메뉴 건너뛰기




Volumn 38, Issue , 2011, Pages 141-167

Adequacy assessment of wind-integrated composite generation and transmission systems

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING; INDUSTRIAL ENGINEERING;

EID: 84951821441     PISSN: 16147839     EISSN: 2196999X     Source Type: Book Series    
DOI: 10.1007/978-0-85729-088-5_4     Document Type: Chapter
Times cited : (4)

References (37)
  • 1
    • 0015330713 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • Billinton R (1972) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans PAS 9(2):649–660
    • (1972) IEEE Trans PAS , vol.9 , Issue.2 , pp. 649-660
    • Billinton, R.1
  • 2
    • 0021375288 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • Allan RN, Billinton R, Lee SH (1984) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans PAS 103(2):275–282
    • (1984) IEEE Trans PAS , vol.103 , Issue.2 , pp. 275-282
    • Allan, R.N.1    Billinton, R.2    Lee, S.H.3
  • 3
    • 0024103858 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • Allan RN, Billinton R, Shahidehpour SM, Singh C (1988) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans Power Syst 3(4):1555–1564
    • (1988) IEEE Trans Power Syst , vol.3 , Issue.4 , pp. 1555-1564
    • Allan, R.N.1    Billinton, R.2    Shahidehpour, S.M.3    Singh, C.4
  • 4
    • 0028370657 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation, 1987–1991
    • Allan RN, Billinton R, Breipohl AM, Grigg CH (1994) Bibliography on the application of probability methods in power system reliability evaluation, 1987–1991. IEEE Trans Power Syst 9(1):41–49
    • (1994) IEEE Trans Power Syst , vol.9 , Issue.1 , pp. 41-49
    • Allan, R.N.1    Billinton, R.2    Breipohl, A.M.3    Grigg, C.H.4
  • 5
    • 0033079764 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation: 1992–1996
    • Allan RN, Billinton R, Breipohl AM, Grigg CH (1999) Bibliography on the application of probability methods in power system reliability evaluation: 1992–1996. IEEE Trans Power Syst 14(1):51–57
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.1 , pp. 51-57
    • Allan, R.N.1    Billinton, R.2    Breipohl, A.M.3    Grigg, C.H.4
  • 6
    • 85008048742 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation 1996–1999
    • Billinton R, Fotuhi-Firuzabad M, Bertling L (2001) Bibliography on the application of probability methods in power system reliability evaluation 1996–1999. IEEE Trans Power Syst 16(4):595–602
    • (2001) IEEE Trans Power Syst , vol.16 , Issue.4 , pp. 595-602
    • Billinton, R.1    Fotuhi-Firuzabad, M.2    Bertling, L.3
  • 9
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • Billinton R, Chen H, Ghajar R (1996) Time-series models for reliability evaluation of power systems including wind energy. Microelectr Reliab 36(9):1253–1261
    • (1996) Microelectr Reliab , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 10
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • Giorsetto P, Utsurogi KF (1983) Development of a new procedure for reliability modeling of wind turbine generators. IEEE Trans Power Apparatus Syst 102(1):134–143
    • (1983) IEEE Trans Power Apparatus Syst , vol.102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.F.2
  • 11
    • 0026682336 scopus 로고
    • Incorporation of wind energy conversion systems in conventional generating capacity adequacy assessment
    • Billinton R, Chowdhury AA (1992) Incorporation of wind energy conversion systems in conventional generating capacity adequacy assessment. IEE Proc Gener Transm Distrib 139(1):47–56
    • (1992) IEE Proc Gener Transm Distrib , vol.139 , Issue.1 , pp. 47-56
    • Billinton, R.1    Chowdhury, A.A.2
  • 12
    • 4544255264 scopus 로고    scopus 로고
    • Generating capacity adequacy associated with wind energy
    • Billinton R, Bai G (2004) Generating capacity adequacy associated with wind energy. IEEE Trans Energy Convers 19(3):641–646
