메뉴 건너뛰기




Volumn 31, Issue 5, 2015, Pages

Dynamic control thresholds for consistent earned value analysis and reliable early warning

Author keywords

Control thresholds; Cost control; Earned value management; Schedule control

Indexed keywords

BUDGET CONTROL; PROJECT MANAGEMENT; RISK ASSESSMENT;

EID: 84939479442     PISSN: 0742597X     EISSN: 19435479     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000309     Document Type: Article
Times cited : (20)

References (22)
  • 1
    • 33645957411 scopus 로고    scopus 로고
    • Earned value project management method and extensions
    • Anbari, F. T. (2003). " Earned value project management method and extensions." Project Manage. J., 34 (4), 12-23. 1938-9507
    • (2003) Project Manage. J. , vol.34 , Issue.4 , pp. 12-23
    • Anbari, F.T.1
  • 5
    • 84859617329 scopus 로고    scopus 로고
    • Using the earned value management system to improve electrical project control
    • Hanna, A. S. (2012). " Using the earned value management system to improve electrical project control." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000426, 449-457. JCEMD4 0733-9364
    • (2012) J. Constr. Eng. Manage. , pp. 449-457
    • Hanna, A.S.1
  • 6
    • 33646010711 scopus 로고    scopus 로고
    • Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data
    • Henderson, K. (2003). " Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data." Meas. News, 13-17, 21-23.
    • (2003) Meas. News , vol.13-17 , pp. 21-23
    • Henderson, K.1
  • 7
    • 22744440305 scopus 로고    scopus 로고
    • Further developments in earned schedule
    • Henderson, K. (2004). " Further developments in earned schedule." Meas. News, 15-16, 20-22.
    • (2004) Meas. News , vol.15-16 , pp. 20-22
    • Henderson, K.1
  • 9
    • 35448950734 scopus 로고    scopus 로고
    • Forecasting schedule completion using earned value metrics... Revisited
    • Jacob, D., and, Kane, M. (2004). " Forecasting schedule completion using earned value metrics... revisited." Meas. News, 11-17.
    • (2004) Meas. News , pp. 11-17
    • Jacob, D.1    Kane, M.2
  • 10
    • 84939555569 scopus 로고    scopus 로고
    • Chemical plant construction: Probabilistic schedule forecasting and risk assessment.", Taylor and Francis.
    • Kim, B.-C. (2013). " Chemical plant construction: Probabilistic schedule forecasting and risk assessment." Encyclopedia of chemical processing, Taylor and Francis.
    • (2013) Encyclopedia of Chemical Processing
    • Kim, B.-C.1
  • 11
    • 60449092091 scopus 로고    scopus 로고
    • Probabilistic forecasting of project duration using Bayesian inference and the beta distribution
    • Kim, B.-C., and, Reinschmidt, K. F. (2009). " Probabilistic forecasting of project duration using Bayesian inference and the beta distribution." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:3(178), 178-186. JCEMD4 0733-9364
    • (2009) J. Constr. Eng. Manage. , pp. 178-186
    • Kim, B.-C.1    Reinschmidt, K.F.2
  • 12
    • 77955321825 scopus 로고    scopus 로고
    • Probabilistic forecasting of project duration using Kalman filter and the earned value method
    • Kim, B.-C., and, Reinschmidt, K. F. (2010). " Probabilistic forecasting of project duration using Kalman filter and the earned value method." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000192, 834-843. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 834-843
    • Kim, B.-C.1    Reinschmidt, K.F.2
  • 13
    • 84856096504 scopus 로고    scopus 로고
    • History, practices, and future of earned value management in government: Perspectives from NASA
    • Kwak, Y. H., and, Anbari, F. T. (2012). " History, practices, and future of earned value management in government: Perspectives from NASA." Project Manage. J., 43 (1), 77-90. 1938-9507 10.1002/pmj.v43.1
    • (2012) Project Manage. J. , vol.43 , Issue.1 , pp. 77-90
    • Kwak, Y.H.1    Anbari, F.T.2
  • 16
    • 84891408629 scopus 로고    scopus 로고
    • Combination of growth model and earned schedule to forecast project cost at completion
    • 04013038.
    • Narbaev, T., and, De Marco, A. (2014). " Combination of growth model and earned schedule to forecast project cost at completion." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000783, 04013038. JCEMD4 0733-9364
    • (2014) J. Constr. Eng. Manage.
    • Narbaev, T.1    De Marco, A.2
  • 17
    • 84962841436 scopus 로고    scopus 로고
    • National Aeronautics and Space Administration (NASA). Washington, DC.
    • National Aeronautics and Space Administration (NASA). (2013). Earned value management implementation handbook, Washington, DC.
    • (2013) Earned Value Management Implementation Handbook
  • 18
    • 46949108094 scopus 로고    scopus 로고
    • Project Management Institute (PMI). 2nd Ed. Newtown Square, PA.
    • Project Management Institute (PMI). (2011). Practice standard for earned value management, 2nd Ed., Newtown Square, PA.
    • (2011) Practice Standard for Earned Value Management
  • 19
    • 84911482598 scopus 로고    scopus 로고
    • Project Management Institute (PMI). 5th Ed. Newtown Square, PA.
    • Project Management Institute (PMI). (2013). A guide to the project management body of knowledge, 5th Ed., Newtown Square, PA.
    • (2013) A Guide to the Project Management Body of Knowledge
  • 20
    • 84875026723 scopus 로고    scopus 로고
    • Toward automated earned value tracking using 3D imaging tools
    • Turkan, Y., Bosché, F., Haas, C., and, Haas, R. (2013). " Toward automated earned value tracking using 3D imaging tools." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000629, 423-433. JCEMD4 0733-9364
    • (2013) J. Constr. Eng. Manage. , pp. 423-433
    • Turkan, Y.1    Bosché, F.2    Haas, C.3    Haas, R.4
  • 21
    • 78649854792 scopus 로고    scopus 로고
    • On the dynamic use of project performance and schedule risk information during project tracking
    • Vanhoucke, M. (2011). " On the dynamic use of project performance and schedule risk information during project tracking." Omega, 39 (4), 416-426. OMEGA6 0305-0483 10.1016/j.omega.2010.09.006
    • (2011) Omega , vol.39 , Issue.4 , pp. 416-426
    • Vanhoucke, M.1
  • 22
    • 35448944883 scopus 로고    scopus 로고
    • A simulation and evaluation of earned value metrics to forecast the project duration
    • Vanhoucke, M., and, Vandevoorde, S. (2007). " A simulation and evaluation of earned value metrics to forecast the project duration." J. Oper. Res. Soc., 58 (10), 1361-1374. JORSDZ 10.1057/palgrave.jors.2602296
    • (2007) J. Oper. Res. Soc. , vol.58 , Issue.10 , pp. 1361-1374
    • Vanhoucke, M.1    Vandevoorde, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.