-
1
-
-
0031277045
-
Quantitative models for reverse logistics: A review
-
M. Fleischmann, J.M. Bloemhof-Ruwaard, R. Dekker, E. Van der Laan, J.A.E.E. Van Nunen et, and L.N. Van Wassenhove Quantitative models for reverse logistics: a review Eur J Oper Res 103 1 1997 1 17
-
(1997)
Eur J Oper Res
, vol.103
, Issue.1
, pp. 1-17
-
-
Fleischmann, M.1
Bloemhof-Ruwaard, J.M.2
Dekker, R.3
Van Der Laan, E.4
Van Nunen et, J.A.E.E.5
Van Wassenhove, L.N.6
-
2
-
-
0032642459
-
Production planning and control for remanufacturing: A state-of-The-art survey
-
V.D.R. Guide, V. Jayaraman, and R. Srivastava Production planning and control for remanufacturing: a state-of-the-art survey Rob Comput Integr Manuf 15 1999 221 230
-
(1999)
Rob Comput Integr Manuf
, vol.15
, pp. 221-230
-
-
Guide, V.D.R.1
Jayaraman, V.2
Srivastava, R.3
-
4
-
-
0037401491
-
Computational issues in a stochastic finite horizon one product recovery inventory model
-
G.P. Kiesmller, and C.W. Scherer Computational issues in a stochastic finite horizon one product recovery inventory model Eur J Oper Res 146 2003 553 579
-
(2003)
Eur J Oper Res
, vol.146
, pp. 553-579
-
-
Kiesmller, G.P.1
Scherer, C.W.2
-
5
-
-
0000683467
-
Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
-
K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes OR Spektrum 19 1997 111 122
-
(1997)
OR Spektrum
, vol.19
, pp. 111-122
-
-
Inderfurth, K.1
-
6
-
-
18344408880
-
Optimal production-inventory strategies for HMMS-type reverse logistics system
-
I. Dobos Optimal production-inventory strategies for HMMS-type reverse logistics system Int J Prod Econ 81-82 2003 351 360
-
(2003)
Int J Prod Econ
, vol.81-82
, pp. 351-360
-
-
Dobos, I.1
-
7
-
-
77955419848
-
A stochastic optimization model for integrated forward/reverse logistics network design
-
M.-R. Pishvaee, F. Jolai, and J. Razmi A stochastic optimization model for integrated forward/reverse logistics network design J Manuf Syst 28 4 2009 107 114
-
(2009)
J Manuf Syst
, vol.28
, Issue.4
, pp. 107-114
-
-
Pishvaee, M.-R.1
Jolai, F.2
Razmi, J.3
-
9
-
-
80055031645
-
Production planning of a hybrid manufacturing - Remanufacturing system under uncertainty within a closed-loop supply chain
-
J.-P. Kenne, P. Dejax, and A. Gharbi Production planning of a hybrid manufacturing - remanufacturing system under uncertainty within a closed-loop supply chain Int J Prod Econ 135 2012 81 93
-
(2012)
Int J Prod Econ
, vol.135
, pp. 81-93
-
-
Kenne, J.-P.1
Dejax, P.2
Gharbi, A.3
-
10
-
-
79955643668
-
A capacitated production planning problem for closed-loop supply chain with remanufacturing
-
J. Zhang, X. Liu, and Y.L. Tu A capacitated production planning problem for closed-loop supply chain with remanufacturing Int J Adv Manuf Technol 54 5-8 2011 757 766
-
(2011)
Int J Adv Manuf Technol
, vol.54
, Issue.5-8
, pp. 757-766
-
-
Zhang, J.1
Liu, X.2
Tu, Y.L.3
-
12
-
-
0032690281
-
Inventory control in hybrid systems with remanufacturing
-
E. Van der Laan, M. Salomon, R. Dekker, L.N. van, and Wassenhove Inventory control in hybrid systems with remanufacturing Manage Sci 45 1999 733 747
-
(1999)
Manage Sci
, vol.45
, pp. 733-747
-
-
Van Der Laan, E.1
Salomon, M.2
Dekker, R.3
Van, L.N.4
Wassenhove5
-
13
-
-
33846273647
-
Economic lot scheduling problem with returns
-
