메뉴 건너뛰기




Volumn 24, Issue 3, 2009, Pages 1375-1382

Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation

Author keywords

Composite system adequacy assessment; Large scale wind farm; Wind speed correlation

Indexed keywords

COMPOSITE GENERATION AND TRANSMISSION SYSTEM; COMPOSITE SYSTEM ADEQUACY ASSESSMENT; COMPOSITE SYSTEMS; LARGE-SCALE WIND FARM; LOAD POINTS; MONTE CARLO SIMULATION TECHNIQUE; PRACTICAL SYSTEMS; RELIABILITY PERFORMANCE; TEST SYSTEMS; WIND ENERGY CONVERSION SYSTEM; WIND FARM; WIND SPEED; WIND SPEED CORRELATION;

EID: 68349135406     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2023263     Document Type: Article
Times cited : (117)

References (21)
  • 1
    • 68349126187 scopus 로고    scopus 로고
    • Utility Wind Integration State of the Art prepared by Utility Wind Integration Group incorporated with American Public Power Association (APPA), Edison Electric Institute (EEI) and National Rural Electric Cooperative Association (NRECA), May 2006. [Online]. Available: http://www.uwig.org.
    • "Utility Wind Integration State of the Art" prepared by Utility Wind Integration Group incorporated with American Public Power Association (APPA), Edison Electric Institute (EEI) and National Rural Electric Cooperative Association (NRECA), May 2006. [Online]. Available: http://www.uwig.org.
  • 2
    • 34548030244 scopus 로고    scopus 로고
    • Utility wind integration and operating impact state of the art
    • Aug
    • J. C. Smith, M. R. Milligan, E. A. DeMeo, and B. Parsons, "Utility wind integration and operating impact state of the art," IEEE Trans. Power Syst., vol. 22, no. 3, pp. 900-908, Aug. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.3 , pp. 900-908
    • Smith, J.C.1    Milligan, M.R.2    DeMeo, E.A.3    Parsons, B.4
  • 3
    • 46149090583 scopus 로고    scopus 로고
    • Wind farm modeling in reliability assessment of power system
    • Stockholm, Sweden, Jun
    • M. R. Haghifam and M. Omidvar, "Wind farm modeling in reliability assessment of power system," in Proc. 9th Int. Conf. PMAPS, Stockholm, Sweden, Jun. 2006.
    • (2006) Proc. 9th Int. Conf. PMAPS
    • Haghifam, M.R.1    Omidvar, M.2
  • 4
    • 27144467492 scopus 로고    scopus 로고
    • Reliability models for large wind farms in generation system planning
    • A. A. Chowdhury, "Reliability models for large wind farms in generation system planning," in Proc. IEEE Power Eng. Soc. General Meeting, 2005, vol. 2, pp. 1926-1933.
    • (2005) Proc. IEEE Power Eng. Soc. General Meeting , vol.2 , pp. 1926-1933
    • Chowdhury, A.A.1
  • 5
    • 0036969703 scopus 로고    scopus 로고
    • Probabilistic model of a two-site wind energy conversion system
    • Dec
    • S. H. Karaki, B. A. Salim, and R. B. Chedid, "Probabilistic model of a two-site wind energy conversion system," IEEE Trans. Energy Convers. vol. 17, no. 4, pp. 530-536, Dec. 2002.
    • (2002) IEEE Trans. Energy Convers , vol.17 , Issue.4 , pp. 530-536
    • Karaki, S.H.1    Salim, B.A.2    Chedid, R.B.3
  • 6
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol. 36, no. 9, pp. 1253-1261, 1996.
    • (1996) Microelectron. Reliab , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 7
    • 40849098849 scopus 로고    scopus 로고
    • Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy
    • Mar
    • R. Billinton and Y. Gao, "Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy," IEEE Trans. Energy Convers., vol. 23, no. 1, pp. 163-170, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers , vol.23 , Issue.1 , pp. 163-170
    • Billinton, R.1    Gao, Y.2
  • 8
    • 68349135986 scopus 로고    scopus 로고
    • Adequacy assessment of composite power generation and transmission systems with wind energy
    • R. Billinton and Y. Gao, "Adequacy assessment of composite power generation and transmission systems with wind energy," Int. J. Reliab. Safety, vol. 2, no. 1/2, pp. 79-98, 2008.
