메뉴 건너뛰기




Volumn 33, Issue 7, 2015, Pages 1597-1609

Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques

Author keywords

Anomaly Detection; Earned Value Management; Monte Carlo simulation; Project control; Project Management; Project risk management; Statistical learning

Indexed keywords

BUDGET CONTROL; INTELLIGENT SYSTEMS; PROJECT MANAGEMENT; RISK ANALYSIS; RISK ASSESSMENT; RISK MANAGEMENT; STOCHASTIC SYSTEMS; VALUE ENGINEERING;

EID: 84940439561     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2015.06.012     Document Type: Article
Times cited : (78)

References (50)
  • 1
    • 84874317258 scopus 로고    scopus 로고
    • Integrating technical performance measurement with earned value management
    • Abba, W., and F.A. Niel, 2010. Integrating technical performance measurement with earned value management. The Measurable News, 4 6-8.
    • (2010) The Measurable News , vol.4 , pp. 6-8
    • Abba, W.1    Niel, F.A.2
  • 2
    • 84894229281 scopus 로고    scopus 로고
    • A new approach for project control under uncertainty. Going back to the basics
    • Acebes F., Pajares J., Galán J.M., López-Paredes A. A new approach for project control under uncertainty. Going back to the basics. Int. J. Proj. Manag. 2014, 32(3):423-434. 10.1016/j.ijproman.2013.08.003.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.3 , pp. 423-434
    • Acebes, F.1    Pajares, J.2    Galán, J.M.3    López-Paredes, A.4
  • 3
    • 33645957411 scopus 로고    scopus 로고
    • Earned value project management method and extensions
    • Anbari F.T. Earned value project management method and extensions. Proj. Manag. J. 2003, 34(4):12-23.
    • (2003) Proj. Manag. J. , vol.34 , Issue.4 , pp. 12-23
    • Anbari, F.T.1
  • 4
    • 33750724182 scopus 로고    scopus 로고
    • Reducing over-optimism in variable selection by cross-model validation
    • Anderssen E., Dyrstad K., Westad F., Martens H. Reducing over-optimism in variable selection by cross-model validation. Chemom. Intell. Lab. Syst. 2006, 84(1-2):69-74. 10.1016/j.chemolab.2006.04.021.
    • (2006) Chemom. Intell. Lab. Syst. , vol.84 , Issue.1-2 , pp. 69-74
    • Anderssen, E.1    Dyrstad, K.2    Westad, F.3    Martens, H.4
  • 5
    • 84874339300 scopus 로고    scopus 로고
    • Earned value management: a predictive analysis tool
    • Blanco V.D. Earned value management: a predictive analysis tool. Navy Supply Corps Newsl. 2013, 66(2):24-27.
    • (2013) Navy Supply Corps Newsl. , vol.66 , Issue.2 , pp. 24-27
    • Blanco, V.D.1
  • 6
    • 0031191630 scopus 로고    scopus 로고
    • The use of the area under the ROC curve in the evaluation of machine learning algorithms
    • Bradley A.P. The use of the area under the ROC curve in the evaluation of machine learning algorithms. Pattern Recogn. 1997, 30(7):1145-1159. 10.1016/S0031-3203(96)00142-2.
    • (1997) Pattern Recogn. , vol.30 , Issue.7 , pp. 1145-1159
    • Bradley, A.P.1
  • 7
    • 0030211964 scopus 로고    scopus 로고
    • Bagging predictors
    • Breiman L. Bagging predictors. Mach. Learn. 1996, 24(2):123-140. 10.1007/BF00058655.
    • (1996) Mach. Learn. , vol.24 , Issue.2 , pp. 123-140
    • Breiman, L.1
  • 8
    • 0035478854 scopus 로고    scopus 로고
    • Random Forests
    • Breiman L. Random Forests. Mach. Learn. 2001, 45(1):5-32. 10.1023/A:1010933404324.
    • (2001) Mach. Learn. , vol.45 , Issue.1 , pp. 5-32
    • Breiman, L.1
  • 10
    • 32644472456 scopus 로고    scopus 로고
    • Designing project management: a scientific notation and an improved formalism for earned value calculations
    • Cioffi D.F. Designing project management: a scientific notation and an improved formalism for earned value calculations. Int. J. Proj. Manag. 2006, 24(2):136-144. 10.1016/j.ijproman.2005.07.003.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.2 , pp. 136-144
    • Cioffi, D.F.1
  • 11
