메뉴 건너뛰기




Volumn 136, Issue 8, 2010, Pages 834-843

Probabilistic forecasting of project duration using Kalman filter and the earned value method

Author keywords

Construction management; Forecasting; Kalman filter; Kalman filters; Project controls; Schedule management; Scheduling

Indexed keywords

CONSTRUCTION MANAGEMENT; EARNED VALUE; FORECASTING METHODS; LOSS OF ACCURACY; MICROSOFT EXCEL; PREDICTION ERRORS; PROBABILISTIC FORECASTING; PROBABILISTIC PREDICTION; PROJECT CONTROL; PROJECT CONTROLS; PROJECT COST; PROJECT DURATION; PROJECT SCHEDULES; REAL PROJECTS; S-CURVE; SCHEDULE FORECASTING; SCHEDULE MANAGEMENT; SCHEDULE METHODS; SCHEDULE PERFORMANCE; SMALL SAMPLE SIZE;

EID: 77955321825     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000192     Document Type: Article
Times cited : (59)

References (32)
  • 1
    • 0001707631 scopus 로고
    • Estimation, filtering, and smoothing in state space models with incompletely specified initial conditions
    • ASTSC7 0090-5364, 10.1214/aos/1176349739
    • Ansley, C. F., and Kohn, R. (1985). " Estimation, filtering, and smoothing in state space models with incompletely specified initial conditions.." Ann. Stat. ASTSC7 0090-5364, 13 (4), 1286-1316. 10.1214/aos/1176349739
    • (1985) Ann. Stat. , vol.13 , Issue.4 , pp. 1286-1316
    • Ansley, C.F.1    Kohn, R.2
  • 2
    • 0028667967 scopus 로고
    • Streamflow forecasting for Han River basin, Korea
    • JWRMD5 0733-9496, 10.1061/(ASCE)0733-9496(1994)120:5(651)
    • Awwad, H. M., Valdes, J. B., and Restrepo, P. J. (1994). " Streamflow forecasting for Han River basin, Korea.." J. Water Resour. Plann. Manage. JWRMD5 0733-9496, 120 (5), 651-673. 10.1061/(ASCE)0733-9496(1994) 120:5(651)
    • (1994) J. Water Resour. Plann. Manage. , vol.120 , Issue.5 , pp. 651-673
    • Awwad, H.M.1    Valdes, J.B.2    Restrepo, P.J.3
  • 3
    • 0033690430 scopus 로고    scopus 로고
    • Probabilistic monitoring of project performance using SS-curves
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2000)126:2(142)
    • Barraza, G. A., Back, W. E., and Mata, F. (2000). " Probabilistic monitoring of project performance using SS-curves.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 126 (2), 142-148. 10.1061/(ASCE)0733-9364(2000)126: 2(142)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.2 , pp. 142-148
    • Barraza, G.A.1    Back, W.E.2    Mata, F.3
  • 4
    • 13944254406 scopus 로고    scopus 로고
    • Probabilistic forecasting of project performance using stochastic S curves
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(25)
    • Barraza, G. A., Back, W. E., and Mata, F. (2004). " Probabilistic forecasting of project performance using stochastic S curves.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (1), 25-32. 10.1061/(ASCE)0733-9364(2004)130: 1(25) (Pubitemid 40265402)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 25-32
    • Barraza, G.A.1    Back, W.E.2    Mata, F.3
  • 6
    • 0009956262 scopus 로고    scopus 로고
    • Exact smoothing for stationary and non-stationary time series
    • ZZZZZZ 0169-2070, 10.1016/S0169-2070(99)00030-8
    • Casals, J., Jerez, M., and Sotoca, S. (2000). " Exact smoothing for stationary and non-stationary time series.." Int. J. Forecast. ZZZZZZ 0169-2070, 16 (1), 59-69. 10.1016/S0169-2070(99)00030-8
    • (2000) Int. J. Forecast. , vol.16 , Issue.1 , pp. 59-69
    • Casals, J.1    Jerez, M.2    Sotoca, S.3
  • 8
    • 0001672910 scopus 로고
    • Smoothing and interpolation with the state-space model
    • JSTNAL 0162-1459, 10.2307/2290087
    • de Jong, P. (1989). " Smoothing and interpolation with the state-space model.." J. Am. Stat. Assoc. JSTNAL 0162-1459, 84 (408), 1085-1088. 10.2307/2290087
    • (1989) J. Am. Stat. Assoc. , vol.84 , Issue.408 , pp. 1085-1088
    • De Jong, P.1
  • 13
  • 14
    • 85024429815 scopus 로고
    • A new approach to linear filtering and prediction problems
    • JBAEAI 0021-9223
    • Kalman, R. E. (1960). " A new approach to linear filtering and prediction problems.." J. Basic Eng. JBAEAI 0021-9223, 82 (Series D), 35-45.
    • (1960) J. Basic Eng. , vol.82 , Issue.SERIES D , pp. 35-45
    • Kalman, R.E.1
  • 15
    • 0020748627 scopus 로고
    • Three-point approximations for continuous random variables
    • MSCIAM 0025-1909, 10.1287/mnsc.29.5.595
    • Keefer, D. L., and Bodily, S. E. (1983). " Three-point approximations for continuous random variables.." Manage. Sci. MSCIAM 0025-1909, 29 (5), 595-609. 10.1287/mnsc.29.5.595
    • (1983) Manage. Sci. , vol.29 , Issue.5 , pp. 595-609
    • Keefer, D.L.1    Bodily, S.E.2
  • 18
