메뉴 건너뛰기




Volumn 22, Issue 5, 2015, Pages 516-535

Cyber-physical systems integration of building information models and the physical construction

Author keywords

Buildings; Computer applications; Construction; Construction management; Design; Design and development

Indexed keywords

ARCHITECTURAL DESIGN; BUILDINGS; COMPUTER APPLICATIONS; CONSTRUCTION; CONSTRUCTION INDUSTRY; CYBER PHYSICAL SYSTEM; DESIGN; EMBEDDED SYSTEMS; INTEGRATION; PROJECT MANAGEMENT; SOFTWARE PROTOTYPING;

EID: 84942110767     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/ECAM-07-2014-0097     Document Type: Article
Times cited : (86)

References (32)
  • 1
    • 84900987079 scopus 로고    scopus 로고
    • Active monitoring and control of light fixtures during building construction and operation: Cyber-physical systems approach
    • (a)
    • Akanmu, A., Anumba, C. and Messner, J. (2013 a), " Active monitoring and control of light fixtures during building construction and operation: cyber-physical systems approach ", Journal of Architectural Engineering, Vol. 20 No. 2, pp. 16-24.
    • (2013) Journal of Architectural Engineering , vol.20 , Issue.2 , pp. 16-24
    • Akanmu, A.1    Anumba, C.2    Messner, J.3
  • 2
    • 84880055872 scopus 로고    scopus 로고
    • Scenarios for cyber-physical systems integration in construction
    • (b)
    • Akanmu, A., Anumba, C. and Messner, J. (2013 b), " Scenarios for cyber-physical systems integration in construction ", ITcon, Vol. 18 No. 12, pp. 240-260.
    • (2013) ITcon , vol.18 , Issue.12 , pp. 240-260
    • Akanmu, A.1    Anumba, C.2    Messner, J.3
  • 3
    • 42949097433 scopus 로고    scopus 로고
    • Editorial-sensors in construction and infrastructure management
    • Akinci, B. and Anumba, C. (2008), " Editorial-sensors in construction and infrastructure management ", ITcon, Vol. 13 No. 5, pp. 69-70.
    • (2008) ITcon , vol.13 , Issue.5 , pp. 69-70
    • Akinci, B.1    Anumba, C.2
  • 5
    • 29144449983 scopus 로고    scopus 로고
    • Intelligent wireless web services for construction - A review of the enabling technologies
    • Aziz, Z., Anumba, C., Ruikar, D., Carrillo, P. and Bouchlaghem, D. (2006), " Intelligent wireless web services for construction-a review of the enabling technologies ", Automation in Construction, Vol. 15 No. 2, pp. 113-123.
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 113-123
    • Aziz, Z.1    Anumba, C.2    Ruikar, D.3    Carrillo, P.4    Bouchlaghem, D.5
  • 7
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • Bosche, F. and Haas, C. (2008), " Automated retrieval of 3D CAD model objects in construction range images ", Automation in Construction, Vol. 17 No. 4, pp. 499-512.
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 499-512
    • Bosche, F.1    Haas, C.2
  • 8
    • 13244267250 scopus 로고    scopus 로고
    • Visualisation in architecture, engineering and construction (AEC)
    • Bouchlaghem, D., Shang, H., Whyte, J. and Ganah, A. (2005), " Visualisation in architecture, engineering and construction (AEC) ", Automation in Construction, Vol. 14 No. 3, pp. 287-295.
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 287-295
    • Bouchlaghem, D.1    Shang, H.2    Whyte, J.3    Ganah, A.4
  • 9
    • 80052143994 scopus 로고    scopus 로고
    • A framework for using mobile computing for information management on construction sites
    • Chen, Y. and Kamara, J.M. (2011), " A framework for using mobile computing for information management on construction sites ", Automation in Construction, Vol. 20 No. 7, pp. 776-788.
    • (2011) Automation in Construction , vol.20 , Issue.7 , pp. 776-788
    • Chen, Y.1    Kamara, J.M.2
  • 10
    • 84878579790 scopus 로고    scopus 로고
    • Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
    • Cheng, T. and Teizer, J. (2013), " Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications ", Automation in Construction, Vol. 34, pp. 3-15.
    • (2013) Automation in Construction , vol.34 , pp. 3-15
    • Cheng, T.1    Teizer, J.2
  • 11
    • 39349114541 scopus 로고    scopus 로고
    • RFID+4D CAD for progress management of structural steel works in high-rise buildings
    • Chin, S., Yoon, S., Choi, C. and Cho, C. (2008), " RFID+4D CAD for progress management of structural steel works in high-rise buildings ", Journal of Computing in Civil Engineering, Vol. 22 No. 2, pp. 74-89.
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.1    Yoon, S.2    Choi, C.3    Cho, C.4
  • 12
    • 84860292786 scopus 로고    scopus 로고
    • Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components
    • Demiralp, G., Guven, G. and Ergen, E. (2012), " Analyzing the benefits of RFID technology for cost sharing in construction supply chains: a case study on prefabricated precast components ", Automation in Construction, Vol. 24, pp. 120-129.
    • (2012) Automation in Construction , vol.24 , pp. 120-129
    • Demiralp, G.1    Guven, G.2    Ergen, E.3
  • 13
    • 79960638196 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • El-Omari, S. and Moselhi, O. (2011), " Integrating automated data acquisition technologies for progress reporting of construction projects ", Automation in Construction, Vol. 20 No. 6, pp. 699-705.
    • (2011) Automation in Construction , vol.20 , Issue.6 , pp. 699-705
    • El-Omari, S.1    Moselhi, O.2
  • 14
    • 70350154917 scopus 로고    scopus 로고
    • D4AR - A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication
    • Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2009), " D4AR-a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication ", Journal of Information Technology in Construction, Vol. 14 No. 13, pp. 129-153.
    • (2009) Journal of Information Technology in Construction , vol.14 , Issue.13 , pp. 129-153
