메뉴 건너뛰기




Volumn 98, Issue 1-4, 2000, Pages 291-311

Optimal Production and Setup Scheduling: A One-Machine, Two-Product System

Author keywords

Controllable production rate; HJB equation; Production and setup scheduling

Indexed keywords


EID: 0034558991     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1019268710146     Document Type: Article
Times cited : (19)

References (9)
  • 1
    • 0020926514 scopus 로고
    • One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate
    • J.A. Buzacott and I.A. Ozkarahan, One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate, Naval Research Logistics Quarterly 30 (1983) 675-696.
    • (1983) Naval Research Logistics Quarterly , vol.30 , pp. 675-696
    • Buzacott, J.A.1    Ozkarahan, I.A.2
  • 2
    • 0042683734 scopus 로고    scopus 로고
    • Production scheduling of continuous flow lines with setup times and costs
    • F. Cheng, H. Yan and J. Yang, Production scheduling of continuous flow lines with setup times and costs, Production and Operations Management 7(4) (1998) 387-401.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 387-401
    • Cheng, F.1    Yan, H.2    Yang, J.3
  • 3
    • 0017931081 scopus 로고
    • The Economic Lot Scheduling Problem (ELSP): Review and extension
    • S.E. Elmaghraby, The Economic Lot Scheduling Problem (ELSP): Review and extension, Management Science 24(6) (1978) 587-598.
    • (1978) Management Science , vol.24 , Issue.6 , pp. 587-598
    • Elmaghraby, S.E.1
  • 4
    • 84872985507 scopus 로고
    • The common cycle economic lot scheduling problem with backorders: Benefits of controllable production rates
    • Department of Industrial and Systems Engineering, Univ. of Florida
    • M.E. Hafsi and S.X. Bai, The common cycle economic lot scheduling problem with backorders: Benefits of controllable production rates, Department of Industrial and Systems Engineering, Univ. of Florida, Research Report 95-01 (1994).
    • (1994) Research Report 95-01
    • Hafsi, M.E.1    Bai, S.X.2
  • 5
    • 84872998773 scopus 로고
    • Optimal production control of a dynamic two-product manufacturing system with setup cost and setup times
    • Department of Industrial and Systems Engineering, Univ. of Florida
    • M.E. Hafsi and S.X. Bai, Optimal production control of a dynamic two-product manufacturing system with setup cost and setup times, Department of Industrial and Systems Engineering, Univ. of Florida, Research Report 95-01 (1995).
    • (1995) Research Report 95-01
    • Hafsi, M.E.1    Bai, S.X.2
  • 7
    • 0010355050 scopus 로고    scopus 로고
    • Optimal Feedback controls in deterministic dynamic two-machine flowshops
    • S.P. Sethi and X.Y. Zhou, Optimal Feedback controls in deterministic dynamic two-machine flowshops, Operations Research Letters 19 (1996) 225-235.
    • (1996) Operations Research Letters , vol.19 , pp. 225-235
    • Sethi, S.P.1    Zhou, X.Y.2
  • 8
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • E.A. Silver, Deliberately slowing down output in a family production context, International Journal of Production Research 28 (1990) 17-27.
    • (1990) International Journal of Production Research , vol.28 , pp. 17-27
    • Silver, E.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.