    • (2004) IEEE Trans Energy Convers , vol.19 , Issue.3 , pp. 641-646
    • Billinton, R.1    Bai, G.2
  • 13
    • 0030385334 scopus 로고    scopus 로고
    • A sequential simulation technique for adequacy evaluation of generating systems including wind energy
    • Billinton R, Chen H, Ghajar R (1996) A sequential simulation technique for adequacy evaluation of generating systems including wind energy. IEEE Trans Energy Convers 11(4):728–734
    • (1996) IEEE Trans Energy Convers , vol.11 , Issue.4 , pp. 728-734
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 14
    • 0026839776 scopus 로고
    • Sequential simulation applied to composite system reliability evaluation
    • Ubeda R, Allan RN (1992) Sequential simulation applied to composite system reliability evaluation. IEE Proc C 139(2):81–86
    • (1992) IEE Proc C , vol.139 , Issue.2 , pp. 81-86
    • Ubeda, R.1    Allan, R.N.2
  • 15
    • 0029354288 scopus 로고
    • Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads
    • Proceedings of the 8th international conference on probabilistic method applied to power systems, Ames, Iowa
    • Sankarakrishnan A, Billinton R (1995) Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads. IEEE Trans Power Syst 10(3):1540–1545 Proceedings of the 8th international conference on probabilistic method applied to power systems, Ames, Iowa, September
    • (1995) IEEE Trans Power Syst , vol.10 , Issue.3 , pp. 1540-1545
    • Sankarakrishnan, A.1    Billinton, R.2
  • 16
    • 33244490490 scopus 로고    scopus 로고
    • Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation
    • Billinton R, Wangdee W (2006) Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation. IEEE Trans Power Deliv 21(1):345–352
    • (2006) IEEE Trans Power Deliv , vol.21 , Issue.1 , pp. 345-352
    • Billinton, R.1    Wangdee, W.2
  • 17
    • 40849098849 scopus 로고    scopus 로고
    • Multi-state wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy
    • Billinton R, Gao Y (2008) Multi-state wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy. IEEE Trans Energy Convers 23(2):163–170
    • (2008) IEEE Trans Energy Convers , vol.23 , Issue.2 , pp. 163-170
    • Billinton, R.1    Gao, Y.2
  • 19
    • 33645664735 scopus 로고    scopus 로고
    • Impact of renewable energy unit availability on power system adequacy
    • Karki R, Billinton R (2006) Impact of renewable energy unit availability on power system adequacy. Int J Power Energy Syst 26(2):147–152
    • (2006) Int J Power Energy Syst , vol.26 , Issue.2 , pp. 147-152
    • Karki, R.1    Billinton, R.2
  • 20
    • 0024719222 scopus 로고
    • A reliability test system for educational purposes—basic data
    • Billinton R, Kumar S et al (1989) A reliability test system for educational purposes—basic data. IEEE Trans Power Syst 4(3):1238–1244
    • (1989) IEEE Trans Power Syst , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1    Kumar, S.2
  • 21
    • 33645729973 scopus 로고    scopus 로고
    • Predicting bulk system reliability performance indices using sequential Monte Carlo simulation
    • Billinton R, Wangdee W (2006) Predicting bulk system reliability performance indices using sequential Monte Carlo simulation. IEEE Trans Power Deliv 21(2):909–917
    • (2006) IEEE Trans Power Deliv , vol.21 , Issue.2 , pp. 909-917
    • Billinton, R.1    Wangdee, W.2
  • 24
    • 33947319093 scopus 로고    scopus 로고
    • Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment
    • Wangdee W, Billinton R (2006) Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment. IEEE Trans Energy Convers 21(3):734–741
    • (2006) IEEE Trans Energy Convers , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billinton, R.2
  • 25
    • 65349132534 scopus 로고    scopus 로고
    • Adequacy assessment of generating systems containing wind power considering wind speed correlation
    • Gao Y, Billinton R (2009) Adequacy assessment of generating systems containing wind power considering wind speed correlation. IET Renew Power Gener 3(2):217–226