O. Tung, and R. Teunter Economic lot scheduling problem with returns Prod Oper Manage 15 4 2006 488 497
-
(2006)
Prod Oper Manage
, vol.15
, Issue.4
, pp. 488-497
-
-
Tung, O.1
Teunter, R.2
-
14
-
-
84890426554
-
On the optimal control of manufacturing and remanufacturing activities with a single shared server
-
S.M. Flapper, J.-P. Gayon, and L. Lim On the optimal control of manufacturing and remanufacturing activities with a single shared server Eur J Oper Res 234 2014 86 98
-
(2014)
Eur J Oper Res
, vol.234
, pp. 86-98
-
-
Flapper, S.M.1
Gayon, J.-P.2
Lim, L.3
-
15
-
-
3042546367
-
Scheduling jobs to improve weighted on-time performance of a single machine
-
N. Phojanamongkolkij, D. Grabenstetter, and O. Ghrayeb Scheduling jobs to improve weighted on-time performance of a single machine J Manuf Syst 22 2 2003 148 156
-
(2003)
J Manuf Syst
, vol.22
, Issue.2
, pp. 148-156
-
-
Phojanamongkolkij, N.1
Grabenstetter, D.2
Ghrayeb, O.3
-
16
-
-
84953369425
-
Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems
-
(in press)
-
T.-H. Su, and Y.-F. Lin Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems J Manuf Syst 2015 (in press)
-
(2015)
J Manuf Syst
-
-
Su, T.-H.1
Lin, Y.-F.2
-
17
-
-
84951986222
-
Efficient multi-objective optimization of supply chain with returned products
-
(in press)
-
M. Godichaud, and L. Amodeo Efficient multi-objective optimization of supply chain with returned products J Manuf Syst 2015 (in press)
-
(2015)
J Manuf Syst
-
-
Godichaud, M.1
Amodeo, L.2
-
19
-
-
0030210504
-
Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
-
M. ElHafsi, and S.X. Bai Optimal production and setup control of a dynamic two-product manufacturing system: analytical solution Math Comput Model 24 3 1996 57 78
-
(1996)
Math Comput Model
, vol.24
, Issue.3
, pp. 57-78
-
-
ElHafsi, M.1
Bai, S.X.2
-
20
-
-
0000861517
-
Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
-
M. Elhafsi, and S.X. Bai Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times J Global Optimiz 9 1996 183 216
-
(1996)
J Global Optimiz
, vol.9
, pp. 183-216
-
-
Elhafsi, M.1
Bai, S.X.2
-
21
-
-
0042683734
-
Production Scheduling of continuous flow lines with setup times and costs
-
F. Chen, H. Yan, and J. Yang Production Scheduling of continuous flow lines with setup times and costs Prod Oper Manage 7 4 1998 387 401
-
(1998)
Prod Oper Manage
, vol.7
, Issue.4
, pp. 387-401
-
-
Chen, F.1
Yan, H.2
Yang, J.3
-
22
-
-
0034558991
-
Optimal production and setup scheduling: A one machine, two product system
-
J. Yang, H. Yan, and M.I. Taksar Optimal production and setup scheduling: a one machine, two product system Ann Oper Res 98 2000 291 311
-
(2000)
Ann Oper Res
, vol.98
, pp. 291-311
-
-
Yang, J.1
Yan, H.2
Taksar, M.I.3
-
23
-
-
30844471148
-
Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups
-
A. Gharbi, J.P. Kenne, and A. Hajji Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups Int J Prod Res 44 3 2006 545 567
-
(2006)
Int J Prod Res
, vol.44
, Issue.3
, pp. 545-567
-
-
Gharbi, A.1
Kenne, J.P.2
Hajji, A.3
-
25
-
-
0024037430
-
Optimality of zero inventory policies for unreliable manufacturing systems
-
T. Bielecki, and P. Kumar Optimality of zero inventory policies for unreliable manufacturing systems Oper Res 36 4 1988 532 541
-
(1988)
Oper Res
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.2
|