    • 14544303228 scopus 로고    scopus 로고
    • Probability of project completion using stochastic project scheduling simulation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(310)
    • Lee, D. -E. (2005). " Probability of project completion using stochastic project scheduling simulation.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (3), 310-318. 10.1061/(ASCE)0733-9364(2005)131:3(310) (Pubitemid 40303939)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 310-318
    • Lee, D.-E.1
  • 19
    • 55849130658 scopus 로고    scopus 로고
    • The Measurable News, Summer
    • Lipke, W. H. (2003). " Schedule is different.." The Measurable News, Summer, 31-34.
    • (2003) Schedule Is Different , pp. 31-34
    • Lipke, W.H.1
  • 22
    • 0000446325 scopus 로고
    • Estimating the mean and variance of subjective distributions in PERT and decision analysis
    • MSCIAM 0025-1909, 10.1287/mnsc.21.12.1477
    • Perry, C., and Greig, I. D. (1975). " Estimating the mean and variance of subjective distributions in PERT and decision analysis.." Manage. Sci. MSCIAM 0025-1909, 21 (12), 1477-1480. 10.1287/mnsc.21.12.1477
    • (1975) Manage. Sci. , vol.21 , Issue.12 , pp. 1477-1480
    • Perry, C.1    Greig, I.D.2
  • 24
    • 46549101788 scopus 로고
    • Cost and schedule data analysis and forecasting
    • IPMAEL 0263-7863, 10.1016/0263-7863(85)90042-0
    • Seiler, J. (1985). " Cost and schedule data analysis and forecasting.." Int. J. Proj. Manage. IPMAEL 0263-7863, 3 (1), 45-49. 10.1016/0263-7863(85)90042-0
    • (1985) Int. J. Proj. Manage. , vol.3 , Issue.1 , pp. 45-49
    • Seiler, J.1
  • 25
    • 4143056891 scopus 로고    scopus 로고
    • Sediment concentration and its prediction by perceptron Kalman filtering procedure
    • DOI 10.1061/(ASCE)0733-9429(2004)130:8(816)
    • Sen, Z., Altunkaynak, A., and Ozger, M. (2004). " Sediment concentration and its prediction by perceptron Kalman filtering procedure.." J. Hydraul. Eng. JHEND8 0733-9429, 130 (8), 816-826. 10.1061/(ASCE)0733-9429(2004)130:8(816) (Pubitemid 39102756)
    • (2004) Journal of Hydraulic Engineering , vol.130 , Issue.8 , pp. 816-826
    • Sen, Z.1    Altunkaynak, A.2    Ozger, M.3
  • 26
    • 0027678762 scopus 로고
    • Using schedule variance as the only measure of schedule performance
    • CSTEDM 0274-9696
    • Short, J. W. (1993). " Using schedule variance as the only measure of schedule performance.." Cost Eng. CSTEDM 0274-9696 35 (10), 35-40.
    • (1993) Cost Eng. , vol.35 , Issue.10 , pp. 35-40
    • Short, J.W.1
  • 27
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • IPMAEL 0263-7863, 10.1016/j.ijproman.2005.10.004
    • Vandevoorde, S., and Vanhoucke, M. (2006). " A comparison of different project duration forecasting methods using earned value metrics.." Int. J. Proj. Manage. IPMAEL 0263-7863, 24 (4), 289-302. 10.1016/j.ijproman.2005.10.004
    • (2006) Int. J. Proj. Manage. , vol.24 , Issue.4 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 28
    • 35448944883 scopus 로고    scopus 로고
    • A simulation and evaluation of earned value metrics to forecast the project duration
    • DOI 10.1057/palgrave.jors.2602296, PII 2602296
    • Vanhoucke, M., and Vandevoorde, S. (2007). " A simulation and evaluation of earned value metrics to forecast the project duration.." J. Oper. Res. Soc. ZZZZZZ 0160-5682, 58 (10), 1361-1374. 10.1057/palgrave.jors. 2602296 (Pubitemid 47628410)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.10 , pp. 1361-1374
    • Vanhoucke, M.1    Vandevoorde, S.2
  • 29
    • 42449107843 scopus 로고    scopus 로고
    • Algorithm for real time correction of stream flow concentration based on Kalman filter
    • DOI 10.1061/(ASCE)1084-0699(2008)13:5(290), Methodologies in Hydrologic Modeling
    • Wang, C. -H., and Bai, Y. -L. (2008). " Algorithm for real time correction of stream flow concentration based on Kalman filter.." J. Hydrol. Eng. JHYEFF 1084-0699, 13 (5), 290-296. 10.1061/(ASCE)1084-0699(2008)13: 5(290) (Pubitemid 351566802)
    • (2008) Journal of Hydrologic Engineering , vol.13 , Issue.5 , pp. 290-296
    • Wang, C.-H.1    Bai, Y.-L.2
  • 32
    • 9444236531 scopus 로고    scopus 로고
    • Evaluation of models for forecasting the final cost of a project
    • ZZZZZZ 8756-9728
    • Zwikael, O., Globerson, S., and Raz, T. (2000). " Evaluation of models for forecasting the final cost of a project.." Proj. Manage. J. ZZZZZZ 8756-9728, 31 (1), 53-57.
    • (2000) Proj. Manage. J. , vol.31 , Issue.1 , pp. 53-57
    • Zwikael, O.1    Globerson, S.2    Raz, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.