-
1
-
-
11944251241
-
Log-concave Probability and Its Applications
-
M.Bagnoli,, and T.Bergstrom. 2005. “Log-concave Probability and Its Applications.” Economic Theory 26 (2): 445–469.10.1007/s00199-004-0514-4
-
(2005)
Economic Theory
, vol.26
, Issue.2
, pp. 445-469
-
-
Bagnoli, M.1
Bergstrom, T.2
-
2
-
-
33749650935
-
Coordinating Supply Chains with Simple Pricing Schemes: The Role of Vendor-managed Inventories
-
F.Bernstein,, F.Chen, and A.Federgruen. 2006. “Coordinating Supply Chains with Simple Pricing Schemes: The Role of Vendor-managed Inventories.” Management Science 52 (10): 1483–1492.10.1287/mnsc.1060.0564
-
(2006)
Management Science
, vol.52
, Issue.10
, pp. 1483-1492
-
-
Bernstein, F.1
Chen, F.2
Federgruen, A.3
-
3
-
-
0033902373
-
Stock Replenishment and Shipment Scheduling for Vendor-managed Inventory Systems
-
S.Çetinkaya,, and C.Y.Lee. 2000. “Stock Replenishment and Shipment Scheduling for Vendor-managed Inventory Systems.” Management Science 46 (2): 217–232.10.1287/mnsc.46.2.217.11923
-
(2000)
Management Science
, vol.46
, Issue.2
, pp. 217-232
-
-
Çetinkaya, S.1
Lee, C.Y.2
-
4
-
-
0038112236
-
The Effect of Vendor Managed Inventory (VMI) Dynamics on the Bullwhip Effect in Supply Chains
-
S.M.Disney,, and D.R.Towill. 2003. “The Effect of Vendor Managed Inventory (VMI) Dynamics on the Bullwhip Effect in Supply Chains.” International Journal of Production Economics 85 (2): 199–215.10.1016/S0925-5273(03)00110-5
-
(2003)
International Journal of Production Economics
, vol.85
, Issue.2
, pp. 199-215
-
-
Disney, S.M.1
Towill, D.R.2
-
5
-
-
0037151234
-
A Model for Supply Planning under Lead Time Uncertainty
-
A.Dolgui,, and M.A.Ould-Louly. 2002. “A Model for Supply Planning under Lead Time Uncertainty.” International Journal of Production Economics 78 (2): 145–152.10.1016/S0925-5273(00)00180-8
-
(2002)
International Journal of Production Economics
, vol.78
, Issue.2
, pp. 145-152
-
-
Dolgui, A.1
Ould-Louly, M.A.2
-
6
-
-
36348929265
-
Supply Planning under Uncertainties in MRP Environments: A State of the Art
-
A.Dolgui,, and C.Prodhon. 2007. “Supply Planning under Uncertainties in MRP Environments: A State of the Art.” Annual Reviews in Control 31: 269–279.10.1016/j.arcontrol.2007.02.007
-
(2007)
Annual Reviews in Control
, vol.31
, pp. 269-279
-
-
Dolgui, A.1
Prodhon, C.2
-
7
-
-
84925663559
-
The Impact of Modular Assembly on Supply Chain Efficiency
-
T.J.Feng,, and F.Q.Zhang. 2014. “The Impact of Modular Assembly on Supply Chain Efficiency.” Production and Operations Management 23 (11): 1985–2001.10.1111/poms.2014.23.issue-11
-
(2014)
Production and Operations Management
, vol.23
, Issue.11
, pp. 1985-2001
-
-
Feng, T.J.1
Zhang, F.Q.2
-
8
-
-
67649982773
-
Optimal Component Acquisition for a Single-product, Single-period Assemble-to-order System with Expediting
-
K.Fu,, V.N.Hsu, and C.Y.Lee. 2009. “Optimal Component Acquisition for a Single-product, Single-period Assemble-to-order System with Expediting.” Manufacturing & Service Operations Management 11: 229–236.
-
(2009)
Manufacturing & Service Operations Management
, vol.11
, pp. 229-236
-
-
Fu, K.1
Hsu, V.N.2
Lee, C.Y.3
-
9
-
-
5644241211
-
Revenue-sharing vs. Wholesale-price Contracts in Assembly Systems with Random Demand
-
Y.Gerchak,, and Y.Wang. 2004. “Revenue-sharing vs. Wholesale-price Contracts in Assembly Systems with Random Demand.” Production and Operations Management 13 (1): 23–33.
