메뉴 건너뛰기




Volumn 37, Issue , 2015, Pages 703-714

Optimal production scheduling for hybrid manufacturing-remanufacturing systems with setups

Author keywords

Manufacturing; Optimal scheduling; Production planning; Remanufacturing; Reverse logistics; Setup

Indexed keywords

EARNINGS; HYBRID MATERIALS; HYBRID SYSTEMS; LOGISTICS; MANUFACTURE; PRODUCTION CONTROL;

EID: 84954040624     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2015.02.001     Document Type: Article
Times cited : (32)

References (25)
  • 2
    • 0032642459 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: A state-of-The-art survey
    • V.D.R. Guide, V. Jayaraman, and R. Srivastava Production planning and control for remanufacturing: a state-of-the-art survey Rob Comput Integr Manuf 15 1999 221 230
    • (1999) Rob Comput Integr Manuf , vol.15 , pp. 221-230
    • Guide, V.D.R.1    Jayaraman, V.2    Srivastava, R.3
  • 4
    • 0037401491 scopus 로고    scopus 로고
    • Computational issues in a stochastic finite horizon one product recovery inventory model
    • G.P. Kiesmller, and C.W. Scherer Computational issues in a stochastic finite horizon one product recovery inventory model Eur J Oper Res 146 2003 553 579
    • (2003) Eur J Oper Res , vol.146 , pp. 553-579
    • Kiesmller, G.P.1    Scherer, C.W.2
  • 5
    • 0000683467 scopus 로고    scopus 로고
    • Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
    • K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes OR Spektrum 19 1997 111 122
    • (1997) OR Spektrum , vol.19 , pp. 111-122
    • Inderfurth, K.1
  • 6
    • 18344408880 scopus 로고    scopus 로고
    • Optimal production-inventory strategies for HMMS-type reverse logistics system
    • I. Dobos Optimal production-inventory strategies for HMMS-type reverse logistics system Int J Prod Econ 81-82 2003 351 360
    • (2003) Int J Prod Econ , vol.81-82 , pp. 351-360
    • Dobos, I.1
  • 7
    • 77955419848 scopus 로고    scopus 로고
    • A stochastic optimization model for integrated forward/reverse logistics network design
    • M.-R. Pishvaee, F. Jolai, and J. Razmi A stochastic optimization model for integrated forward/reverse logistics network design J Manuf Syst 28 4 2009 107 114
    • (2009) J Manuf Syst , vol.28 , Issue.4 , pp. 107-114
    • Pishvaee, M.-R.1    Jolai, F.2    Razmi, J.3
  • 9
    • 80055031645 scopus 로고    scopus 로고
    • Production planning of a hybrid manufacturing - Remanufacturing system under uncertainty within a closed-loop supply chain
    • J.-P. Kenne, P. Dejax, and A. Gharbi Production planning of a hybrid manufacturing - remanufacturing system under uncertainty within a closed-loop supply chain Int J Prod Econ 135 2012 81 93
    • (2012) Int J Prod Econ , vol.135 , pp. 81-93
    • Kenne, J.-P.1    Dejax, P.2    Gharbi, A.3
  • 10
    • 79955643668 scopus 로고    scopus 로고
    • A capacitated production planning problem for closed-loop supply chain with remanufacturing
    • J. Zhang, X. Liu, and Y.L. Tu A capacitated production planning problem for closed-loop supply chain with remanufacturing Int J Adv Manuf Technol 54 5-8 2011 757 766
    • (2011) Int J Adv Manuf Technol , vol.54 , Issue.5-8 , pp. 757-766
    • Zhang, J.1    Liu, X.2    Tu, Y.L.3
  • 13
    • 33846273647 scopus 로고    scopus 로고
    • Economic lot scheduling problem with returns
    • O. Tung, and R. Teunter Economic lot scheduling problem with returns Prod Oper Manage 15 4 2006 488 497
    • (2006) Prod Oper Manage , vol.15 , Issue.4 , pp. 488-497
    • Tung, O.1    Teunter, R.2
  • 14
    • 84890426554 scopus 로고    scopus 로고
