메뉴 건너뛰기




Volumn 23, Issue 5, 2017, Pages 764-779

A literature review of the factors limiting the application of BIM in the construction industry

Author keywords

BIM; building information modeling; construction industry

Indexed keywords


EID: 84946429659     PISSN: 20294913     EISSN: 20294921     Source Type: Journal    
DOI: 10.3846/20294913.2015.1087071     Document Type: Review
Times cited : (145)

References (62)
  • 1
    • 84884503238 scopus 로고    scopus 로고
    • Requirements for BIM platforms in the concrete reinforcement supply chain
    • Aram, S.,; Eastman, C.,; Sacks, R., 2013. Requirements for BIM platforms in the concrete reinforcement supply chain, Automation in Construction 35:1–17. http://dx.doi.org/10.1016/j.autcon.2013.01.013
    • (2013) Automation in Construction , vol.35 , pp. 1-17
    • Aram, S.1    Eastman, C.2    Sacks, R.3
  • 3
    • 79551686205 scopus 로고    scopus 로고
    • Technology adoption in the BIM implementation for lean architectural practice
    • Arayici, Y.,; Coates, P.,; Koskela, L.,; Kagioglou, M.,; Usher, C.,; O'Reilly, K., 2011. Technology adoption in the BIM implementation for lean architectural practice, Automation in Construction 20(2):189–195. http://dx.doi.org/10.1016/j.autcon.2010.09.016
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 189-195
    • Arayici, Y.1    Coates, P.2    Koskela, L.3    Kagioglou, M.4    Usher, C.5    O'Reilly, K.6
  • 4
    • 85020972773 scopus 로고    scopus 로고
    • Autodesk building industry solutions: building information modeling (white paper) [online], [cited 18 June 2009]
    • Autodesk, Inc. 2002. Autodesk building industry solutions:building information modeling (white paper) [online], [cited 18 June 2009]. Available from Internet:http://www.laiserin.com
    • (2002) Available from Internet:
    • Autodesk, I.1
  • 5
    • 85020948126 scopus 로고    scopus 로고
    • The five fallacies of BIM [online], [cited 11 May 2010]
    • Autodesk, Inc. 2008. The five fallacies of BIM [online], [cited 11 May 2010]. Available from Internet:http://www.cadalyst.com/aec/the-five-fallacies-bim-part-1-1-2-3-revit-tutorial-3688
    • (2008) Available from Internet:
    • Autodesk, I.1
  • 6
    • 85020997667 scopus 로고    scopus 로고
    • Building information modeling [online], [cited 8 June 2012]
    • Autodesk, Inc. 2012. Building information modeling [online], [cited 8 June 2012]. Available from Internet:http://usa.autodesk.com
    • (2012) Available from Internet:
    • Autodesk, I.1
  • 7
    • 79960266940 scopus 로고    scopus 로고
    • Building information modeling (BIM): a new paradigm for visual interactive modeling and simulation for construction projects
    • 4–5 August 2008, Karachi, Pakistan:
    • Azhar, S.,; Abid, N.,; Mok, J.,; Leung, B., 2008. Building information modeling (BIM):a new paradigm for visual interactive modeling and simulation for construction projects, in Proc. of the 1th International Conference on Construction in Developing Countries (ICCIDC–I), 4–5 August 2008, Karachi, Pakistan, 435–446.
    • (2008) Proc. of the 1th International Conference on Construction in Developing Countries (ICCIDC–I) , pp. 435-446
    • Azhar, S.1    Abid, N.2    Mok, J.3    Leung, B.4
  • 8
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
    • Azhar, S.,; Hein, M.,; Sketo, B., 2011. Building information modeling (BIM):trends, benefits, risks, and challenges for the AEC industry, Leadership and Management in Engineering 11(3):241–252. http://dx.doi.org/10.1061/(ASCE)LM.1943-5630.0000127
    • (2011) Leadership and Management in Engineering , vol.11 , Issue.3 , pp. 241-252
    • Azhar, S.1    Hein, M.2    Sketo, B.3
  • 9
    • 60449086917 scopus 로고    scopus 로고
    • Unique requirements of building information modeling for cast-in-place reinforced concrete
    • Barak, R.,; Jeong, Y. S.,; Sacks, R.,; Eastman, C. M., 2009. Unique requirements of building information modeling for cast-in-place reinforced concrete, Journal of Computing in Civil Engineering 23(2):64–74.
