고
    • Multiagent system for construction dispute resolution (MAS-COR)
    • I. El-Adaway, and A. Kandil Multiagent system for construction dispute resolution (MAS-COR) J. Constr. Eng. Manag. 136 3 2010 303 315
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.3 , pp. 303-315
    • El-Adaway, I.1    Kandil, A.2
  • 18
    • 0002861004 scopus 로고    scopus 로고
    • Competitive bidding strategy model and software system for bid preparation
    • A. Fayek Competitive bidding strategy model and software system for bid preparation J. Constr. Eng. Manag. 124 1 1998 1 10
    • (1998) J. Constr. Eng. Manag. , vol.124 , Issue.1 , pp. 1-10
    • Fayek, A.1
  • 19
    • 0001748017 scopus 로고
    • A competitive bidding strategy
    • L. Friedman A competitive bidding strategy Oper. Res. 4 1 1956 104 112
    • (1956) Oper. Res. , vol.4 , Issue.1 , pp. 104-112
    • Friedman, L.1
  • 20
    • 25144450815 scopus 로고    scopus 로고
    • Uses of agent-based modeling in innovation/new product development research
    • R. Garcia Uses of agent-based modeling in innovation/new product development research J. Prod. Innov. Manag. 22 5 2005 380 398
    • (2005) J. Prod. Innov. Manag. , vol.22 , Issue.5 , pp. 380-398
    • Garcia, R.1
  • 21
    • 0002268578 scopus 로고
    • Bidding strategies and probabilities
    • M. Gates Bidding strategies and probabilities J. Constr. Div., ASCE 93 1 1967 75 107
    • (1967) J. Constr. Div., ASCE , vol.93 , Issue.1 , pp. 75-107
    • Gates, M.1
  • 22
    • 0028330587 scopus 로고
    • Analogy-based solution to markup estimation problem
    • T. Hegazy, and O. Moselhi Analogy-based solution to markup estimation problem J. Comput. Civ. Eng. 8 1 1994 72 87
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.1 , pp. 72-87
    • Hegazy, T.1    Moselhi, O.2
  • 23
    • 84906248603 scopus 로고    scopus 로고
    • Bid compensation theory and strategies for projects with heterogeneous bidders: a game theoretic analysis
    • 04014022
    • S.P. Ho, and Y. Hsu Bid compensation theory and strategies for projects with heterogeneous bidders: a game theoretic analysis J. Manag. Eng. 30 5 2014 (04014022)
    • (2014) J. Manag. Eng. , vol.30 , Issue.5
    • Ho, S.P.1    Hsu, Y.2
  • 24
    • 0020139948 scopus 로고
    • Construction risk: multi-attribute approach
    • C.W. Ibbs, and K.C. Crandall Construction risk: multi-attribute approach J. Constr. Div., ASCE 108 2 1982 187 200
    • (1982) J. Constr. Div., ASCE , vol.108 , Issue.2 , pp. 187-200
    • Ibbs, C.W.1    Crandall, K.C.2
  • 25
    • 79955389359 scopus 로고    scopus 로고
    • Effects of contractors' risk attitude on competition in construction
    • H.J. Kim, and K.F. Reinschmidt Effects of contractors' risk attitude on competition in construction J. Constr. Eng. Manag., ASCE 137 4 2011 275 283
    • (2011) J. Constr. Eng. Manag., ASCE , vol.137 , Issue.4 , pp. 275-283
    • Kim, H.J.1    Reinschmidt, K.F.2
  • 26
    • 79955368636 scopus 로고    scopus 로고
    • Association of risk attitude with market diversification in the construction business
    • H.J. Kim, and K.F. Reinschmidt Association of risk attitude with market diversification in the construction business J. Manag. Eng., ASCE 27 2 2011 66 74
    • (2011) J. Manag. Eng., ASCE , vol.27 , Issue.2 , pp. 66-74
    • Kim, H.J.1    Reinschmidt, K.F.2
  • 27
    • 79955433610 scopus 로고    scopus 로고
    • Risk and price in the bidding process of contractors
    • S. Laryea, and W. Hughes Risk and price in the bidding process of contractors J. Constr. Eng. Manag., ASCE 137 4 2011 248 258
    • (2011) J. Constr. Eng. Manag., ASCE , vol.137 , Issue.4 , pp. 248-258
    • Laryea, S.1    Hughes, W.2
  • 29
    • 85044466286 scopus 로고    scopus 로고
    • Modeling the decision-making process concerning participation in construction bidding
    • 04014032
    • A. Lesniak, and E. Plebankiewicz Modeling the decision-making process concerning participation in construction bidding J. Manag. Eng. 2014 (04014032)
    • (2014) J. Manag. Eng.