    • 0002552781 scopus 로고
    • Local regression models
    • Wadsworth & Brooks/Cole, J.M. Chambers, T.J. Hastie (Eds.)
    • Cleveland W.S., Grosse E., Shyu W.M. Local regression models. Statistical Models 1992, Wadsworth & Brooks/Cole. J.M. Chambers, T.J. Hastie (Eds.).
    • (1992) Statistical Models
    • Cleveland, W.S.1    Grosse, E.2    Shyu, W.M.3
  • 12
    • 84903828667 scopus 로고    scopus 로고
    • Setting tolerance limits for statistical project control using earned value management
    • Colin J., Vanhoucke M. Setting tolerance limits for statistical project control using earned value management. Omega 2014, 49(0):107-122. 10.1016/j.omega.2014.06.001.
    • (2014) Omega , vol.49 , pp. 107-122
    • Colin, J.1    Vanhoucke, M.2
  • 13
    • 84859414659 scopus 로고    scopus 로고
    • Decision Forests: a unified framework for classification, regression, density estimation, manifold learning and semi-supervised learning
    • Criminisi A., Shotton J., Konukoglu E. Decision Forests: a unified framework for classification, regression, density estimation, manifold learning and semi-supervised learning. Found. Trends Comput. Graph. Comput. Vis. 2011, 7(2-3):81-227. 10.1561/0600000035.
    • (2011) Found. Trends Comput. Graph. Comput. Vis. , vol.7 , Issue.2-3 , pp. 81-227
    • Criminisi, A.1    Shotton, J.2    Konukoglu, E.3
  • 15
    • 84897912404 scopus 로고    scopus 로고
    • An experimental evaluation of novelty detection methods
    • Ding X., Li Y., Belatreche A., Maguire L.P. An experimental evaluation of novelty detection methods. Neurocomputing 2014, 135:313-327. 10.1016/j.neucom.2013.12.002.
    • (2014) Neurocomputing , vol.135 , pp. 313-327
    • Ding, X.1    Li, Y.2    Belatreche, A.3    Maguire, L.P.4
  • 16
    • 36049047973 scopus 로고    scopus 로고
    • Ks: kernel density estimation and kernel discriminant analysis for multivariate data in R
    • Duong T. ks: kernel density estimation and kernel discriminant analysis for multivariate data in R. J. Stat. Softw. 2007, 21(7):1-16.
    • (2007) J. Stat. Softw. , vol.21 , Issue.7 , pp. 1-16
    • Duong, T.1
  • 17
    • 24344494438 scopus 로고    scopus 로고
    • Cross-validation bandwidth matrices for multivariate kernel density estimation
    • Duong T., Hazelton M.L. Cross-validation bandwidth matrices for multivariate kernel density estimation. Scand. J. Stat. 2005, 32(3):485-506. 10.1111/j.1467-9469.2005.00445.x.
    • (2005) Scand. J. Stat. , vol.32 , Issue.3 , pp. 485-506
    • Duong, T.1    Hazelton, M.L.2
  • 21
    • 84925068114 scopus 로고    scopus 로고
    • A review of analytical models, approaches and decision support tools in project monitoring and control
    • Hazir Ö. A review of analytical models, approaches and decision support tools in project monitoring and control. Int. J. Proj. Manag. 2015, 33(4):808-815.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.4 , pp. 808-815
    • Hazir, Ö.1
  • 22
    • 33646010711 scopus 로고    scopus 로고
    • Earned schedule: a breakthrough extension to earned value theory?
    • Henderson, K., 2003. Earned schedule: a breakthrough extension to earned value theory? The Measurable News, 1-16.
    • (2003) The Measurable News , pp. 1-16
    • Henderson, K.1
  • 23
    • 22744440305 scopus 로고    scopus 로고
    • Further developments in earned schedule
    • Henderson, K., 2004. Further developments in earned schedule. The Measurable News, 15-22.
    • (2004) The Measurable News , pp. 15-22
    • Henderson, K.1
  • 24
    • 7544223741 scopus 로고    scopus 로고
    • A survey of outlier detection methodologies
    • Hodge V.J., Austin J. A survey of outlier detection methodologies. Artif. Intell. Rev. 2004, 22(2):85-126. 10.1007/s10462-004-4304-y.
    • (2004) Artif. Intell. Rev. , vol.22 , Issue.2 , pp. 85-126
    • Hodge, V.J.1    Austin, J.2
  • 25
    • 65249138825 scopus 로고    scopus 로고