    • On the optimal control of manufacturing and remanufacturing activities with a single shared server
    • S.M. Flapper, J.-P. Gayon, and L. Lim On the optimal control of manufacturing and remanufacturing activities with a single shared server Eur J Oper Res 234 2014 86 98
    • (2014) Eur J Oper Res , vol.234 , pp. 86-98
    • Flapper, S.M.1    Gayon, J.-P.2    Lim, L.3
  • 15
    • 3042546367 scopus 로고    scopus 로고
    • Scheduling jobs to improve weighted on-time performance of a single machine
    • N. Phojanamongkolkij, D. Grabenstetter, and O. Ghrayeb Scheduling jobs to improve weighted on-time performance of a single machine J Manuf Syst 22 2 2003 148 156
    • (2003) J Manuf Syst , vol.22 , Issue.2 , pp. 148-156
    • Phojanamongkolkij, N.1    Grabenstetter, D.2    Ghrayeb, O.3
  • 16
    • 84953369425 scopus 로고    scopus 로고
    • Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems
    • (in press)
    • T.-H. Su, and Y.-F. Lin Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems J Manuf Syst 2015 (in press)
    • (2015) J Manuf Syst
    • Su, T.-H.1    Lin, Y.-F.2
  • 17
    • 84951986222 scopus 로고    scopus 로고
    • Efficient multi-objective optimization of supply chain with returned products
    • (in press)
    • M. Godichaud, and L. Amodeo Efficient multi-objective optimization of supply chain with returned products J Manuf Syst 2015 (in press)
    • (2015) J Manuf Syst
    • Godichaud, M.1    Amodeo, L.2
  • 19
    • 0030210504 scopus 로고    scopus 로고
    • Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
    • M. ElHafsi, and S.X. Bai Optimal production and setup control of a dynamic two-product manufacturing system: analytical solution Math Comput Model 24 3 1996 57 78
    • (1996) Math Comput Model , vol.24 , Issue.3 , pp. 57-78
    • ElHafsi, M.1    Bai, S.X.2
  • 20
    • 0000861517 scopus 로고    scopus 로고
    • Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
    • M. Elhafsi, and S.X. Bai Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times J Global Optimiz 9 1996 183 216
    • (1996) J Global Optimiz , vol.9 , pp. 183-216
    • Elhafsi, M.1    Bai, S.X.2
  • 21
    • 0042683734 scopus 로고    scopus 로고
    • Production Scheduling of continuous flow lines with setup times and costs
    • F. Chen, H. Yan, and J. Yang Production Scheduling of continuous flow lines with setup times and costs Prod Oper Manage 7 4 1998 387 401
    • (1998) Prod Oper Manage , vol.7 , Issue.4 , pp. 387-401
    • Chen, F.1    Yan, H.2    Yang, J.3
  • 22
    • 0034558991 scopus 로고    scopus 로고
    • Optimal production and setup scheduling: A one machine, two product system
    • J. Yang, H. Yan, and M.I. Taksar Optimal production and setup scheduling: a one machine, two product system Ann Oper Res 98 2000 291 311
    • (2000) Ann Oper Res , vol.98 , pp. 291-311
    • Yang, J.1    Yan, H.2    Taksar, M.I.3
  • 23
    • 30844471148 scopus 로고    scopus 로고
    • Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups
    • A. Gharbi, J.P. Kenne, and A. Hajji Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups Int J Prod Res 44 3 2006 545 567
    • (2006) Int J Prod Res , vol.44 , Issue.3 , pp. 545-567
    • Gharbi, A.1    Kenne, J.P.2    Hajji, A.3
  • 25
    • 0024037430 scopus 로고
    • Optimality of zero inventory policies for unreliable manufacturing systems
    • T. Bielecki, and P. Kumar Optimality of zero inventory policies for unreliable manufacturing systems Oper Res 36 4 1988 532 541
    • (1988) Oper Res , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.