    • (2009) Journal of Computing in Civil Engineering , vol.23 , Issue.2 , pp. 64-74
    • Barak, R.1    Jeong, Y.S.2    Sacks, R.3    Eastman, C.M.4
  • 11
    • 84922503107 scopus 로고    scopus 로고
    • Practices and effectiveness of building information modelling inconstruction projects in China
    • Cao, D.,; Wang, G.,; Li, H.,; Skitmore, M.,; Huang, T.,; Zhang, W., 2015. Practices and effectiveness of building information modelling inconstruction projects in China, Automation in Construction 49:113–122. http://dx.doi.org/10.1016/j.autcon.2014.10.014
    • (2015) Automation in Construction , vol.49 , pp. 113-122
    • Cao, D.1    Wang, G.2    Li, H.3    Skitmore, M.4    Huang, T.5    Zhang, W.6
  • 12
    • 84930762229 scopus 로고    scopus 로고
    • Bridging BIM and building: from a literature review to an integrated conceptual framework
    • Chen, K.,; Lu, W.,; Peng, Y.,; Rowlinson, S.,; Huang, Q., 2015. Bridging BIM and building:from a literature review to an integrated conceptual framework, Internal Journal of Project Management 33(6):1404–1416. http://dx.doi.org/10.1016/j.ijproman.2015.03.006
    • (2015) Internal Journal of Project Management , vol.33 , Issue.6 , pp. 1404-1416
    • Chen, K.1    Lu, W.2    Peng, Y.3    Rowlinson, S.4    Huang, Q.5
  • 13
    • 84907426904 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD
    • Ding, L.,; Zhou, Y.,; Akinci, B., 2014. Building Information Modeling (BIM) application framework:the process of expanding from 3D to computable nD, Automation in Construction 46:82–93. http://dx.doi.org/10.1016/j.autcon.2014.04.009
    • (2014) Automation in Construction , vol.46 , pp. 82-93
    • Ding, L.1    Zhou, Y.2    Akinci, B.3
  • 14
    • 84900427828 scopus 로고    scopus 로고
    • A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics
    • Dong, B.,; O'Neill, Z.,; Li, Z., 2014. A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics, Automation in Construction 44:197–211. http://dx.doi.org/10.1016/j.autcon.2014.04.007
    • (2014) Automation in Construction , vol.44 , pp. 197-211
    • Dong, B.1    O'Neill, Z.2    Li, Z.3
  • 15
    • 84885086703 scopus 로고    scopus 로고
    • BIM implementation throughout the UK construction project lifecycle: an analysis
    • Eadie, R.,; Browne, M.,; Odeyinka, H.,; McKeown, C.,; McNiff, S., 2013. BIM implementation throughout the UK construction project lifecycle:an analysis, Automation in Construction 36:145–151. http://dx.doi.org/10.1016/j.autcon.2013.09.001
    • (2013) Automation in Construction , vol.36 , pp. 145-151
    • Eadie, R.1    Browne, M.2    Odeyinka, H.3    McKeown, C.4    McNiff, S.5
  • 17
    • 85021013274 scopus 로고    scopus 로고
    • Fischer, M.,; Kunz, J., 2004, The scope and role of information technology in construction [online], [cited 12 November 2010]. Available from Internet:www-leland.stanford.edu
    • (2004)
    • Fischer, M.1    Kunz, J.2
  • 18
    • 79954519538 scopus 로고    scopus 로고
    • The pace of technological innovation in architecture, engineering, and construction education: integrating recent trends into the curricula
    • Gerber, B. B.,; Gerber, D.J.,; Ku, K., 2011. The pace of technological innovation in architecture, engineering, and construction education:integrating recent trends into the curricula, Journal of Information Technology in Construction 16:411–432.