-
(2004)
Production and Operations Management
, vol.13
, Issue.1
, pp. 23-33
-
-
Gerchak, Y.1
Wang, Y.2
-
10
-
-
0028396352
-
Lot Sizing in Assembly Systems with Random Component Yields
-
Y.Gerchak,, Y.Wang, and C.A.Yano. 1994. “Lot Sizing in Assembly Systems with Random Component Yields.” IIE Transactions 26 (2): 19–24.10.1080/07408179408966592
-
(1994)
IIE Transactions
, vol.26
, Issue.2
, pp. 19-24
-
-
Gerchak, Y.1
Wang, Y.2
Yano, C.A.3
-
11
-
-
61449163342
-
Competition and Cooperation in Decentralized Push and Pull Assembly Systems
-
D.Granot,, and S.Yin. 2008. “Competition and Cooperation in Decentralized Push and Pull Assembly Systems.” Management Science 54 (4): 733–747.10.1287/mnsc.1070.0792
-
(2008)
Management Science
, vol.54
, Issue.4
, pp. 733-747
-
-
Granot, D.1
Yin, S.2
-
12
-
-
0032280498
-
Influencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On-time Delivery
-
J.R.Grout, 1998. “Influencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On-time Delivery.” Decision Sciences 29 (3): 747–764.10.1111/deci.1998.29.issue-3
-
(1998)
Decision Sciences
, vol.29
, Issue.3
, pp. 747-764
-
-
Grout, J.R.1
-
14
-
-
56549101461
-
On Coordinating an Assembly System under Random Yield and Random Demand
-
M.G.Güler,, and T.Bilgiç. 2009. “On Coordinating an Assembly System under Random Yield and Random Demand.” European Journal of Operational Research 196 (1): 342–350.10.1016/j.ejor.2008.03.002
-
(2009)
European Journal of Operational Research
, vol.196
, Issue.1
, pp. 342-350
-
-
Güler, M.G.1
Bilgiç, T.2
-
15
-
-
33750008370
-
Coordination in Decentralized Assembly Systems with Uncertain Component Yields
-
H.Gurnani,, and Y.Gerchak. 2007. “Coordination in Decentralized Assembly Systems with Uncertain Component Yields.” European Journal of Operational Research 176 (3): 1559–1576.10.1016/j.ejor.2005.09.036
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.3
, pp. 1559-1576
-
-
Gurnani, H.1
Gerchak, Y.2
-
16
-
-
84858077078
-
Analysis of Production-inventory System for Deteriorating Items with Demand Disruption
-
Y.He,, and S.Y.Wang. 2012. “Analysis of Production-inventory System for Deteriorating Items with Demand Disruption.” International Journal of Production Research 50 (16): 4580–4592.10.1080/00207543.2011.615351
-
(2012)
International Journal of Production Research
, vol.50
, Issue.16
, pp. 4580-4592
-
-
He, Y.1
Wang, S.Y.2
-
17
-
-
0031109379
-
Quick Response in Manufacturer–retailer Channels
-
A.V.Iyer,, and M.E.Bergen. 1997. “Quick Response in Manufacturer–retailer Channels.” Management Science 43 (4): 559–570.10.1287/mnsc.43.4.559
-
(1997)
Management Science
, vol.43
, Issue.4
, pp. 559-570
-
-
Iyer, A.V.1
Bergen, M.E.2
-
18
-
-
77249111785
-
Supplier Competition in Decentralized Assembly Systems with Price-sensitive and Uncertain Demand
-
L.Jiang,, and Y.Z.Wang. 2010. “Supplier Competition in Decentralized Assembly Systems with Price-sensitive and Uncertain Demand.” Manufacturing and Service Operations Management 12 (1): 93–101.10.1287/msom.1090.0259
-
(2010)
Manufacturing and Service Operations Management
, vol.12
, Issue.1
, pp. 93-101
-
-
Jiang, L.1
Wang, Y.Z.2
-
19
-
-
10444279259
-
Who Should Control Inventory in a Supply Chain?