    • (2009) IET Renew Power Gener , vol.3 , Issue.2 , pp. 217-226
    • Gao, Y.1    Billinton, R.2
  • 26
    • 33947301794 scopus 로고    scopus 로고
    • Reliability-based transmission reinforcement planning associated with large-scale wind farms
    • Billinton R, Wangdee W (2007) Reliability-based transmission reinforcement planning associated with large-scale wind farms. IEEE Trans Power Syst 22(1):34–41
    • (2007) IEEE Trans Power Syst , vol.22 , Issue.1 , pp. 34-41
    • Billinton, R.1    Wangdee, W.2
  • 28
    • 35748935557 scopus 로고    scopus 로고
    • Reliability assessment of bulk electric systems containing large wind farms
    • Wangdee W, Billinton R (2007) Reliability assessment of bulk electric systems containing large wind farms. Int J Electr Power Energy Syst 29(10):759–766
    • (2007) Int J Electr Power Energy Syst , vol.29 , Issue.10 , pp. 759-766
    • Wangdee, W.1    Billinton, R.2
  • 29
    • 68349135406 scopus 로고    scopus 로고
    • Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation
    • Billinton R, Gao Y, Karki R (2009) Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation. IEEE Trans Power Syst 24(3):1375–1382
    • (2009) IEEE Trans Power Syst , vol.24 , Issue.3 , pp. 1375-1382
    • Billinton, R.1    Gao, Y.2    Karki, R.3
  • 30
    • 0017943762 scopus 로고
    • Operating under stress and strain
    • Fink LH, Carlsen K (1978) Operating under stress and strain. IEEE Spectrum 15(3):48–53
    • (1978) IEEE Spectrum , vol.15 , Issue.3 , pp. 48-53
    • Fink, L.H.1    Carlsen, K.2
  • 31
    • 0023563981 scopus 로고
    • Composite system reliability evaluation: Phase I—Scoping study
    • EPRI Final Report
    • EPRI Final Report (1987) Composite system reliability evaluation: Phase I—Scoping study. Tech Report EPRI EL-5290, December
    • (1987) Tech Report EPRI EL-5290
  • 32
    • 0026820887 scopus 로고
    • A security based approach to composite power system reliability evaluation
    • Billinton R, Khan E (1992) A security based approach to composite power system reliability evaluation. IEEE Trans Power Syst 7(1):65–72
    • (1992) IEEE Trans Power Syst , vol.7 , Issue.1 , pp. 65-72
    • Billinton, R.1    Khan, E.2
  • 33
    • 0028428839 scopus 로고
    • Composite power system health analysis using a security constrained adequacy evaluation procedure
    • Billinton R, Lian G (1994) Composite power system health analysis using a security constrained adequacy evaluation procedure. IEEE Trans Power Syst 9(2):936–941
    • (1994) IEEE Trans Power Syst , vol.9 , Issue.2 , pp. 936-941
    • Billinton, R.1    Lian, G.2
  • 34
    • 0032592924 scopus 로고    scopus 로고
    • Application of Monte Carlo simulation to generating system well-being analysis
    • Billinton R, Karki R (1999) Application of Monte Carlo simulation to generating system well-being analysis. IEEE Trans Power Syst 14(3):1172–1177
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.3 , pp. 1172-1177
    • Billinton, R.1    Karki, R.2
  • 36
    • 32144438122 scopus 로고    scopus 로고
    • Bulk electric system well-being analysis using sequential Monte Carlo simulation
    • Wangdee W, Billinton R (2006) Bulk electric system well-being analysis using sequential Monte Carlo simulation. IEEE Trans Power Syst 21(1):188–193
    • (2006) IEEE Trans Power Syst , vol.21 , Issue.1 , pp. 188-193
    • Wangdee, W.1    Billinton, R.2
  • 37
    • 68349133642 scopus 로고    scopus 로고
    • Effects of wind power on bulk system adequacy evaluation using the well-being analysis framework
    • Huang D, Billinton R (2009) Effects of wind power on bulk system adequacy evaluation using the well-being analysis framework. IEEE Trans Power Syst 24(3):1232–1240
    • (2009) IEEE Trans Power Syst , vol.24 , Issue.3 , pp. 1232-1240
    • Huang, D.1    Billinton, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.