    • Forecasting project schedule completion with earned value metrics
    • Jacob, D.S., 2003. Forecasting project schedule completion with earned value metrics. The Measurable News, 7-9.
    • (2003) The Measurable News , pp. 7-9
    • Jacob, D.S.1
  • 26
    • 35448950734 scopus 로고    scopus 로고
    • Forecasting schedule completion using earned value metrics revisited
    • Jacob, D.S., and M. Kane, 2004. Forecasting schedule completion using earned value metrics revisited. The Measurable News, 11-17.
    • (2004) The Measurable News , pp. 11-17
    • Jacob, D.S.1    Kane, M.2
  • 28
    • 0038721043 scopus 로고    scopus 로고
    • A model for effective implementation of earned value management methodology
    • Kim E.H., Wells J., Duffey M.R. A model for effective implementation of earned value management methodology. Int. J. Proj. Manag. 2003, 21(5):375-382. 10.1016/S0263-7863(02)00049-2.
    • (2003) Int. J. Proj. Manag. , vol.21 , Issue.5 , pp. 375-382
    • Kim, E.H.1    Wells, J.2    Duffey, M.R.3
  • 29
    • 40249098866 scopus 로고    scopus 로고
    • Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    • Lambrechts O., Demeulemeester E., Herroelen W. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. J. Sched. 2008, 11(2):121-136. 10.1007/s10951-007-0021-0.
    • (2008) J. Sched. , vol.11 , Issue.2 , pp. 121-136
    • Lambrechts, O.1    Demeulemeester, E.2    Herroelen, W.3
  • 30
    • 79952437985 scopus 로고    scopus 로고
    • Applying management reserve to software project management
    • Lipke W.H. Applying management reserve to software project management. J. Def. Softw. Eng. 1999, 17-21.
    • (1999) J. Def. Softw. Eng. , pp. 17-21
    • Lipke, W.H.1
  • 31
    • 22744437020 scopus 로고    scopus 로고
    • Schedule is different
    • Lipke, W., 2003. Schedule is different. The Measurable News, 3 31-34.
    • (2003) The Measurable News , vol.3 , pp. 31-34
    • Lipke, W.1
  • 32
    • 79960041465 scopus 로고    scopus 로고
    • The probability of success
    • Lipke W. The probability of success. J. Qual. Assur. Inst. 2004, 14-21.
    • (2004) J. Qual. Assur. Inst. , pp. 14-21
    • Lipke, W.1
  • 33
    • 64449085007 scopus 로고    scopus 로고
    • Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes
    • Lipke W., Zwikael O., Henderson K., Anbari F. Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int. J. Proj. Manag. 2009, 27(4):400-407. 10.1016/j.ijproman.2008.02.009.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.4 , pp. 400-407
    • Lipke, W.1    Zwikael, O.2    Henderson, K.3    Anbari, F.4
  • 34
    • 0142063407 scopus 로고    scopus 로고
    • Novelty detection: a review-part 1: statistical approaches
    • Markou M., Singh S. Novelty detection: a review-part 1: statistical approaches. Signal Process. 2003, 83(12):2481-2497. 10.1016/j.sigpro.2003.07.018.
    • (2003) Signal Process. , vol.83 , Issue.12 , pp. 2481-2497
    • Markou, M.1    Singh, S.2
  • 35
    • 0142126712 scopus 로고    scopus 로고
    • Novelty detection: a review-part 2: neural network based approaches
    • Markou M., Singh S. Novelty detection: a review-part 2: neural network based approaches. Signal Process. 2003, 83(12):2499-2521. 10.1016/j.sigpro.2003.07.019.
    • (2003) Signal Process. , vol.83 , Issue.12 , pp. 2499-2521
    • Markou, M.1    Singh, S.2
  • 36
    • 0033690431 scopus 로고    scopus 로고
    • Project performance control in reconstruction projects
    • McKim R., Hegazy T., Attalla M. Project performance control in reconstruction projects. J. Constr. Eng. Manag. 2000, 126(2):137-141.
    • (2000) J. Constr. Eng. Manag. , vol.126 , Issue.2 , pp. 137-141
    • McKim, R.1    Hegazy, T.2    Attalla, M.3
  • 37
    • 79952441224 scopus 로고    scopus 로고
    • Evaluating fuzzy earned value indices and estimates by applying alpha cuts