-
C.Lee,, and W.Chu. 2005. “Who Should Control Inventory in a Supply Chain?” European Journal of Operational Research 164 (1): 158–172.10.1016/j.ejor.2003.11.009
-
(2005)
European Journal of Operational Research
, vol.164
, Issue.1
, pp. 158-172
-
-
Lee, C.1
Chu, W.2
-
20
-
-
34548513313
-
A Note on Channel Performance under Consignment Contract with Revenue Sharing
-
S.Li,, and Z.Hua. 2008. “A Note on Channel Performance under Consignment Contract with Revenue Sharing.” European Journal of Operational Research 184 (2): 793–796.10.1016/j.ejor.2006.11.003
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.2
, pp. 793-796
-
-
Li, S.1
Hua, Z.2
-
21
-
-
79955125444
-
Supply Coordination in Supply Chain under Uncertain Delivery Time and BOM Pay-on-produce Mode
-
(in Chinese)
-
G.Li,, T.Gao, S.H.Ma, and Z.H.Wang. 2011. “Supply Coordination in Supply Chain under Uncertain Delivery Time and BOM Pay-on-produce Mode.” Computer Integrated Manufacturing Systems 17 (2): 369–379. (in Chinese).
-
(2011)
Computer Integrated Manufacturing Systems
, vol.17
, Issue.2
, pp. 369-379
-
-
Li, G.1
Gao, T.2
Ma, S.H.3
Wang, Z.H.4
-
22
-
-
0037146389
-
Generalized Newsboy Model to Compute the Optimal Planned Lead times in Assembly Systems
-
M.A.Ould-Louly,, and A.Dolgui. 2002a. “Generalized Newsboy Model to Compute the Optimal Planned Lead times in Assembly Systems.” International Journal of Production Research 40 (17): 4401–4414.10.1080/00207540210158825
-
(2002)
International Journal of Production Research
, vol.40
, Issue.17
, pp. 4401-4414
-
-
Ould-Louly, M.A.1
Dolgui, A.2
-
25
-
-
67349171899
-
Calculating Safety Stocks for Assembly Systems with Random Component Procurement Lead times: A Branch and Bound Algorithm
-
M.A.Louly,, and A.Dolgui. 2009. “Calculating Safety Stocks for Assembly Systems with Random Component Procurement Lead times: A Branch and Bound Algorithm.” European Journal of Operational Research 199 (3): 723–731.10.1016/j.ejor.2007.11.066
-
(2009)
European Journal of Operational Research
, vol.199
, Issue.3
, pp. 723-731
-
-
Louly, M.A.1
Dolgui, A.2
-
26
-
-
70349448346
-
Consignment Contracting: Who Should Control Inventory in the Supply Chain?
-
J.Ru,, and Y.Wang. 2010. “Consignment Contracting: Who Should Control Inventory in the Supply Chain?” European Journal of Operational Research 201 (3): 760–769.10.1016/j.ejor.2009.04.006
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.3
, pp. 760-769
-
-
Ru, J.1
Wang, Y.2
-
28
-
-
1242309351
-
Channel Performance under Consignment Contract with Revenue Sharing
-
Y.Wang,, L.Jiang, and Z.J.Shen. 2004. “Channel Performance under Consignment Contract with Revenue Sharing.” Management Science 50 (1): 34–47.10.1287/mnsc.1030.0168
-
(2004)
Management Science
, vol.50
, Issue.1
, pp. 34-47
-
-
Wang, Y.1
Jiang, L.2
Shen, Z.J.3
-
29
-
-
0023558979
-
Stochastic Leadtimes in Two-level Assembly Systems
-
C.A.Yano, 1987. Stochastic Leadtimes in Two-level Assembly Systems. IIE Transactions, 19 (4): 371–378.10.1080/07408178708975409
-
(1987)
IIE Transactions
, vol.19
, Issue.4
, pp. 371-378
-
-
Yano, C.A.1
-
30
-
-
0001198301
-
Lot Sizing with Random Yields: A Review
-
C.A.Yano,, and H.L.Lee. 1995. “Lot Sizing with Random Yields: A Review.” Operational Research 43 (2): 331–334.
-
(1995)
Operational Research
, vol.43
, Issue.2
, pp. 331-334
-
-
Yano, C.A.1
Lee, H.L.2
-
31
-
-
33747177064
-
Competition, Cooperation, and Information Sharing in a Two-echelon Assembly System
-
F.Zhang, 2006. “Competition, Cooperation, and Information Sharing in a Two-echelon Assembly System.” Manufacturing and Service Operations Management 8 (3): 273–291.10.1287/msom.1060.0108
-
(2006)
Manufacturing and Service Operations Management
, vol.8
, Issue.3
, pp. 273-291
-
-
Zhang, F.1
|