메뉴 건너뛰기




Volumn 31, Issue 5, 2015, Pages

Understanding the determinants of program organization for construction megaproject success: Case study of the Shanghai expo construction

Author keywords

China; Client organizations; Construction megaprojects; Program organization

Indexed keywords

ENVIRONMENTAL TECHNOLOGY; EXHIBITIONS; HUMAN RESOURCE MANAGEMENT;

EID: 84939536179     PISSN: 0742597X     EISSN: 19435479     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000310     Document Type: Article
Times cited : (70)

References (62)
  • 3
    • 56549090296 scopus 로고    scopus 로고
    • Foundations of program management: A bibliometric view
    • Arttoa, K., Martinsuo, M., Gemuenden, H. G., Murtoaro, J. (2008). " Foundations of program management: A bibliometric view." Int. J. Proj. Manage., 27 (1), 1-18. 10.1016/j.ijproman.2007.10.007 IPMAEL 0263-7863
    • (2008) Int. J. Proj. Manage. , vol.27 , Issue.1 , pp. 1-18
    • Arttoa, K.1    Martinsuo, M.2    Gemuenden, H.G.3    Murtoaro, J.4
  • 5
    • 77955512147 scopus 로고    scopus 로고
    • Program management and the creative art of cooperation: Dealing with potential tensions and synergies between spatial development projects
    • Buuren, A. V., Buijs, J. M., and, Teisman, G. (2010). " Program management and the creative art of cooperation: Dealing with potential tensions and synergies between spatial development projects." Int. J. Proj. Manage., 28 (7), 672-682. 10.1016/j.ijproman.2009.12.002 IPMAEL 0263-7863
    • (2010) Int. J. Proj. Manage. , vol.28 , Issue.7 , pp. 672-682
    • Buuren, A.V.1    Buijs, J.M.2    Teisman, G.3
  • 6
    • 84939495048 scopus 로고
    • Managerial responsibility of project managers
    • Chan, A. P. C. (1994). " Managerial responsibility of project managers." Aust. Inst. Build. Pap., 5 (1993/1994), 109-120.
    • (1994) Aust. Inst. Build. Pap. , vol.5 , Issue.199 , pp. 109-120
    • Chan, A.P.C.1
  • 7
    • 45749104456 scopus 로고    scopus 로고
    • Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong
    • Chan, A. P. C., Chan, D. W. M., Fan, W. C. N. L., Lam, P. T. I., and, Yeung, F. Y. (2008). " Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2008)24:3(128), 128-137. JMENEA 0742-597X
    • (2008) J. Manage. Eng. , pp. 128-137
    • Chan, A.P.C.1    Chan, D.W.M.2    Fan, W.C.N.L.3    Lam, P.T.I.4    Yeung, F.Y.5
  • 8
    • 13944265046 scopus 로고    scopus 로고
    • Factors affecting the success of a construction project
    • Chan, A. P. C., Scott, D., and, Chan, A. P. L. (2004). " Factors affecting the success of a construction project." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:1(153), 153-155. JCEMD4 0733-9364
    • (2004) J. Constr. Eng. Manage. , pp. 153-155
    • Chan, A.P.C.1    Scott, D.2    Chan, A.P.L.3
  • 9
    • 0035501633 scopus 로고    scopus 로고
    • Application of Delphi method in selection of procurement systems for construction projects
