-
1
-
-
84900987079
-
Active monitoring and control of light fixtures during building construction and operation: Cyber-physical systems approach
-
(a)
-
Akanmu, A., Anumba, C. and Messner, J. (2013 a), " Active monitoring and control of light fixtures during building construction and operation: cyber-physical systems approach ", Journal of Architectural Engineering, Vol. 20 No. 2, pp. 16-24.
-
(2013)
Journal of Architectural Engineering
, vol.20
, Issue.2
, pp. 16-24
-
-
Akanmu, A.1
Anumba, C.2
Messner, J.3
-
2
-
-
84880055872
-
Scenarios for cyber-physical systems integration in construction
-
(b)
-
Akanmu, A., Anumba, C. and Messner, J. (2013 b), " Scenarios for cyber-physical systems integration in construction ", ITcon, Vol. 18 No. 12, pp. 240-260.
-
(2013)
ITcon
, vol.18
, Issue.12
, pp. 240-260
-
-
Akanmu, A.1
Anumba, C.2
Messner, J.3
-
3
-
-
42949097433
-
Editorial-sensors in construction and infrastructure management
-
Akinci, B. and Anumba, C. (2008), " Editorial-sensors in construction and infrastructure management ", ITcon, Vol. 13 No. 5, pp. 69-70.
-
(2008)
ITcon
, vol.13
, Issue.5
, pp. 69-70
-
-
Akinci, B.1
Anumba, C.2
-
4
-
-
77956305933
-
Towards a cyber-physical systems approach to construction
-
Banff, May 8-10
-
Anumba, C., Akanmu, A. and Messner, J. (2010), " Towards a cyber-physical systems approach to construction ", Proceedings of the 2010 Construction Research Congress, Banff, May 8-10, pp. 528-538.
-
(2010)
Proceedings of the 2010 Construction Research Congress
, pp. 528-538
-
-
Anumba, C.1
Akanmu, A.2
Messner, J.3
-
5
-
-
29144449983
-
Intelligent wireless web services for construction - A review of the enabling technologies
-
Aziz, Z., Anumba, C., Ruikar, D., Carrillo, P. and Bouchlaghem, D. (2006), " Intelligent wireless web services for construction-a review of the enabling technologies ", Automation in Construction, Vol. 15 No. 2, pp. 113-123.
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 113-123
-
-
Aziz, Z.1
Anumba, C.2
Ruikar, D.3
Carrillo, P.4
Bouchlaghem, D.5
-
6
-
-
84896985768
-
Augmenting software architectures with physical components
-
Bhave, A., Garlan, D., Krogh, B., Rajhans, A. and Schmerl, B. (2010), " Augmenting software architectures with physical components ", Proceedings of the Embedded Real Time Software and Systems Conf. (ERTS2 2010), pp. 19-21.
-
(2010)
Proceedings of the Embedded Real Time Software and Systems Conf. (ERTS2 2010)
, pp. 19-21
-
-
Bhave, A.1
Garlan, D.2
Krogh, B.3
Rajhans, A.4
Schmerl, B.5
-
7
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
Bosche, F. and Haas, C. (2008), " Automated retrieval of 3D CAD model objects in construction range images ", Automation in Construction, Vol. 17 No. 4, pp. 499-512.
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosche, F.1
Haas, C.2
-
8
-
-
13244267250
-
Visualisation in architecture, engineering and construction (AEC)
-
Bouchlaghem, D., Shang, H., Whyte, J. and Ganah, A. (2005), " Visualisation in architecture, engineering and construction (AEC) ", Automation in Construction, Vol. 14 No. 3, pp. 287-295.
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 287-295
-
-
Bouchlaghem, D.1
Shang, H.2
Whyte, J.3
Ganah, A.4
-
9
-
-
80052143994
-
A framework for using mobile computing for information management on construction sites
-
Chen, Y. and Kamara, J.M. (2011), " A framework for using mobile computing for information management on construction sites ", Automation in Construction, Vol. 20 No. 7, pp. 776-788.
-
(2011)
Automation in Construction
, vol.20
, Issue.7
, pp. 776-788
-
-
Chen, Y.1
Kamara, J.M.2
-
10
-
-
84878579790
-
Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
-
Cheng, T. and Teizer, J. (2013), " Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications ", Automation in Construction, Vol. 34, pp. 3-15.
-
(2013)
Automation in Construction
, vol.34
, pp. 3-15
-
-
Cheng, T.1
Teizer, J.2
-
11
-
-
39349114541
-
RFID+4D CAD for progress management of structural steel works in high-rise buildings
-
Chin, S., Yoon, S., Choi, C. and Cho, C. (2008), " RFID+4D CAD for progress management of structural steel works in high-rise buildings ", Journal of Computing in Civil Engineering, Vol. 22 No. 2, pp. 74-89.
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.2
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
12
-
-
84860292786
-
Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components
-
Demiralp, G., Guven, G. and Ergen, E. (2012), " Analyzing the benefits of RFID technology for cost sharing in construction supply chains: a case study on prefabricated precast components ", Automation in Construction, Vol. 24, pp. 120-129.
