메뉴 건너뛰기




Volumn 24, Issue 3, 2009, Pages 1232-1240

Effects of wind power on bulk system adequacy evaluation using the well-being analysis framework

Author keywords

Bulk power system; Frequency and average duration; Operating state; Probability; Well being analysis; Wind power

Indexed keywords

ADEQUACY EVALUATION; BULK POWER SYSTEM; BULK POWER SYSTEMS; BULK SYSTEM; DETERMINISTIC AND PROBABILISTIC APPROACHES; FREQUENCY AND AVERAGE DURATION; GENERATING CAPACITY; LOAD FORECAST UNCERTAINTY; OPERATING STATE; RELIABILITY INDEX; SECURITY ASSESSMENT; SEQUENTIAL MONTE CARLO SIMULATION;

EID: 68349133642     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2021232     Document Type: Article
Times cited : (40)

References (18)
  • 3
    • 0017943762 scopus 로고
    • Operating under stress and strain
    • Mar
    • L. H. Fink and K. Carlsen, "Operating under stress and strain," IEEE Spectrum, vol. 15, no. 3, pp. 48-53, Mar. 1978.
    • (1978) IEEE Spectrum , vol.15 , Issue.3 , pp. 48-53
    • Fink, L.H.1    Carlsen, K.2
  • 4
    • 68349125564 scopus 로고
    • System Reliability Evaluation: Phase I - Scoping Study, EPRI Fin. Rep
    • Tech. Rep. EPRI EL-5290, Dec
    • Composite System Reliability Evaluation: Phase I - Scoping Study, EPRI Fin. Rep., Tech. Rep. EPRI EL-5290, Dec. 1987.
    • (1987)
    • Composite1
  • 5
    • 0026820887 scopus 로고
    • A security based approach to composite power system reliability evaluation
    • Feb
    • R. Billinton and E. Khan, "A security based approach to composite power system reliability evaluation," IEEE Trans. Power Syst., vol. 7, no. 1, pp. 65-72, Feb. 1992.
    • (1992) IEEE Trans. Power Syst , vol.7 , Issue.1 , pp. 65-72
    • Billinton, R.1    Khan, E.2
  • 6
    • 0028428839 scopus 로고
    • Composite power system health analysis using a security constrained adequacy evaluation procedure
    • May
    • R. Billinton and G. Lian, "Composite power system health analysis using a security constrained adequacy evaluation procedure," IEEE Trans. Power Syst., vol. 9, no. 2, pp. 936-941, May 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.2 , pp. 936-941
    • Billinton, R.1    Lian, G.2
  • 7
    • 0032592924 scopus 로고    scopus 로고
    • Application of Monte Carlo simulation to generating system well-being analysis
    • Aug
    • R. Billinton and R. Karki, "Application of Monte Carlo simulation to generating system well-being analysis," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1172-1177, Aug. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.3 , pp. 1172-1177
    • Billinton, R.1    Karki, R.2
  • 9
    • 32144438122 scopus 로고    scopus 로고
    • Bulk electric system well-being analysis using sequential Monte Carlo simulation
    • Feb
    • W. Wandee and R. Billinton, "Bulk electric system well-being analysis using sequential Monte Carlo simulation," IEEE Trans. Power Syst. vol. 21, no. 1, pp. 188-193, Feb. 2006.
    • (2006) IEEE Trans. Power Syst , vol.21 , Issue.1 , pp. 188-193
    • Wandee, W.1    Billinton, R.2
  • 10
    • 77956447868 scopus 로고    scopus 로고
    • Wind energy considerations in generating capacity adequacy assessment
    • Calgary, AB, Canada, Aug
    • R. Billinton, R. Karki, Y. Gao, P. Hu, and D. Huang, "Wind energy considerations in generating capacity adequacy assessment," in Proc. CIGRE Canada Conf., Calgary, AB, Canada, Aug. 2007.
    • (2007) Proc. CIGRE Canada Conf
    • Billinton, R.1    Karki, R.2    Gao, Y.3    Hu, P.4    Huang, D.5
  • 11
    • 43849084987 scopus 로고    scopus 로고
    • Effects of load forecast uncertainty on bulk electric system reliability evaluation
    • May
    • R. Billinton and D. Huang, "Effects of load forecast uncertainty on bulk electric system reliability evaluation," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 418-425, May 2008.
    • (2008) IEEE Trans. Power Syst , vol.23 , Issue.2 , pp. 418-425
    • Billinton, R.1    Huang, D.2
  • 12
    • 0024719222 scopus 로고
    • A reliability test system for educational purposes-basic data
    • Aug
    • R. Billinton et al., "A reliability test system for educational purposes-basic data," IEEE Trans. Power Syst., vol. 4, no. 3, pp. 1238-1244, Aug. 1989.
    • (1989) IEEE Trans. Power Syst , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1
  • 13
    • 0018544097 scopus 로고    scopus 로고
    • Reliability Test System Task Force of the IEEE Subcommittee on the Application of Probability Methods, IEEE reliability test system, IEEE Trans. Power App. Syst, PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979
    • Reliability Test System Task Force of the IEEE Subcommittee on the Application of Probability Methods, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
  • 15
    • 0023291420 scopus 로고
    • Efficient bounding method for linear contingency analysis
    • Feb
    • V. Brandwajn, "Efficient bounding method for linear contingency analysis," IEEE Trans. Power Syst., vol. 3, no. 1, pp. 38-43, Feb. 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.1 , pp. 38-43
    • Brandwajn, V.1
  • 16
    • 4544255264 scopus 로고    scopus 로고
    • Generating capacity adequacy associated with wind energy
    • Sep
    • R. Billinton and G. Bai, "Generating capacity adequacy associated with wind energy," IEEE Trans. Energy Convers., vol. 19, no. 3, pp. 641-646, Sep. 2004.
    • (2004) IEEE Trans. Energy Convers , vol.19 , Issue.3 , pp. 641-646
    • Billinton, R.1    Bai, G.2
  • 17
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • Nov. 9
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol. 36, pp. 1253-1261, Nov. 9, 1996.
    • (1996) Microelectron. Reliab , vol.36 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 18
    • 33244490490 scopus 로고    scopus 로고
    • Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation
    • Jan
    • R. Billinton and W. Wangdee, "Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation," IEEE Trans. Power Del., vol. 21, no. 1, pp. 345-352, Jan. 2006.
    • (2006) IEEE Trans. Power Del , vol.21 , Issue.1 , pp. 345-352
    • Billinton, R.1    Wangdee, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.