    • Chan, A. P. C., Yung, E. H. K., Lam, P. T. I., Tam, C. M., and, Cheung, S. O. (2001). " Application of Delphi method in selection of procurement systems for construction projects." Constr. Manage. Econ., 19 (7), 699-718. 10.1080/01446190110066128 CMECF3 0144-6193
    • (2001) Constr. Manage. Econ. , vol.19 , Issue.7 , pp. 699-718
    • Chan, A.P.C.1    Yung, E.H.K.2    Lam, P.T.I.3    Tam, C.M.4    Cheung, S.O.5
  • 10
    • 77950295871 scopus 로고    scopus 로고
    • Competencies for managing change
    • Crawford, L., and, Nahmias, A. H. (2010). " Competencies for managing change." Int. J. Proj. Manage., 28 (4), 405-412. 10.1016/j.ijproman.2010.01.015 IPMAEL 0263-7863
    • (2010) Int. J. Proj. Manage. , vol.28 , Issue.4 , pp. 405-412
    • Crawford, L.1    Nahmias, A.H.2
  • 11
    • 65349109147 scopus 로고    scopus 로고
    • Innovation in megaprojects: System integration at London Heathrow terminal 5
    • Davies, A., Gann, D., and, Douglas, T. (2009). " Innovation in megaprojects: System integration at London Heathrow terminal 5." Calif. Manage. Rev., 51 (2), 101-125. 10.2307/41166482 0008-1256
    • (2009) Calif. Manage. Rev. , vol.51 , Issue.2 , pp. 101-125
    • Davies, A.1    Gann, D.2    Douglas, T.3
  • 13
    • 0011729627 scopus 로고
    • Decision variables for selecting prototyping in information systems development: A Delphi study of MIS managers
    • Doke, E. R., and, Swanson, N. E. (1995). " Decision variables for selecting prototyping in information systems development: A Delphi study of MIS managers." Inf. Manage., 29 (4), 173-182. 10.1016/0378-7206(95)00021-N IMANDC
    • (1995) Inf. Manage. , vol.29 , Issue.4 , pp. 173-182
    • Doke, E.R.1    Swanson, N.E.2
  • 14
    • 79953230898 scopus 로고    scopus 로고
    • What great projects have in common?
    • Dvir, D., and, Shenhar, A. J. (2011). " What great projects have in common? " Sloan Manage. Rev., 52 (3), 18-21. SMRVAO 0019-848X
    • (2011) Sloan Manage. Rev. , vol.52 , Issue.3 , pp. 18-21
    • Dvir, D.1    Shenhar, A.J.2
  • 15
    • 84862702819 scopus 로고    scopus 로고
    • Maximizing strategic value from megaprojects: The influence of information-feed on decision-making by the project manager
    • Eweje, J., Turner, R., and, Mueller, R. (2012). " Maximizing strategic value from megaprojects: The influence of information-feed on decision-making by the project manager." Int. J. Proj. Manage., 30 (6), 639-651. 10.1016/j.ijproman.2012.01.004 IPMAEL 0263-7863
    • (2012) Int. J. Proj. Manage. , vol.30 , Issue.6 , pp. 639-651
    • Eweje, J.1    Turner, R.2    Mueller, R.3
  • 17
    • 84931068164 scopus 로고    scopus 로고
    • (May 19, 2011).
    • Flyvbjerg, B. (2009). " What is a megaproject? " (http://flyvbjerg.plan.aau.dk/whatisamegaproject.php) (May 19, 2011).
    • (2009) What is A Megaproject?