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 15
    • 84855950194 scopus 로고    scopus 로고
    • Integrated sequential as-built and as-planned representation with D 4 AR tools in support of decision-making tasks in the AEC/FM industry
    • Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2011), " Integrated sequential as-built and as-planned representation with D 4 AR tools in support of decision-making tasks in the AEC/FM industry ", Journal of Construction Engineering and Management, Vol. 137 No. 12, pp. 1099-1116.
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.12 , pp. 1099-1116
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 16
    • 70350139502 scopus 로고    scopus 로고
    • Lifecycle management of facilities components using radio frequency identification and building information model
    • Hammad, A. (2009), " Lifecycle management of facilities components using radio frequency identification and building information model ", Journal of Information Technology in Construction, Vol. 14 No. 18, pp. 238-262.
    • (2009) Journal of Information Technology in Construction , vol.14 , Issue.18 , pp. 238-262
    • Hammad, A.1
  • 17
    • 62649130779 scopus 로고    scopus 로고
    • Integration of radio-frequency identification and 4D CAD in construction management
    • Hu, W. (2008), " Integration of radio-frequency identification and 4D CAD in construction management ", Tsinghua Science & Technology, Vol. 13 No. 1, pp. 151-157.
    • (2008) Tsinghua Science & Technology , vol.13 , Issue.1 , pp. 151-157
    • Hu, W.1
  • 19
    • 80053148143 scopus 로고    scopus 로고
    • The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement
    • June 19-22, Miami, FL
    • Kim, C., Son, H. and Kim, C. (2011), " The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement ", Proc. of the 2011 ASCE International Workshop on Computing in Civil Engineering, June 19-22, Miami, FL.
    • (2011) Proc. of the 2011 ASCE International Workshoon Computing in Civil Engineering
    • Kim, C.1    Son, H.2    Kim, C.3
  • 20
    • 84986132061 scopus 로고    scopus 로고
    • A systematic procedure for developing the 3D model to evaluate the construction project progress
    • Memon, Z.A., Majid, M.Z.A. and Mustaffar, M. (2007), " A systematic procedure for developing the 3D model to evaluate the construction project progress ", Construction Innovation: Information, Process, Management, Vol. 7 No. 2, pp. 187-199.
    • (2007) Construction Innovation: Information, Process, Management , vol.7 , Issue.2 , pp. 187-199
    • Memon, Z.A.1    Majid, M.Z.A.2    Mustaffar, M.3
  • 21
    • 62649154821 scopus 로고    scopus 로고
    • Potentials for radio frequency identification in AEC/FM
    • Menzel, K., Cong, Z. and Allan, L. (2008), " Potentials for radio frequency identification in AEC/FM ", Tsinghua Science & Technology, Vol. 13 No. S1, pp. 329-335.
    • (2008) Tsinghua Science & Technology , vol.13 , Issue.S1 , pp. 329-335
    • Menzel, K.1    Cong, Z.2    Allan, L.3
  • 22
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in automated project performance control (APPC)
    • Navon, R. and Sacks, R. (2007), " Assessing research issues in automated project performance control (APPC) ", Automation in Construction, Vol. 16 No. 4, pp. 474-484.
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 23
    • 77949485153 scopus 로고    scopus 로고
    • The use of a virtual building design and construction model for developing an effective project concept in 5D environment
    • Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L. and Mikalauskas, S. (2010), " The use of a virtual building design and construction model for developing an effective project concept in 5D environment ", Automation in Construction, Vol. 19 No. 3, pp. 357-367.
    • (2010) Automation in Construction , vol.19 , Issue.3 , pp. 357-367
    • Popov, V.1    Juocevicius, V.2    Migilinskas, D.3    Ustinovichius, L.4    Mikalauskas, S.5
  • 26
    • 62649161119 scopus 로고    scopus 로고
    • Wireless sensor networks for resources tracking at building construction sites
    • Shen, X., Chen, W. and Lu, M. (2008), " Wireless sensor networks for resources tracking at building construction sites ", Tsinghua Science & Technology, Vol. 13 No. S1, pp. 78-83.
    • (2008) Tsinghua Science & Technology , vol.13 , Issue.S1 , pp. 78-83
    • Shen, X.1    Chen, W.2    Lu, M.3
  • 27
    • 77952601972 scopus 로고    scopus 로고
    • Ontologies to support RFID-based link between virtual models and construction components
    • Sørensen, K.B., Christiansson, P. and Svidt, K. (2010), " Ontologies to support RFID-based link between virtual models and construction components ", Computer-aided Civil and Infrastructure Engineering, Vol. 25 No. 4, pp. 285-302.
    • (2010) Computer-aided Civil and Infrastructure Engineering , vol.25 , Issue.4 , pp. 285-302
    • Sørensen, K.B.1    Christiansson, P.2    Svidt, K.3
  • 30
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • Turkan, Y., Bosche, F., Haas, C.T. and Haas, R. (2012), " Automated progress tracking using 4D schedule and 3D sensing technologies ", Automation in Construction, Vol. 22 No. 43, pp. 414-421.
    • (2012) Automation in Construction , vol.22 , Issue.43 , pp. 414-421
    • Turkan, Y.1    Bosche, F.2    Haas, C.T.3    Haas, R.4
  • 31
    • 38649110133 scopus 로고    scopus 로고
    • Enhancing construction quality inspection and management using RFID technology
    • Wang, L.-C. (2008), " Enhancing construction quality inspection and management using RFID technology ", Automation in Construction, Vol. 17 No. 4, pp. 467-479.
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 467-479
    • Wang, L.-C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.