-
(2012)
Automation in Construction
, vol.24
, pp. 120-129
-
-
Demiralp, G.1
Guven, G.2
Ergen, E.3
-
13
-
-
79960638196
-
Integrating automated data acquisition technologies for progress reporting of construction projects
-
El-Omari, S. and Moselhi, O. (2011), " Integrating automated data acquisition technologies for progress reporting of construction projects ", Automation in Construction, Vol. 20 No. 6, pp. 699-705.
-
(2011)
Automation in Construction
, vol.20
, Issue.6
, pp. 699-705
-
-
El-Omari, S.1
Moselhi, O.2
-
14
-
-
70350154917
-
D4AR - A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication
-
Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2009), " D4AR-a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication ", Journal of Information Technology in Construction, Vol. 14 No. 13, pp. 129-153.
-
(2009)
Journal of Information Technology in Construction
, vol.14
, Issue.13
, pp. 129-153
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Savarese, S.3
-
15
-
-
84855950194
-
Integrated sequential as-built and as-planned representation with D 4 AR tools in support of decision-making tasks in the AEC/FM industry
-
Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2011), " Integrated sequential as-built and as-planned representation with D 4 AR tools in support of decision-making tasks in the AEC/FM industry ", Journal of Construction Engineering and Management, Vol. 137 No. 12, pp. 1099-1116.
-
(2011)
Journal of Construction Engineering and Management
, vol.137
, Issue.12
, pp. 1099-1116
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Savarese, S.3
-
16
-
-
70350139502
-
Lifecycle management of facilities components using radio frequency identification and building information model
-
Hammad, A. (2009), " Lifecycle management of facilities components using radio frequency identification and building information model ", Journal of Information Technology in Construction, Vol. 14 No. 18, pp. 238-262.
-
(2009)
Journal of Information Technology in Construction
, vol.14
, Issue.18
, pp. 238-262
-
-
Hammad, A.1
-
17
-
-
62649130779
-
Integration of radio-frequency identification and 4D CAD in construction management
-
Hu, W. (2008), " Integration of radio-frequency identification and 4D CAD in construction management ", Tsinghua Science & Technology, Vol. 13 No. 1, pp. 151-157.
-
(2008)
Tsinghua Science & Technology
, vol.13
, Issue.1
, pp. 151-157
-
-
Hu, W.1
-
18
-
-
79956196330
-
Bridge construction progress monitoring using image analysis
-
Kim, C., Kim, H. and Ju, Y. (2009), " Bridge construction progress monitoring using image analysis ", Proceedings of the 26th International Symposium on Automation and Robotics in Construction (ISARC 2009), pp. 101-104.
-
(2009)
Proceedings of the 26th International Symposium on Automation and Robotics in Construction (ISARC 2009)
, pp. 101-104
-
-
Kim, C.1
Kim, H.2
Ju, Y.3
-
19
-
-
80053148143
-
The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement
-
June 19-22, Miami, FL
-
Kim, C., Son, H. and Kim, C. (2011), " The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement ", Proc. of the 2011 ASCE International Workshop on Computing in Civil Engineering, June 19-22, Miami, FL.
-
(2011)
Proc. of the 2011 ASCE International Workshoon Computing in Civil Engineering
-
-
Kim, C.1
Son, H.2
Kim, C.3
-
20
-
-
84986132061
-
A systematic procedure for developing the 3D model to evaluate the construction project progress
-
Memon, Z.A., Majid, M.Z.A. and Mustaffar, M. (2007), " A systematic procedure for developing the 3D model to evaluate the construction project progress ", Construction Innovation: Information, Process, Management, Vol. 7 No. 2, pp. 187-199.
-
(2007)
Construction Innovation: Information, Process, Management
, vol.7
, Issue.2
, pp. 187-199
-
-
Memon, Z.A.1
Majid, M.Z.A.2
Mustaffar, M.3
-
21
-
-
62649154821
-
Potentials for radio frequency identification in AEC/FM
-
Menzel, K., Cong, Z. and Allan, L. (2008), " Potentials for radio frequency identification in AEC/FM ", Tsinghua Science & Technology, Vol. 13 No. S1, pp. 329-335.
-
(2008)
Tsinghua Science & Technology
, vol.13
, Issue.S1
, pp. 329-335
-
-
Menzel, K.1
Cong, Z.2
Allan, L.3
-
22
-
-
33847222202
-
Assessing research issues in automated project performance control (APPC)
-
Navon, R. and Sacks, R. (2007), " Assessing research issues in automated project performance control (APPC) ", Automation in Construction, Vol. 16 No. 4, pp. 474-484.
-
(2007)
Automation in Construction
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
23
-
-
77949485153
-
The use of a virtual building design and construction model for developing an effective project concept in 5D environment
-
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L. and Mikalauskas, S. (2010), " The use of a virtual building design and construction model for developing an effective project concept in 5D environment ", Automation in Construction, Vol. 19 No. 3, pp. 357-367.