    • Flyvbjerg, B.1
  • 19
    • 75649150289 scopus 로고    scopus 로고
    • Qualitative research: Application of the Delphi method to CEM research
    • Hallowell, M., and, Gambatese, J. (2010). " Qualitative research: Application of the Delphi method to CEM research." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000137, 99-107. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 99-107
    • Hallowell, M.1    Gambatese, J.2
  • 20
    • 34249658964 scopus 로고    scopus 로고
    • The futures of construction: A critical review of construction future studies
    • Harty, C., Goodier, C. I., Soetanto, R., Austin, S., Dainty, A. R. J., and, Price, A. D. F. (2007). " The futures of construction: A critical review of construction future studies." Constr. Manage. Econ., 25 (5), 477-493. 10.1080/01446190600879117 CMECF3 0144-6193
    • (2007) Constr. Manage. Econ. , vol.25 , Issue.5 , pp. 477-493
    • Harty, C.1    Goodier, C.I.2    Soetanto, R.3    Austin, S.4    Dainty, A.R.J.5    Price, A.D.F.6
  • 21
    • 0036625184 scopus 로고    scopus 로고
    • Transportation at the millennium: In search of a megaproject lens
    • Haynes, W. (2002). " Transportation at the millennium: In search of a megaproject lens." Rev. Pol. Res., 19 (2), 62-64. 10.1111/ropr.2002.19.issue-2 1541-132X
    • (2002) Rev. Pol. Res. , vol.19 , Issue.2 , pp. 62-64
    • Haynes, W.1
  • 22
    • 84876263408 scopus 로고    scopus 로고
    • Empirical study to investigate the difficulties of implementing safety practices in the repair and maintenance sector in Hong Kong
    • Hon, C., Chan, A., and, Yam, M. (2012). " Empirical study to investigate the difficulties of implementing safety practices in the repair and maintenance sector in Hong Kong." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000497, 877-884. JCEMD4 0733-9364
    • (2012) J. Constr. Eng. Manage. , pp. 877-884
    • Hon, C.1    Chan, A.2    Yam, M.3
  • 24
    • 84873361221 scopus 로고    scopus 로고
    • Improving megasite management performance through incentives: Lessons learned from the Shanghai Expo construction
    • (b).
    • Hu, Y., Chan, A. P. C., Le, Y., Jiang, W. P., Xie, L. L., and, Hon, C. H. K. (2012 b). " Improving megasite management performance through incentives: Lessons learned from the Shanghai Expo construction." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000102, 330-337. JMENEA 0742-597X
    • (2012) J. Manage. Eng. , pp. 330-337
    • Hu, Y.1    Chan, A.P.C.2    Le, Y.3    Jiang, W.P.4    Xie, L.L.5    Hon, C.H.K.6
  • 25
    • 34250203486 scopus 로고    scopus 로고
    • International Development Research Center and Inter-American Development Bank. Ottawa, Canada.
    • International Development Research Center and Inter-American Development Bank. (2002). Organizational assessment: A framework for improving performance, Ottawa, Canada.
    • (2002) Organizational Assessment: A Framework for Improving Performance
  • 26
    • 0041839992 scopus 로고    scopus 로고
    • International Project Management Association (IPMA). (April 10, 2010).
    • International Project Management Association (IPMA). (2006). ICB-IPMA Competency Baselines, Version 3.0, (http://www.ipma.ch/downloads/Pages/Certification.aspx) (April 10, 2010).
    • (2006) ICB-IPMA Competency Baselines, Version 3.0
  • 27
    • 68349133252 scopus 로고    scopus 로고
    • Conceptual model of intelligent program management information systems (iPMIS) for urban renewal mega projects
    • Kim, J. H., Yoon, J. Y., Kim, K. H., and, Kim, J. J. (2009). " Conceptual model of intelligent program management information systems (iPMIS) for urban renewal mega projects." J. Asian Archit. Build. Eng., 8 (1), 57-64. 10.3130/jaabe.8.57
    • (2009) J. Asian Archit. Build. Eng. , vol.8 , Issue.1 , pp. 57-64
    • Kim, J.H.1    Yoon, J.Y.2    Kim, K.H.3    Kim, J.J.4
  • 28
    • 49249136333 scopus 로고    scopus 로고
    • Korea experience project management consortium on the U.S. Forces Korea relocation program
    • Ko, O. Y., and, Paek, J. H. (2008). " Korea experience project management consortium on the U.S. forces Korea relocation program." J. Asian Archit. Build. Eng., 7 (1), 85-92. 10.3130/jaabe.7.85
    • (2008) J. Asian Archit. Build. Eng. , vol.7 , Issue.1 , pp. 85-92