    • (2011) Journal of Information Technology in Construction , vol.16 , pp. 411-432
    • Gerber, B.B.1    Gerber, D.J.2    Ku, K.3
  • 21
    • 84882317757 scopus 로고    scopus 로고
    • Return on investment analysis of using building information modeling in construction
    • Giel, B. K.,; Issa, R. A., 2013. Return on investment analysis of using building information modeling in construction, Journal of Computing in Civil Engineering 27(5):511–521. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000164
    • (2013) Journal of Computing in Civil Engineering , vol.27 , Issue.5 , pp. 511-521
    • Giel, B.K.1    Issa, R.A.2
  • 22
    • 85020961061 scopus 로고    scopus 로고
    • VDC Use in 2007: significant value, dramatic growth, and apparent business opportunity (CIFE technical reports) [online], [cited 11 December 2010]
    • Gilligan, B.; Kunz, J. 2007. VDC Use in 2007:significant value, dramatic growth, and apparent business opportunity (CIFE technical reports) [online], [cited 11 December 2010]. Available from Internet:http://cife.stanford.edu
    • (2007) Available from Internet:
    • Gilligan, B.1    Kunz, J.2
  • 23
    • 84912575860 scopus 로고    scopus 로고
    • Does size matter? Experiences and perspectives of BIM implementation from large and SME construction contractors
    • 5–7 September 2012, Northumbria University, Newcastle upon Tyne, UK:
    • Gledson, B.,; Henry, D.,; Bleanch, P., 2012. Does size matter? Experiences and perspectives of BIM implementation from large and SME construction contractors, in Proc. of 1st UK Academic Conference on Building Information Management (BIM), 5–7 September 2012, Northumbria University, Newcastle upon Tyne, UK, 5–7.
    • (2012) Proc. of 1st UK Academic Conference on Building Information Management (BIM) , pp. 5-7
    • Gledson, B.1    Henry, D.2    Bleanch, P.3
  • 24
    • 85021046077 scopus 로고    scopus 로고
    • GSA building information modeling guide series 01–overview [online], [cited 14 May 2010]
    • General Services Administration (GSA). 2007. GSA building information modeling guide series 01–overview [online], [cited 14 May 2010]. Available from Internet:http://www.gsa.gov
    • (2007) Available from Internet:
    • Administration, G.S.1
  • 26
    • 84887838871 scopus 로고    scopus 로고
    • A conceptual framework to support solar PV simulation using an open-BIM data exchange standard
    • Gupta, A.,; Cemesova, A.,; Hopfe, C. J.,; Rezgui, Y.,; Sweet, T., 2014. A conceptual framework to support solar PV simulation using an open-BIM data exchange standard, Automation in Construction 37:166–181. http://dx.doi.org/10.1016/j.autcon.2013.10.005
    • (2014) Automation in Construction , vol.37 , pp. 166-181
    • Gupta, A.1    Cemesova, A.2    Hopfe, C.J.3    Rezgui, Y.4    Sweet, T.5
  • 28
    • 85021017002 scopus 로고    scopus 로고
    • Harness, S. H. 2008. 2008 documents AIA advance the use of BIM and integrated project delivery [online], [cited 5 December 2008]
    • Harness, S. H. 2008. 2008 documents AIA advance the use of BIM and integrated project delivery [online], [cited 5 December 2008]. Available from Internet:http://www.aia.org
  • 29
    • 85020995193 scopus 로고    scopus 로고
    • Hartmann, T.; Fischer, M. 2008. Applications of BIM and teaching strategy for widespread adoption of BIM, Stanford University [online], [cited 9 August 2009]. Available from Internet:. stanford.edu
    • Hartmann, T.; Fischer, M. 2008. Applications of BIM and teaching strategy for widespread adoption of BIM, Stanford University [online], [cited 9 August 2009]. Available from Internet:http://cife. stanford.edu
  • 32
    • 77956386598 scopus 로고    scopus 로고
    • BIM for integration of automated real-time project control systems
    • Hwang, S.,; Liu, L. Y., 2010. BIM for integration of automated real-time project control systems, Construction Research Congress 509–517. http://dx.doi.org/10.1061/41109(373)51
    • (2010) Construction Research Congress , pp. 509-517
    • Hwang, S.1    Liu, L.Y.2
  • 34
    • 84872513273 scopus 로고    scopus 로고
    • Building information modeling and integrated project delivery in the commercial construction industry: a conceptual study
    • Ilozor, B. D.,; Kelly, D. J., 2012. Building information modeling and integrated project delivery in the commercial construction industry:a conceptual study, Journal of Engineering, Project, and Production Management 2(1):23–36.
