메뉴 건너뛰기




Volumn 54, Issue 17, 2016, Pages 5029-5044

The implication of vendor inventory liability period in a decentralised assembly system

Author keywords

assembly system; coordination; game theory; vendor inventory liability period

Indexed keywords

ASSEMBLY; GAME THEORY; MANUFACTURE;

EID: 84938824614     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2015.1067374     Document Type: Article
Times cited : (3)

References (31)
  • 1
    • 11944251241 scopus 로고    scopus 로고
    • Log-concave Probability and Its Applications
    • M.Bagnoli,, and T.Bergstrom. 2005. “Log-concave Probability and Its Applications.” Economic Theory 26 (2): 445–469.10.1007/s00199-004-0514-4
    • (2005) Economic Theory , vol.26 , Issue.2 , pp. 445-469
    • Bagnoli, M.1    Bergstrom, T.2
  • 2
    • 33749650935 scopus 로고    scopus 로고
    • Coordinating Supply Chains with Simple Pricing Schemes: The Role of Vendor-managed Inventories
    • F.Bernstein,, F.Chen, and A.Federgruen. 2006. “Coordinating Supply Chains with Simple Pricing Schemes: The Role of Vendor-managed Inventories.” Management Science 52 (10): 1483–1492.10.1287/mnsc.1060.0564
    • (2006) Management Science , vol.52 , Issue.10 , pp. 1483-1492
    • Bernstein, F.1    Chen, F.2    Federgruen, A.3
  • 3
    • 0033902373 scopus 로고    scopus 로고
    • Stock Replenishment and Shipment Scheduling for Vendor-managed Inventory Systems
    • S.Çetinkaya,, and C.Y.Lee. 2000. “Stock Replenishment and Shipment Scheduling for Vendor-managed Inventory Systems.” Management Science 46 (2): 217–232.10.1287/mnsc.46.2.217.11923
    • (2000) Management Science , vol.46 , Issue.2 , pp. 217-232
    • Çetinkaya, S.1    Lee, C.Y.2
  • 4
    • 0038112236 scopus 로고    scopus 로고
    • The Effect of Vendor Managed Inventory (VMI) Dynamics on the Bullwhip Effect in Supply Chains
    • S.M.Disney,, and D.R.Towill. 2003. “The Effect of Vendor Managed Inventory (VMI) Dynamics on the Bullwhip Effect in Supply Chains.” International Journal of Production Economics 85 (2): 199–215.10.1016/S0925-5273(03)00110-5
    • (2003) International Journal of Production Economics , vol.85 , Issue.2 , pp. 199-215
    • Disney, S.M.1    Towill, D.R.2
  • 5
    • 0037151234 scopus 로고    scopus 로고
    • A Model for Supply Planning under Lead Time Uncertainty
    • A.Dolgui,, and M.A.Ould-Louly. 2002. “A Model for Supply Planning under Lead Time Uncertainty.” International Journal of Production Economics 78 (2): 145–152.10.1016/S0925-5273(00)00180-8
    • (2002) International Journal of Production Economics , vol.78 , Issue.2 , pp. 145-152
    • Dolgui, A.1    Ould-Louly, M.A.2
  • 6
    • 36348929265 scopus 로고    scopus 로고
    • Supply Planning under Uncertainties in MRP Environments: A State of the Art
    • A.Dolgui,, and C.Prodhon. 2007. “Supply Planning under Uncertainties in MRP Environments: A State of the Art.” Annual Reviews in Control 31: 269–279.10.1016/j.arcontrol.2007.02.007
    • (2007) Annual Reviews in Control , vol.31 , pp. 269-279
    • Dolgui, A.1    Prodhon, C.2
  • 7
    • 84925663559 scopus 로고    scopus 로고
    • The Impact of Modular Assembly on Supply Chain Efficiency
    • T.J.Feng,, and F.Q.Zhang. 2014. “The Impact of Modular Assembly on Supply Chain Efficiency.” Production and Operations Management 23 (11): 1985–2001.10.1111/poms.2014.23.issue-11