    • Ko, O.Y.1    Paek, J.H.2
  • 29
    • 26644442577 scopus 로고    scopus 로고
    • Constructing relationally integrated team
    • Kumaraswamy, M., Ling, F., Rahman, M., and, Phng, S. (2005). " Constructing relationally integrated team." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:10(1076), 1076-1086. 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 1076-1086
    • Kumaraswamy, M.1    Ling, F.2    Rahman, M.3    Phng, S.4
  • 31
    • 80053443429 scopus 로고    scopus 로고
    • Public participation in infrastructure and construction projects in China: From an EIA-based to a whole-cycle process
    • Li, T. H. Y., Ng, S. T., and, Skitmore, M. (2012). " Public participation in infrastructure and construction projects in China: From an EIA-based to a whole-cycle process." Habitat Int., 36 (1), 47-56. 10.1016/j.habitatint.2011.05.006 0197-3975
    • (2012) Habitat Int. , vol.36 , Issue.1 , pp. 47-56
    • Li, T.H.Y.1    Ng, S.T.2    Skitmore, M.3
  • 32
    • 84908077345 scopus 로고    scopus 로고
    • Risk management in a mega-project: The universal expo 2015 case
    • Locatelli, G., and, Mancini, M. (2010). " Risk management in a mega-project: The universal expo 2015 case." Int. J. Proj. Organ. Manage., 2 (3), 236-253. 1740-2891
    • (2010) Int. J. Proj. Organ. Manage. , vol.2 , Issue.3 , pp. 236-253
    • Locatelli, G.1    Mancini, M.2
  • 33
    • 1642487670 scopus 로고    scopus 로고
    • Programme management: A critical review
    • Lycett, M., Rassau, A., and, Danson, J. (2004). " Programme management: A critical review." Int. J. Proj. Manage., 22 (4), 289-299. 10.1016/j.ijproman.2003.06.001 IPMAEL 0263-7863
    • (2004) Int. J. Proj. Manage. , vol.22 , Issue.4 , pp. 289-299
    • Lycett, M.1    Rassau, A.2    Danson, J.3
  • 34
    • 77956617287 scopus 로고
    • Method of technological forecasting.", W. A. Hahn and K. F. Gordon, eds. Gordon and Breach Science, New York, NY.
    • Martino, J. (1973). " Method of technological forecasting." Assessing the future and policy planning, W. A. Hahn and K. F. Gordon., eds., Gordon and Breach Science, New York, NY.
    • (1973) Assessing the Future and Policy Planning
    • Martino, J.1
  • 37
    • 84924989382 scopus 로고    scopus 로고
    • A brief history of project management.", P. W. G. Morris, J. K. Pinto, and J. Soderlund, eds. Oxford University Press, Oxford, U.K.
    • Morris, P. W. G. (2011). " A brief history of project management." The Oxford handbook of project management, P. W. G. Morris, J. K. Pinto, and J. Soderlund., eds., Oxford University Press, Oxford, U.K., 15-36.
    • (2011) The Oxford Handbook of Project Management , pp. 15-36
    • Morris, P.W.G.1
  • 38
    • 9144224919 scopus 로고    scopus 로고
    • A study on project success factors in large construction projects in Vietnam
    • Nguyen, L. D., Ogunlana, S. O., and, Lan, D. T. X. (2004). " A study on project success factors in large construction projects in Vietnam." Eng. Construct. Architect. Manage., 11 (6), 404-413. 10.1108/09699980410570166 0969-9988
    • (2004) Eng. Construct. Architect. Manage. , vol.11 , Issue.6 , pp. 404-413
    • Nguyen, L.D.1    Ogunlana, S.O.2    Lan, D.T.X.3
  • 41
    • 12444257792 scopus 로고    scopus 로고
    • Attributes and levels of programme management competence: An interpretive study
    • Partington, D., Pellegrinelli, S., and, Young, M. (2005). " Attributes and levels of programme management competence: An interpretive study." Int. J. Proj. Manage., 23 (2), 87-95. 10.1016/j.ijproman.2004.06.004 IPMAEL 0263-7863
    • (2005) Int. J. Proj. Manage. , vol.23 , Issue.2 , pp. 87-95
    • Partington, D.1    Pellegrinelli, S.2    Young, M.3
  • 42
    • 0036532704 scopus 로고    scopus 로고
    • Shaping context: The role and challenge for programmes
    • Pellegrinelli, S. (2002). " Shaping context: The role and challenge for programmes." Int. J. Proj. Manage., 20 (3), 229-233. 10.1016/S0263-7863(01)00073-4 IPMAEL 0263-7863
    • (2002) Int. J. Proj. Manage. , vol.20 , Issue.3 , pp. 229-233
    • Pellegrinelli, S.1
  • 43
    • 84856621707 scopus 로고    scopus 로고
    • Program management: An emerging opportunity for research and scholarship.", P. W. G. Morris, J. K. Pinto, and J. Soderlund, eds. Oxford University Press, Oxford, U.K.