    • (2012) Journal of Engineering, Project, and Production Management , vol.2 , Issue.1 , pp. 23-36
    • Ilozor, B.D.1    Kelly, D.J.2
  • 37
    • 84876135548 scopus 로고    scopus 로고
    • Energy modeling system using building information modeling (BIM) open standards
    • Kim, H.,; Anderson, K., 2012. Energy modeling system using building information modeling (BIM) open standards, Journal of Computing in Civil Engineering 27(3):203–211. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000215
    • (2012) Journal of Computing in Civil Engineering , vol.27 , Issue.3 , pp. 203-211
    • Kim, H.1    Anderson, K.2
  • 38
    • 85021019501 scopus 로고    scopus 로고
    • Comparing Pommes and Naranjas [online], [cited 13 November 2010]
    • Laiserin, J. 2002. Comparing Pommes and Naranjas [online], [cited 13 November 2010]. Available from Internet:http://www.laiserin.com
    • (2002) Available from Internet:
    • Laiserin, J.1
  • 39
    • 84986170558 scopus 로고    scopus 로고
    • Building information modeling: the UK legal context
    • McAdam, B., 2010. Building information modeling:the UK legal context, International Journal of Law in the Built Environment 2(3):246–259. http://dx.doi.org/10.1108/17561451011087337
    • (2010) International Journal of Law in the Built Environment , vol.2 , Issue.3 , pp. 246-259
    • McAdam, B.1
  • 41
    • 84897380121 scopus 로고    scopus 로고
    • Beyond the BIM utopia: approaches to the development and implementation of building information modeling
    • Miettinen, R.,; Paavola, S., 2014. Beyond the BIM utopia:approaches to the development and implementation of building information modeling, Automation in Construction 43:84–91. http://dx.doi.org/10.1016/j.autcon.2014.03.009
    • (2014) Automation in Construction , vol.43 , pp. 84-91
    • Miettinen, R.1    Paavola, S.2
  • 43
    • 84891675789 scopus 로고    scopus 로고
    • The benefits, obstacles and problems of practical BIM implementation
    • Migilinskas, D.,; Popov, V.,; Juocevicius, V.,; Ustinovichius, L., 2013. The benefits, obstacles and problems of practical BIM implementation, Procedia Engineering 57:767–774. http://dx.doi.org/10.1016/j.proeng.2013.04.097
    • (2013) Procedia Engineering , vol.57 , pp. 767-774
    • Migilinskas, D.1    Popov, V.2    Juocevicius, V.3    Ustinovichius, L.4
  • 44
    • 85021039493 scopus 로고    scopus 로고
    • National BIM Standard Version 1 - Part 1: Overview, Principles, and Methodologies [online], [cited 18 December 2009]
    • National Institute of Builkding Sciences (NIBS). 2007. National BIM Standard Version 1 - Part 1:Overview, Principles, and Methodologies [online], [cited 18 December 2009]. Available from Internet:http://www.wbdg.org
    • (2007) Available from Internet:
  • 48
    • 84872240863 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) partnering framework for public construction projects
    • Porwal, A.,; Hewage, N. K., 2013. Building Information Modeling (BIM) partnering framework for public construction projects, Automation in Construction 31:204–214. http://dx.doi.org/10.1016/j.autcon.2012.12.004
    • (2013) Automation in Construction , vol.31 , pp. 204-214
    • Porwal, A.1    Hewage, N.K.2
  • 49
    • 57549103691 scopus 로고    scopus 로고
    • Building Information Modeling snags don't dampen spirits
    • Post, N. M., 2008. Building Information Modeling snags don't dampen spirits, ENR:Engineering News-Record 261(17):30–32.
    • (2008) ENR: Engineering News-Record , vol.261 , Issue.17 , pp. 30-32
    • Post, N.M.1
  • 50
    • 79953733556 scopus 로고    scopus 로고
    • Past, present and future of information and knowledge sharing in the construction industry: towards semantic service-based e-construction?