    • (2014) Production and Operations Management , vol.23 , Issue.11 , pp. 1985-2001
    • Feng, T.J.1    Zhang, F.Q.2
  • 8
    • 67649982773 scopus 로고    scopus 로고
    • Optimal Component Acquisition for a Single-product, Single-period Assemble-to-order System with Expediting
    • K.Fu,, V.N.Hsu, and C.Y.Lee. 2009. “Optimal Component Acquisition for a Single-product, Single-period Assemble-to-order System with Expediting.” Manufacturing & Service Operations Management 11: 229–236.
    • (2009) Manufacturing & Service Operations Management , vol.11 , pp. 229-236
    • Fu, K.1    Hsu, V.N.2    Lee, C.Y.3
  • 9
    • 5644241211 scopus 로고    scopus 로고
    • Revenue-sharing vs. Wholesale-price Contracts in Assembly Systems with Random Demand
    • Y.Gerchak,, and Y.Wang. 2004. “Revenue-sharing vs. Wholesale-price Contracts in Assembly Systems with Random Demand.” Production and Operations Management 13 (1): 23–33.
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 23-33
    • Gerchak, Y.1    Wang, Y.2
  • 10
    • 0028396352 scopus 로고
    • Lot Sizing in Assembly Systems with Random Component Yields
    • Y.Gerchak,, Y.Wang, and C.A.Yano. 1994. “Lot Sizing in Assembly Systems with Random Component Yields.” IIE Transactions 26 (2): 19–24.10.1080/07408179408966592
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 11
    • 61449163342 scopus 로고    scopus 로고
    • Competition and Cooperation in Decentralized Push and Pull Assembly Systems
    • D.Granot,, and S.Yin. 2008. “Competition and Cooperation in Decentralized Push and Pull Assembly Systems.” Management Science 54 (4): 733–747.10.1287/mnsc.1070.0792
    • (2008) Management Science , vol.54 , Issue.4 , pp. 733-747
    • Granot, D.1    Yin, S.2
  • 12
    • 0032280498 scopus 로고    scopus 로고
    • Influencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On-time Delivery
    • J.R.Grout, 1998. “Influencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On-time Delivery.” Decision Sciences 29 (3): 747–764.10.1111/deci.1998.29.issue-3
    • (1998) Decision Sciences , vol.29 , Issue.3 , pp. 747-764
    • Grout, J.R.1
  • 13
    • 0030836901 scopus 로고    scopus 로고
    • A Model of Incentive Contracts for Just-in-time Delivery
    • J.R.Grout,, and D.P.Christy. 1996. “A Model of Incentive Contracts for Just-in-time Delivery.” European Journal of Operational Research 96 (1): 139–147.
    • (1996) European Journal of Operational Research , vol.96 , Issue.1 , pp. 139-147
    • Grout, J.R.1    Christy, D.P.2
  • 14
    • 56549101461 scopus 로고    scopus 로고
    • On Coordinating an Assembly System under Random Yield and Random Demand
    • M.G.Güler,, and T.Bilgiç. 2009. “On Coordinating an Assembly System under Random Yield and Random Demand.” European Journal of Operational Research 196 (1): 342–350.10.1016/j.ejor.2008.03.002
    • (2009) European Journal of Operational Research , vol.196 , Issue.1 , pp. 342-350
    • Güler, M.G.1    Bilgiç, T.2
  • 15
    • 33750008370 scopus 로고    scopus 로고
    • Coordination in Decentralized Assembly Systems with Uncertain Component Yields
    • H.Gurnani,, and Y.Gerchak. 2007. “Coordination in Decentralized Assembly Systems with Uncertain Component Yields.” European Journal of Operational Research 176 (3): 1559–1576.10.1016/j.ejor.2005.09.036
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1559-1576
