Volumn 7, Issue 4, 2015, Pages 464-483

Economic lot sizing for unreliable production system with shortages

Author keywords

Adaptive network based fuzzy inference system; ANFIS; Inventory; Lot sizing; Preventive maintenance; Shortage; Unreliable machine

Indexed keywords


EID: 84944676412     PISSN: 17575850     EISSN: 17575869     Source Type: Journal    
DOI: 10.1504/IJMOR.2015.070198     Document Type: Article
Times cited : (8)

References (33)
  • 1
    • 84875327847 scopus 로고    scopus 로고
    • An ANFIS-based approach for predicting the manning roughness coefficient in alluvial channels at the bank-full stage
    • Bahramifar, A., Shirkhani, R. and Mohammadi, M. (2013) 'An ANFIS-based approach for predicting the manning roughness coefficient in alluvial channels at the bank-full stage', IJE Transactions B: Applications, Vol. 26, No. 2, pp.177-186.
    • (2013) IJE Transactions B: Applications , vol.26 , Issue.2 , pp. 177-186
    • Bahramifar, A.1    Shirkhani, R.2    Mohammadi, M.3
  • 2
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben-Daya, M. (2002) 'The economic production lot-sizing problem with imperfect production processes and imperfect maintenance', International Journal of Production Economics, Vol. 76, No. 3, pp.257-264.
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 257-264
    • Ben-Daya, M.1
  • 3
    • 84878189291 scopus 로고    scopus 로고
    • Joint effect of stock threshold level and production policy on an unreliable production environment
    • Chakraborty, T., Chauhan, S.C. and Giri, B.C. (2013) 'Joint effect of stock threshold level and production policy on an unreliable production environment', Applied Mathematical Modelling, Vol. 37, Nos. 10-11, pp.6593-6608.
    • (2013) Applied Mathematical Modelling , vol.37 , Issue.10-11 , pp. 6593-6608
    • Chakraborty, T.1    Chauhan, S.C.2    Giri, B.C.3
  • 4
    • 46149086146 scopus 로고    scopus 로고
    • Production lot sizing with process deterioration and machine breakdown under inspection schedule
    • Chakraborty, T., Giri, B.C. and Chaudhuri, K.S. (2009) 'Production lot sizing with process deterioration and machine breakdown under inspection schedule', Omega, Vol. 37, No. 2, pp.257-271.
    • (2009) Omega , vol.37 , Issue.2 , pp. 257-271
    • Chakraborty, T.1    Giri, B.C.2    Chaudhuri, K.S.3
  • 5
    • 70350622445 scopus 로고    scopus 로고
    • Robust planning in optimization for production system subject to random machine breakdown and failure in rework
    • Chiu, S.W. (2010) 'Robust planning in optimization for production system subject to random machine breakdown and failure in rework', Computers & Operations Research, Vol. 37, No. 5, pp.899-908.
    • (2010) Computers & Operations Research , vol.37 , Issue.5 , pp. 899-908
    • Chiu, S.W.1
  • 6
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Chiu, Y-S.P., Chen, K-K., Cheng, F-T. and Wu, M-F. (2010), 'Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown', Computers and Mathematics with Applications, Vol. 59, No. 2, pp.919-932.
    • (2010) Computers and Mathematics with Applications , vol.59 , Issue.2 , pp. 919-932
    • Chiu, Y.-S.P.1    Chen, K.-K.2    Cheng, F.-T.3    Wu, M.-F.4
  • 7
    • 0037375114 scopus 로고    scopus 로고
    • An optimal production run time with imperfect production processes and allowable shortages
    • Chung, K.J. and Hou, K.L. (2003) 'An optimal production run time with imperfect production processes and allowable shortages', Computers & Operations Research, Vol. 30, No. 4, pp.483-490.
    • (2003) Computers & Operations Research , vol.30 , Issue.4 , pp. 483-490
    • Chung, K.J.1    Hou, K.L.2
  • 9
    • 0031104096 scopus 로고    scopus 로고
    • The effect of minimal repairs on economic lot-sizing
    • Dagpunar, J.S. (1997) 'The effect of minimal repairs on economic lot-sizing', Microelectronics Reliability, Vol. 37, No. 3, pp.417-419.
    • (1997) Microelectronics Reliability , vol.37 , Issue.3 , pp. 417-419
    • Dagpunar, J.S.1
  • 10
    • 33846902774 scopus 로고    scopus 로고
    • Effect of inspection errors and preventive maintenance on a two stage production inventory system
    • Darvish, M.A. and Ben-Daya, M. (2007) 'Effect of inspection errors and preventive maintenance on a two stage production inventory system', International Journal of Production Economics, Vol. 107, No. 1, pp.301-313.
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 301-313
    • Darvish, M.A.1    Ben-Daya, M.2
  • 11
    • 0038201780 scopus 로고    scopus 로고
    • A replenishment policy for deteriorating items with linear trend demand and shortages when payment periods are offered