    • Pellegrinelli, S., Partington, D., and, Geraldi, J. G. (2011). " Program management: An emerging opportunity for research and scholarship." The Oxford handbook of project management, P. W. G. Morris, J. K. Pinto, and J. Soderlund., eds., Oxford University Press, Oxford, U.K., 252-272.
    • (2011) The Oxford Handbook of Project Management , pp. 252-272
    • Pellegrinelli, S.1    Partington, D.2    Geraldi, J.G.3
  • 44
    • 33845677672 scopus 로고    scopus 로고
    • The importance of context in programme management: An empirical review of programme practices
    • Pellegrinelli, S., Partington, D., Hemingway, C., Mohdzain, Z., and, Shah, M. (2007). " The importance of context in programme management: An empirical review of programme practices." Int. J. Proj. Manage., 25 (1), 41-55. 10.1016/j.ijproman.2006.06.002 IPMAEL 0263-7863
    • (2007) Int. J. Proj. Manage. , vol.25 , Issue.1 , pp. 41-55
    • Pellegrinelli, S.1    Partington, D.2    Hemingway, C.3    Mohdzain, Z.4    Shah, M.5
  • 45
    • 75649127257 scopus 로고    scopus 로고
    • Public versus private perceptions on hiring an external program manager
    • Rasdorf, W., Grasso, B., and, Bridgers, M. (2010). " Public versus private perceptions on hiring an external program manager." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2010)136:2(219), 219-226. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 219-226
    • Rasdorf, W.1    Grasso, B.2    Bridgers, M.3
  • 47
    • 59649100795 scopus 로고    scopus 로고
    • Dimensions of distance in a project network: Exploring Olkiluoto 3 nuclear power plant project
    • Ruuska, I., Artto, K., Aaltonen, K., and, Lehtonen, P. (2009). " Dimensions of distance in a project network: Exploring Olkiluoto 3 nuclear power plant project." Int. J. Proj. Manage., 27 (2), 142-153. 10.1016/j.ijproman.2008.09.003 IPMAEL 0263-7863
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.2 , pp. 142-153
    • Ruuska, I.1    Artto, K.2    Aaltonen, K.3    Lehtonen, P.4
  • 48
    • 84922653907 scopus 로고    scopus 로고
    • Shanghai Expo Construction Headquarters (SECH) Office. Shanghai, China.
    • Shanghai Expo Construction Headquarters (SECH) Office. (2008). The outlines of Shanghai Expo construction, Shanghai, China.
    • (2008) The Outlines of Shanghai Expo Construction
  • 49
    • 84922665651 scopus 로고    scopus 로고
    • Shanghai Expo Construction Headquarters (SECH) Office. Shanghai, China.
    • Shanghai Expo Construction Headquarters (SECH) Office. (2009). The outlines of Shanghai Expo construction, Shanghai, China.