-
(2010)
Automation in Construction
, vol.19
, Issue.3
, pp. 357-367
-
-
Popov, V.1
Juocevicius, V.2
Migilinskas, D.3
Ustinovichius, L.4
Mikalauskas, S.5
-
24
-
-
77956217277
-
Cyber-physical systems: The next computing revolution
-
Rajkumar, R.R., Lee, I., Sha, L. and Stankovic, J. (2010), " Cyber-physical systems: the next computing revolution ", Proceedings of the 47th Design Automation Conference, ACM, pp. 731-736.
-
(2010)
Proceedings of the 47th Design Automation Conference, ACM
, pp. 731-736
-
-
Rajkumar, R.R.1
Lee, I.2
Sha, L.3
Stankovic, J.4
-
25
-
-
33645088959
-
Towards virtual prototyping in the construction industry: The case study of the DIVERCITY project
-
Sarshar, M., Christiansson, P. and Winter, J. (2004), " Towards virtual prototyping in the construction industry: the case study of the DIVERCITY project ", Proceedings of the World IT Conference for Design and Construction, pp. 18-24.
-
(2004)
Proceedings of the World IT Conference for Design and Construction
, pp. 18-24
-
-
Sarshar, M.1
Christiansson, P.2
Winter, J.3
-
26
-
-
62649161119
-
Wireless sensor networks for resources tracking at building construction sites
-
Shen, X., Chen, W. and Lu, M. (2008), " Wireless sensor networks for resources tracking at building construction sites ", Tsinghua Science & Technology, Vol. 13 No. S1, pp. 78-83.
-
(2008)
Tsinghua Science & Technology
, vol.13
, Issue.S1
, pp. 78-83
-
-
Shen, X.1
Chen, W.2
Lu, M.3
-
27
-
-
77952601972
-
Ontologies to support RFID-based link between virtual models and construction components
-
Sørensen, K.B., Christiansson, P. and Svidt, K. (2010), " Ontologies to support RFID-based link between virtual models and construction components ", Computer-aided Civil and Infrastructure Engineering, Vol. 25 No. 4, pp. 285-302.
-
(2010)
Computer-aided Civil and Infrastructure Engineering
, vol.25
, Issue.4
, pp. 285-302
-
-
Sørensen, K.B.1
Christiansson, P.2
Svidt, K.3
-
28
-
-
79951761309
-
Tru-alarm: Trustworthiness analysis of sensor networks in cyber-physical systems
-
Tang, L.-A., Yu, X., Kim, S., Han, J., Hung, C.C. and Peng, W.-C. (2010), " Tru-alarm: trustworthiness analysis of sensor networks in cyber-physical systems ", 2010 IEEE 10th International Conference on Data Mining (ICDM), pp. 1079-1084.
-
(2010)
2010 IEEE 10th International Conference on Data Mining (ICDM)
, pp. 1079-1084
-
-
Tang, L.-A.1
Yu, X.2
Kim, S.3
Han, J.4
Hung, C.C.5
Peng, W.-C.6
-
29
-
-
83655204942
-
Towards automated progress tracking of erection of concrete structures
-
State College, Pennsylvania, June 9-11
-
Turkan, Y., Bosche, F., Haas, C.T. and Haas, R. (2010), " Towards automated progress tracking of erection of concrete structures ", Proceedings of 6th International Conference on Innovation Architecture, Engineering and Construction, AEC, State College, Pennsylvania, June 9-11.
-
(2010)
Proceedings of 6th International Conference on Innovation Architecture, Engineering and Construction, AEC
-
-
Turkan, Y.1
Bosche, F.2
Haas, C.T.3
Haas, R.4
-
30
-
-
84857370632
-
Automated progress tracking using 4D schedule and 3D sensing technologies
-
Turkan, Y., Bosche, F., Haas, C.T. and Haas, R. (2012), " Automated progress tracking using 4D schedule and 3D sensing technologies ", Automation in Construction, Vol. 22 No. 43, pp. 414-421.
-
(2012)
Automation in Construction
, vol.22
, Issue.43
, pp. 414-421
-
-
Turkan, Y.1
Bosche, F.2
Haas, C.T.3
Haas, R.4
-
31
-
-
38649110133
-
Enhancing construction quality inspection and management using RFID technology
-
Wang, L.-C. (2008), " Enhancing construction quality inspection and management using RFID technology ", Automation in Construction, Vol. 17 No. 4, pp. 467-479.
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 467-479
-
-
Wang, L.-C.1
-
32
-
-
84921283523
-
Evaluating IEEE 802.15. 4 for cyber-physical systems
-
Xia, F., Vinel, A., Gao, R., Wang, L. and Qiu, T. (2013), " Evaluating IEEE 802.15. 4 for cyber-physical systems ", Eurasip Journal on Wireless Communications and Networking, Vol. 1 No. 3, pp. 25-37.
-
(2013)
Eurasip Journal on Wireless Communications and Networking
, vol.1
, Issue.3
, pp. 25-37
-
-
Xia, F.1
Vinel, A.2
Gao, R.3
Wang, L.4
Qiu, T.5
|