    • Dye, C.Y. and Chang, H.J. (2003) 'A replenishment policy for deteriorating items with linear trend demand and shortages when payment periods are offered', International Journal of Information and Management Sciences, Vol., 14, No. 2, pp.31-45.
    • (2003) International Journal of Information and Management Sciences , vol.14 , Issue.2 , pp. 31-45
    • Dye, C.Y.1    Chang, H.J.2
  • 12
    • 84861323354 scopus 로고    scopus 로고
    • An eoq model for a deteriorating item with time-varying demand and time-dependent partial backlogging
    • Ghosh, S.K., Khanra, S. and Chaudhuri, K.S. (2011) 'An EOQ model for a deteriorating item with time-varying demand and time-dependent partial backlogging', International Journal of Mathematics in Operational Research, Vol. 3, No. 3, pp.264-279.
    • (2011) International Journal of Mathematics in Operational Research , vol.3 , Issue.3 , pp. 264-279
    • Ghosh, S.K.1    Khanra, S.2    Chaudhuri, K.S.3
  • 13
    • 77951207406 scopus 로고    scopus 로고
    • An adaptive neuro-fuzzy inference system modeling for material removal rate in stationary ultrasonic drilling of sillimanite ceramic
    • Gill, S.S. and Singh, J. (2010) 'An adaptive neuro-fuzzy inference system modeling for material removal rate in stationary ultrasonic drilling of sillimanite ceramic', Expert Systems with Applications, Vol. 37, No. 8, pp.5590-5598.
    • (2010) Expert Systems with Applications , vol.37 , Issue.8 , pp. 5590-5598
    • Gill, S.S.1    Singh, J.2
  • 14
    • 11844277565 scopus 로고    scopus 로고
    • Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle
    • Giri, B.C. and Yun, W. Y. (2005) 'Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle', International Journal of Production Economics, Vol. 95, No. 2, pp.229-243.
    • (2005) International Journal of Production Economics , vol.95 , Issue.2 , pp. 229-243
    • Giri, B.C.1    Yun, W.Y.2
  • 15
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenvelt, H., Pintelon, L. and Seidmann, A. (1992a) 'Production batching with machine breakdowns and safety stocks', Operations Research, Vol. 40, No. 5, pp.959-971.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 959-971
    • Groenvelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 16
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenvelt, H., Pintelon, L. and Seidmann, A. (1992b) 'Production lot sizing with machine breakdowns', Management Science, Vol. 38, No. 1, pp.104-123.
    • (1992) Management Science , vol.38 , Issue.1 , pp. 104-123
    • Groenvelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 17
    • 84944674116 scopus 로고    scopus 로고
    • A production inventory model for deteriorating items with alternating replenishment rates and backlogging of demand
    • Gupta, P.N. and Arora, N. (2010) 'A production inventory model for deteriorating items with alternating replenishment rates and backlogging of demand', Journal of Indian Society of Statistics and Operations Research, Vol. 31, Nos. 1-4, pp.27-42.
    • (2010) Journal of Indian Society of Statistics and Operations Research , vol.31 , Issue.1-4 , pp. 27-42
    • Gupta, P.N.1    Arora, N.2
  • 18
    • 84944680818 scopus 로고    scopus 로고
    • An EOQ model with power demand, weibull distribution deterioration and partial backlogging
    • Gupta, P.N. and Arora, N. (2011) 'An EOQ model with power demand, Weibull distribution deterioration and partial backlogging', Journal of Indian Academy of Mathematics, Vol. 33, No. 1, pp.175-183.
    • (2011) Journal of Indian Academy of Mathematics , vol.33 , Issue.1 , pp. 175-183
    • Gupta, P.N.1    Arora, N.2
  • 21
  • 22
    • 0029273384 scopus 로고
    • Neuro fuzzy modeling and control
    • Jang, J.S.R. and Sun, C.T. (1995) 'Neuro fuzzy modeling and control', Proceedings of the IEEE, Vol. 83, No. 3, pp.378-406.
    • (1995) Proceedings of the IEEE , vol.83 , Issue.3 , pp. 378-406
    • Jang, J.S.R.1    Sun, C.T.2
  • 23
    • 85017440109 scopus 로고    scopus 로고
    • An inventory model for deteriorating items with time dependent demand and time varying holding cost under partial backlogging
    • Mishra, V.K., Singh, L.S. and Kumar, R. (2013) 'An inventory model for deteriorating items with time dependent demand and time varying holding cost under partial backlogging', Journal of Industrial Engineering International, Vol. 9, No. 4, pp.1-5.
    • (2013) Journal of Industrial Engineering International , vol.9 , Issue.4 , pp. 1-5
    • Mishra, V.K.1    Singh, L.S.2    Kumar, R.3
  • 24
    • 0033714668 scopus 로고    scopus 로고
    • Connection admission control of atm network using integrated mlp and fuzzy controllers