    • Lesniak, A.1    Plebankiewicz, E.2
  • 30
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • M. Liu, and Y.Y. Ling Modeling a contractor's markup estimation J. Constr. Eng. Manag., ASCE 131 4 2005 391 399
    • (2005) J. Constr. Eng. Manag., ASCE , vol.131 , Issue.4 , pp. 391-399
    • Liu, M.1    Ling, Y.Y.2
  • 32
    • 51849154234 scopus 로고    scopus 로고
    • Heterogeneous approach to modeling contractors' decision-to-bid strategies
    • B.L. Oo, D.S. Drew, and H.P. Lo Heterogeneous approach to modeling contractors' decision-to-bid strategies J. Constr. Eng. Manag., ASCE 134 10 2008 766 775
    • (2008) J. Constr. Eng. Manag., ASCE , vol.134 , Issue.10 , pp. 766-775
    • Oo, B.L.1    Drew, D.S.2    Lo, H.P.3
  • 33
    • 77953600574 scopus 로고    scopus 로고
    • Modeling the heterogeneity in contractors' mark-up behavior
    • B.L. Oo, D.S. Drew, and H.P. Lo Modeling the heterogeneity in contractors' mark-up behavior J. Constr. Eng. Manag., ASCE 136 7 2010 720 729
    • (2010) J. Constr. Eng. Manag., ASCE , vol.136 , Issue.7 , pp. 720-729
    • Oo, B.L.1    Drew, D.S.2    Lo, H.P.3
  • 34
    • 84901054592 scopus 로고    scopus 로고
    • Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects
    • 04013007
    • H. Said, A. Kandil, S. Nookala, H. Cai, M. El-Gafy, A. Senouci, and H. Al-Derham Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects J. Archit. Eng. 20 2 2014 (04013007)
    • (2014) J. Archit. Eng. , vol.20 , Issue.2
    • Said, H.1    Kandil, A.2    Nookala, S.3    Cai, H.4    El-Gafy, M.5    Senouci, A.6    Al-Derham, H.7
  • 35
    • 50149091763 scopus 로고    scopus 로고
    • Agent-Based Modeling: Approach for Improving Infrastructure Management
    • K.L. Sanford Bernhardt, and S. McNeil Agent-Based Modeling: Approach for Improving Infrastructure Management J. Infrastruct. Syst. 14 3 2008 253 261
    • (2008) J. Infrastruct. Syst. , vol.14 , Issue.3 , pp. 253-261
    • Sanford Bernhardt, K.L.1    McNeil, S.2
  • 36
    • 84872734011 scopus 로고    scopus 로고
    • Verification and validation of simulation models
    • R.G. Sargent Verification and validation of simulation models J. Simul. 7 1 2013 12 24
    • (2013) J. Simul. , vol.7 , Issue.1 , pp. 12-24
    • Sargent, R.G.1
  • 39
    • 0000643379 scopus 로고
    • Factors considered in tendering decisions by top UK contractors
    • A.A. Shash Factors considered in tendering decisions by top UK contractors Constr. Manag. Econ. 11 2 1993 111 118
    • (1993) Constr. Manag. Econ. , vol.11 , Issue.2 , pp. 111-118
    • Shash, A.A.1
  • 40
    • 0033099726 scopus 로고    scopus 로고
    • Small to medium contractor contingency and assumption of risk
    • G.R. Smith, and M.C. Bohn Small to medium contractor contingency and assumption of risk J. Constr. Eng. Manag. 125 2 1999 101 108
    • (1999) J. Constr. Eng. Manag. , vol.125 , Issue.2 , pp. 101-108
    • Smith, G.R.1    Bohn, M.C.2
  • 41
    • 79955442959 scopus 로고    scopus 로고
    • Modeling interfirm dependency: game theoretic simulation to examine the holdup problem in project networks
    • H. Unsal, and J. Taylor Modeling interfirm dependency: game theoretic simulation to examine the holdup problem in project networks J. Constr. Eng. Manag. 137 4 2011 284 293
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.4 , pp. 284-293
    • Unsal, H.1    Taylor, J.2
  • 42
    • 33846818747 scopus 로고    scopus 로고
    • Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions
    • W.C. Wang, R.J. Dzeng, and Lu Y.H. Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions Comput. Aided Civ. Infrastruct. Eng. 22 3 2007 223 235
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , Issue.3 , pp. 223-235
    • Wang, W.C.1    Dzeng, R.J.2    Lu, Y.H.3
  • 43
    • 0015646550 scopus 로고
    • Utility function determination for bidding models
    • J. Willenbrock Utility function determination for bidding models J. Constr. Div., ASCE 99 1 1973 133 153
    • (1973) J. Constr. Div., ASCE , vol.99 , Issue.1 , pp. 133-153
    • Willenbrock, J.1
  • 45
    • 84878857234 scopus 로고    scopus 로고
    • Key factors considered in compiling tender prices for China's public works projects
    • K. Ye, B. Li, and L. Shen Key factors considered in compiling tender prices for China's public works projects J. Manag. Eng. 29 3 2013 206 215
    • (2013) J. Manag. Eng. , vol.29 , Issue.3 , pp. 206-215
    • Ye, K.1    Li, B.2    Shen, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.