    • Moslemi Naeni L., Salehipour A. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Syst. Appl. 2011, 38(7):8193-8198. 10.1016/j.eswa.2010.12.165.
    • (2011) Expert Syst. Appl. , vol.38 , Issue.7 , pp. 8193-8198
    • Moslemi Naeni, L.1    Salehipour, A.2
  • 38
    • 79960069130 scopus 로고    scopus 로고
    • A fuzzy approach for the earned value management
    • Naeni L.M., Shadrokh S., Salehipour A. A fuzzy approach for the earned value management. Int. J. Proj. Manag. 2011, 29(6):764-772. 10.1016/j.ijproman.2010.07.012.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.6 , pp. 764-772
    • Naeni, L.M.1    Shadrokh, S.2    Salehipour, A.3
  • 39
    • 84901636676 scopus 로고    scopus 로고
    • An earned schedule-based regression model to improve cost estimate at completion
    • Narbaev T., De Marco A. An earned schedule-based regression model to improve cost estimate at completion. Int. J. Proj. Manag. 2014, 32(6):1007-1018. 10.1016/j.ijproman.2013.12.005.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.6 , pp. 1007-1018
    • Narbaev, T.1    De Marco, A.2
  • 40
    • 79955974818 scopus 로고    scopus 로고
    • An extension of the EVM analysis for project monitoring: the Cost Control Index and the Schedule Control Index
    • Pajares J., López-Paredes A. An extension of the EVM analysis for project monitoring: the Cost Control Index and the Schedule Control Index. Int. J. Proj. Manag. 2011, 29(5):615-621. 10.1016/j.ijproman.2010.04.005.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.5 , pp. 615-621
    • Pajares, J.1    López-Paredes, A.2
  • 42
    • 0003243224 scopus 로고    scopus 로고
    • Probabilities for SV machines
    • MIT Press, Cambridge, MA, A.J. Smola, P.L. Bartlett, B. Schölkopf, D. Schuurmans (Eds.)
    • Platt J. Probabilities for SV machines. Advances in Large Margin Classifiers 2000, 61-74. MIT Press, Cambridge, MA. A.J. Smola, P.L. Bartlett, B. Schölkopf, D. Schuurmans (Eds.).
    • (2000) Advances in Large Margin Classifiers , pp. 61-74
    • Platt, J.1
  • 43
    • 72049118175 scopus 로고    scopus 로고
    • A model-based DSS for integrating the impact of learning in project control
    • Plaza M., Turetken O. A model-based DSS for integrating the impact of learning in project control. Decis. Support. Syst. 2009, 47(4):488-499. 10.1016/j.dss.2009.04.010.
    • (2009) Decis. Support. Syst. , vol.47 , Issue.4 , pp. 488-499
    • Plaza, M.1    Turetken, O.2
  • 44
    • 0000629975 scopus 로고
    • Cross-validatory choice and assessment of statistical predictions
    • Stone M. Cross-validatory choice and assessment of statistical predictions. J. R. Stat. Soc. Ser. B 1974, 36(2):111-147.
    • (1974) J. R. Stat. Soc. Ser. B , vol.36 , Issue.2 , pp. 111-147
    • Stone, M.1
  • 45
    • 79952631789 scopus 로고    scopus 로고
    • Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics
    • Tseng C.C. Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics. J. Chin. Inst. Ind. Eng. 2011, 28(3):165-178. 10.1080/10170669.2010.532598.
    • (2011) J. Chin. Inst. Ind. Eng. , vol.28 , Issue.3 , pp. 165-178
    • Tseng, C.C.1
  • 46
    • 33644860703 scopus 로고    scopus 로고
    • Bias in error estimation when using cross-validation for model selection
    • Varma S., Simon R. Bias in error estimation when using cross-validation for model selection. BMC Bioinf. 2006, 7(1):91. 10.1186/1471-2105-7-91.
    • (2006) BMC Bioinf. , vol.7 , Issue.1 , pp. 91
    • Varma, S.1    Simon, R.2
  • 48
    • 84906847683 scopus 로고    scopus 로고
    • Support Vector Machine regression for project control forecasting
    • Wauters M., Vanhoucke M. Support Vector Machine regression for project control forecasting. Autom. Constr. 2014, 47:92-106. 10.1016/j.autcon.2014.07.014.
    • (2014) Autom. Constr. , vol.47 , pp. 92-106
    • Wauters, M.1    Vanhoucke, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.