    • Nelson, O.L.N. and Tham, C.K. (2000) 'Connection admission control of ATM network using integrated MLP and fuzzy controllers', Computer Networks, Vol. 32, No. 1, pp.61-79.
    • (2000) Computer Networks , vol.32 , Issue.1 , pp. 61-79
    • Nelson, O.L.N.1    Tham, C.K.2
  • 25
    • 84866142977 scopus 로고    scopus 로고
    • Application of an adaptive neuro-fuzzy inference system to ground subsidence hazard mapping
    • Park, I., Choi, J., Lee, M.J. and Lee, S. (2012) 'Application of an adaptive neuro-fuzzy inference system to ground subsidence hazard mapping', Computers & Geosciences, Vol. 48, pp.228-238.
    • (2012) Computers & Geosciences , vol.48 , pp. 228-238
    • Park, I.1    Choi, J.2    Lee, M.J.3    Lee, S.4
  • 26
    • 78650294226 scopus 로고    scopus 로고
    • A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system
    • Rafiee, K., Rabbani, M., Rafiei, H. and Rahimi-Vahed, A. (2011) 'A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system' Applied Mathematical Modelling, Vol. 35, No. 4, pp.1810-1819.
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.4 , pp. 1810-1819
    • Rafiee, K.1    Rabbani, M.2    Rafiei, H.3    Rahimi-Vahed, A.4
  • 27
    • 77957809493 scopus 로고    scopus 로고
    • A volume flexible production-policy for randomly deteriorating item with trended demand and shortages
    • Roy, A., Kar, S. and Maiti, M. (2010) 'A volume flexible production-policy for randomly deteriorating item with trended demand and shortages', International Journal of Production Economics, Vol. 128, No. 1, pp.188-199.
    • (2010) International Journal of Production Economics , vol.128 , Issue.1 , pp. 188-199
    • Roy, A.1    Kar, S.2    Maiti, M.3
  • 28
    • 78650171747 scopus 로고    scopus 로고
    • Optimal reliability, production lot size and safety stock in an imperfect production system
    • Sarkar, B., Sana, S.S. and Chaudhuri, K. (2010), 'Optimal reliability, production lot size and safety stock in an imperfect production system', International Journal of Mathematics in Operational Research, Vol. 2, No. 4, pp.467-490.
    • (2010) International Journal of Mathematics in Operational Research , vol.2 , Issue.4 , pp. 467-490
    • Sarkar, B.1    Sana, S.S.2    Chaudhuri, K.3
  • 29
    • 84860478120 scopus 로고    scopus 로고
    • An optimal inventory replenishment policy for a deteriorating item with time-quadratic demand and time-dependent partial backlogging with shortages in all cycles
    • Sarkar, T., Ghosh, S.K. and Chaudhuri, K.S. (2012) 'An optimal inventory replenishment policy for a deteriorating item with time-quadratic demand and time-dependent partial backlogging with shortages in all cycles', Applied Mathematics and Computation, Vol. 218, No. 18, pp.9147-9155.
    • (2012) Applied Mathematics and Computation , vol.218 , Issue.18 , pp. 9147-9155
    • Sarkar, T.1    Ghosh, S.K.2    Chaudhuri, K.S.3
  • 30
    • 84901622800 scopus 로고    scopus 로고
    • An inventory model for deteriorating items with weibull deterioration with time dependent demand and shortages
    • Sharma, V. and Chaudhary, R.R. (2013) 'An inventory model for deteriorating items with Weibull deterioration with time dependent demand and shortages', Research Journal of Management Sciences, Vol. 2, No. 3, pp.28-30.
    • (2013) Research Journal of Management Sciences , vol.2 , Issue.3 , pp. 28-30
    • Sharma, V.1    Chaudhary, R.R.2
  • 31
    • 84896790054 scopus 로고    scopus 로고
    • A hybrid fuzzy time series and ANFIS approach to demand variability in supply chain networks
    • Tozan, H. and Vayvay, O. (2009) 'A hybrid fuzzy time series and ANFIS approach to demand variability in supply chain networks', Journal of Naval Science and Engineering, Vol. 5, No. 2, pp.20-34.
    • (2009) Journal of Naval Science and Engineering , vol.5 , Issue.2 , pp. 20-34
    • Tozan, H.1    Vayvay, O.2
  • 32
    • 2642586388 scopus 로고    scopus 로고
    • The impact of a free-repair warranty on EMQ model for imperfect production systems
    • Wang, C.H. (2004) 'The impact of a free-repair warranty on EMQ model for imperfect production systems', Computers & Operations Research, Vol. 31, No. 12, pp.2021-2035.
    • (2004) Computers & Operations Research , vol.31 , Issue.12 , pp. 2021-2035
    • Wang, C.H.1
  • 33
    • 84878563082 scopus 로고    scopus 로고
    • Off-line identification of nonlinear, dynamic systems using a neuro-fuzzy modelling technique
    • Zhou, Y. and Dexter, A. (2013) 'Off-line identification of nonlinear, dynamic systems using a neuro-fuzzy modelling technique', Fuzzy Sets and Systems, Vol. 225, pp.74-92.
    • (2013) Fuzzy Sets and Systems , vol.225 , pp. 74-92
    • Zhou, Y.1    Dexter, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.