    • (2008) Int. J. Reliab. Safety , vol.2 , Issue.1-2 , pp. 79-98
    • Billinton, R.1    Gao, Y.2
  • 9
    • 33947671422 scopus 로고    scopus 로고
    • Aspects of relevance in offshore wind farm reliability assessment
    • Mar
    • N. B. Negra, O. Holmstrom, B. Bak-Jesen, and P. Sorensen, "Aspects of relevance in offshore wind farm reliability assessment," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 159-166, Mar. 2007.
    • (2007) IEEE Trans. Energy Convers , vol.22 , Issue.1 , pp. 159-166
    • Negra, N.B.1    Holmstrom, O.2    Bak-Jesen, B.3    Sorensen, P.4
  • 10
    • 0032684014 scopus 로고    scopus 로고
    • Reliability and production assessment of wind energy production connected to the electric network supply
    • Mar
    • J. R. Ubeda and M. A. R. Rodriguez Garcia, "Reliability and production assessment of wind energy production connected to the electric network supply," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 146, no. 2, pp. 169-175, Mar. 1999.
    • (1999) Proc. Inst. Elect. Eng., Gen., Transm., Distrib , vol.146 , Issue.2 , pp. 169-175
    • Ubeda, J.R.1    Rodriguez Garcia, M.A.R.2
  • 11
    • 36348957426 scopus 로고    scopus 로고
    • Impact of the wind geographical correlation level for reliability studies
    • Nov
    • F. Vallee, J. Lobry, and O. Deblecker, "Impact of the wind geographical correlation level for reliability studies," IEEE Trans. Power Syst. vol. 22, no. 4, pp. 2232-2239, Nov. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.4 , pp. 2232-2239
    • Vallee, F.1    Lobry, J.2    Deblecker, O.3
  • 12
    • 42549086105 scopus 로고    scopus 로고
    • Spatially correlated wind speed modelling for generation adequacy studies in the UK
    • Tampa, FL
    • M. S. Miranda and R. W. Dunn, "Spatially correlated wind speed modelling for generation adequacy studies in the UK," in Proc. IEEE Power Eng. Soc. General Meeting, Tampa, FL, 2007.
    • (2007) Proc. IEEE Power Eng. Soc. General Meeting
    • Miranda, M.S.1    Dunn, R.W.2
  • 13
    • 33947319093 scopus 로고    scopus 로고
    • Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment
    • Sep
    • W. Wangdee and R. Billinton, "Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment," IEEE Trans. Energy Convers., vol. 21, no. 3, pp. 734-741, Sep. 2006.
    • (2006) IEEE Trans. Energy Convers , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billinton, R.2
  • 14
    • 0024719222 scopus 로고
    • A reliability test system for educational purposes basic data
    • Aug
    • R. Billinton et al., "A reliability test system for educational purposes basic data," IEEE Trans. Power Syst., vol. 4, no. 3, pp. 1238-1244, Aug. 1989.
    • (1989) IEEE Trans. Power Syst , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1
  • 15
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE Task Force, Nov./Dec
    • IEEE Task Force, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans. Power App. Syst , vol.PAS-98 , pp. 2047-2054
  • 16
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators," IEEE Trans. Power App. Syst., vol. PAS-102, no. 1, pp. 134-143, 1983.
    • (1983) IEEE Trans. Power App. Syst , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.F.2
  • 20
    • 4944255808 scopus 로고    scopus 로고
    • Identifying transmission deficiencies in composite electric power systems
    • R. Billinton and Y. Li, "Identifying transmission deficiencies in composite electric power systems," in Proc. Can. Conf. Electrical and Computer Engineering, 2004, vol. 4, pp. 2409-2413.
    • (2004) Proc. Can. Conf. Electrical and Computer Engineering , vol.4 , pp. 2409-2413
    • Billinton, R.1    Li, Y.2
  • 21
    • 68349158332 scopus 로고    scopus 로고
    • 2004 Forced Outage Performance of Transmission Equipment, Canadian Electricity Association.
    • 2004 Forced Outage Performance of Transmission Equipment, Canadian Electricity Association.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.