    • Rezgui, Y.,; Boddy, S.,; Wetherill, M.,; Cooper, G., 2011. Past, present and future of information and knowledge sharing in the construction industry:towards semantic service-based e-construction?, Computer Aided Design 43(5):502–515. http://dx.doi.org/10.1016/j.cad.2009.06.005
    • (2011) Computer Aided Design , vol.43 , Issue.5 , pp. 502-515
    • Rezgui, Y.1    Boddy, S.2    Wetherill, M.3    Cooper, G.4
  • 51
    • 84876757253 scopus 로고    scopus 로고
    • A governance approach for BIM management across lifecycle and supply chains using mixed-modes of information delivery
    • Rezgui, Y.,; Beach, T.,; Rana, O., 2013. A governance approach for BIM management across lifecycle and supply chains using mixed-modes of information delivery, Journal of Civil Engineering and Management 19(2):239–258. http://dx.doi.org/10.3846/13923730.2012.760480
    • (2013) Journal of Civil Engineering and Management , vol.19 , Issue.2 , pp. 239-258
    • Rezgui, Y.1    Beach, T.2    Rana, O.3
  • 52
    • 73949102330 scopus 로고    scopus 로고
    • Teaching Building Information Modeling as an integral part of freshman year civil engineering education
    • Sacks, R.,; Barak, R., 2010. Teaching Building Information Modeling as an integral part of freshman year civil engineering education, Journal of Professional Issues in Engineering Education and Practices 136(1):30–38. http://dx.doi.org/10.1061/(ASCE)EI.1943-5541.0000003
    • (2010) Journal of Professional Issues in Engineering Education and Practices , vol.136 , Issue.1 , pp. 30-38
    • Sacks, R.1    Barak, R.2
  • 53
    • 85020968361 scopus 로고    scopus 로고
    • Building Information Modeling and interoperability [online], [cited 25 June 2014]
    • Santos, E. T. 2009. Building Information Modeling and interoperability [online], [cited 25 June 2014]. Available from Internet:http://cumincades.scix.net
    • (2009) Available from Internet:
    • Santos, E.T.1
  • 54
    • 57749169961 scopus 로고    scopus 로고
    • Building information model based energy/exergy performance assessment in early design stages
    • Schlueter, A.,; Thesseling, F., 2009. Building information model based energy/exergy performance assessment in early design stages, Automation in Construction 18(2):153–163. http://dx.doi.org/10.1016/j.autcon.2008.07.003
    • (2009) Automation in Construction , vol.18 , Issue.2 , pp. 153-163
    • Schlueter, A.1    Thesseling, F.2
  • 55
    • 79551689722 scopus 로고    scopus 로고
    • A theoretical framework of a BIM-based multi-disciplinary collaboration platform
    • Singh, V.,; Gu, N.,; Wang, X., 2011. A theoretical framework of a BIM-based multi-disciplinary collaboration platform, Automation in Construction 20(2):134–144. http://dx.doi.org/10.1016/j.autcon.2010.09.011
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 134-144
    • Singh, V.1    Gu, N.2    Wang, X.3
  • 56
    • 59049095324 scopus 로고    scopus 로고
    • Building information modelling framework: a research and delivery foundation for industry stakeholders
    • Succar, B., 2009. Building information modelling framework:a research and delivery foundation for industry stakeholders, Automation in Construction 18:357–375. http://dx.doi.org/10.1016/j.autcon.2008.10.003
    • (2009) Automation in Construction , vol.18 , pp. 357-375
    • Succar, B.1
  • 57
    • 85020960214 scopus 로고    scopus 로고
    • Basic concepts [online], [cited 16 January 2013]
    • Tekla Corporation. 2013, Basic concepts [online], [cited 16 January 2013]. Available from Internet:http://www.tekla.com
    • (2013) Available from Internet:
    • Corporation, T.1
  • 58
    • 84890525940 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) for existing buildings–literature review and future needs
    • Volk, R.,; Stengel, J.,; Schumann, F., 2014. Building Information Modeling (BIM) for existing buildings–literature review and future needs, Automation in Construction 38:109–127. http://dx.doi.org/10.1016/j.autcon.2013.10.023
    • (2014) Automation in Construction , vol.38 , pp. 109-127
    • Volk, R.1    Stengel, J.2    Schumann, F.3
  • 61
    • 84883221020 scopus 로고    scopus 로고
    • Study on barriers of Implementing BIM in engineering design industry in China
    • (in Chinese
    • Zhang, J., 2010. Study on barriers of Implementing BIM in engineering design industry in China, Journal of Engineering Management 24(4):387–392. (in Chinese).
    • (2010) Journal of Engineering Management , vol.24 , Issue.4 , pp. 387-392
    • Zhang, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.