    • (2009) The Outlines of Shanghai Expo Construction
  • 50
    • 68649113751 scopus 로고    scopus 로고
    • Construction programme management theory and practice: Contextual and pragmatic approach
    • Shehu, Z., and, Akintoye, A. (2009). " Construction programme management theory and practice: Contextual and pragmatic approach." Int. J. Proj. Manage., 27 (7), 703-716. 10.1016/j.ijproman.2009.02.005 IPMAEL 0263-7863
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.7 , pp. 703-716
    • Shehu, Z.1    Akintoye, A.2
  • 51
    • 70549098193 scopus 로고    scopus 로고
    • Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis
    • Shehu, Z., and, Akintoye, A. (2010). " Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis." Int. J. Proj. Manage., 28 (1), 26-39. 10.1016/j.ijproman.2009.02.004 IPMAEL 0263-7863
    • (2010) Int. J. Proj. Manage. , vol.28 , Issue.1 , pp. 26-39
    • Shehu, Z.1    Akintoye, A.2
  • 54
    • 84939536344 scopus 로고    scopus 로고
    • Statistical Package for Social Sciences (SPSS) 19.0 [Computer software]. SPPS Inc. Chicago.
    • Statistical Package for Social Sciences (SPSS) 19.0 [Computer software]. SPPS Inc., Chicago.
  • 56
    • 84931084082 scopus 로고    scopus 로고
    • Record spending on infrastructure will help to sustain rapid growth in emerging economies
    • The Economist.
    • The Economist. (2008). " Record spending on infrastructure will help to sustain rapid growth in emerging economies." Building BRICs of growth, 88.
    • (2008) Building BRICs of Growth , pp. 88
  • 57
    • 44649102080 scopus 로고    scopus 로고
    • Project Management Institute, Newtown Square, PA.
    • The standard for program management. (2006). Project Management Institute, Newtown Square, PA.
    • (2006) The Standard for Program Management
  • 58
    • 84939555587 scopus 로고    scopus 로고
    • United Nations Environmental Programmes (UNEP). "." (Nov. 7, 2012).
    • United Nations Environmental Programmes (UNEP). (2009). " The environmental impact assessment report of expo 2010 Shanghai China." (http://www.unep.org/pdf/SHANGHAI-REPORT-FullReport.pdf) (Nov. 7, 2012).
    • (2009) The Environmental Impact Assessment Report of Expo 2010 Shanghai China
  • 59
    • 0037565956 scopus 로고    scopus 로고
    • Archival research methods.", J. A. C. Baum, ed. Wiley-Blackwell, Oxford, U.K.
    • Ventresca, M. J., and, Mohr, J. W. (2005). " Archival research methods." The Blackwell companion to organizations, J. A. C. Baum., ed., Wiley-Blackwell, Oxford, U.K., 805-828.
    • (2005) The Blackwell Companion to Organizations , pp. 805-828
    • Ventresca, M.J.1    Mohr, J.W.2
  • 60
    • 77956613793 scopus 로고    scopus 로고
    • Developing a risk assessment model for PPP projects in China: A fuzzy synthetic evaluation approach
    • Xu, Y. L., Yeung, J. F. Y., Chan, A. P. C., Chan, W. M. D., Wang, S. Q., and, Ke, Y. J. (2010). " Developing a risk assessment model for PPP projects in China: A fuzzy synthetic evaluation approach." Autom. Constr., 19 (7), 929-943. 10.1016/j.autcon.2010.06.006 AUCOES 0926-5805
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 929-943
    • Xu, Y.L.1    Yeung, J.F.Y.2    Chan, A.P.C.3    Chan, W.M.D.4    Wang, S.Q.5    Ke, Y.J.6
  • 62
    • 34447566136 scopus 로고    scopus 로고
    • Understanding the key risks in construction projects in China
    • Zou, P. X. W., Zhang, G. M., and, Wang, J. Y. (2007). " Understanding the key risks in construction projects in China." Int. J. Proj. Manage., 25 (6), 601-614. 10.1016/j.ijproman.2007.03.001 IPMAEL 0263-7863
    • (2007) Int. J. Proj. Manage. , vol.25 , Issue.6 , pp. 601-614
    • Zou, P.X.W.1    Zhang, G.M.2    Wang, J.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.