    • Gurnani, H.1    Gerchak, Y.2
  • 16
    • 84858077078 scopus 로고    scopus 로고
    • Analysis of Production-inventory System for Deteriorating Items with Demand Disruption
    • Y.He,, and S.Y.Wang. 2012. “Analysis of Production-inventory System for Deteriorating Items with Demand Disruption.” International Journal of Production Research 50 (16): 4580–4592.10.1080/00207543.2011.615351
    • (2012) International Journal of Production Research , vol.50 , Issue.16 , pp. 4580-4592
    • He, Y.1    Wang, S.Y.2
  • 17
    • 0031109379 scopus 로고    scopus 로고
    • Quick Response in Manufacturer–retailer Channels
    • A.V.Iyer,, and M.E.Bergen. 1997. “Quick Response in Manufacturer–retailer Channels.” Management Science 43 (4): 559–570.10.1287/mnsc.43.4.559
    • (1997) Management Science , vol.43 , Issue.4 , pp. 559-570
    • Iyer, A.V.1    Bergen, M.E.2
  • 18
    • 77249111785 scopus 로고    scopus 로고
    • Supplier Competition in Decentralized Assembly Systems with Price-sensitive and Uncertain Demand
    • L.Jiang,, and Y.Z.Wang. 2010. “Supplier Competition in Decentralized Assembly Systems with Price-sensitive and Uncertain Demand.” Manufacturing and Service Operations Management 12 (1): 93–101.10.1287/msom.1090.0259
    • (2010) Manufacturing and Service Operations Management , vol.12 , Issue.1 , pp. 93-101
    • Jiang, L.1    Wang, Y.Z.2
  • 19
    • 10444279259 scopus 로고    scopus 로고
    • Who Should Control Inventory in a Supply Chain?
    • C.Lee,, and W.Chu. 2005. “Who Should Control Inventory in a Supply Chain?” European Journal of Operational Research 164 (1): 158–172.10.1016/j.ejor.2003.11.009
    • (2005) European Journal of Operational Research , vol.164 , Issue.1 , pp. 158-172
    • Lee, C.1    Chu, W.2
  • 20
    • 34548513313 scopus 로고    scopus 로고
    • A Note on Channel Performance under Consignment Contract with Revenue Sharing
    • S.Li,, and Z.Hua. 2008. “A Note on Channel Performance under Consignment Contract with Revenue Sharing.” European Journal of Operational Research 184 (2): 793–796.10.1016/j.ejor.2006.11.003
    • (2008) European Journal of Operational Research , vol.184 , Issue.2 , pp. 793-796
    • Li, S.1    Hua, Z.2
  • 21
    • 79955125444 scopus 로고    scopus 로고
    • Supply Coordination in Supply Chain under Uncertain Delivery Time and BOM Pay-on-produce Mode
    • (in Chinese)
    • G.Li,, T.Gao, S.H.Ma, and Z.H.Wang. 2011. “Supply Coordination in Supply Chain under Uncertain Delivery Time and BOM Pay-on-produce Mode.” Computer Integrated Manufacturing Systems 17 (2): 369–379. (in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.2 , pp. 369-379
    • Li, G.1    Gao, T.2    Ma, S.H.3    Wang, Z.H.4
  • 22
    • 0037146389 scopus 로고    scopus 로고
    • Generalized Newsboy Model to Compute the Optimal Planned Lead times in Assembly Systems
    • M.A.Ould-Louly,, and A.Dolgui. 2002a. “Generalized Newsboy Model to Compute the Optimal Planned Lead times in Assembly Systems.” International Journal of Production Research 40 (17): 4401–4414.10.1080/00207540210158825
    • (2002) International Journal of Production Research , vol.40 , Issue.17 , pp. 4401-4414
    • Ould-Louly, M.A.1    Dolgui, A.2
  • 24
    • 2942631360 scopus 로고    scopus 로고
    • The MPS Parameterization under Lead Time Uncertainty
    • M.A.Ould-Louly,, and A.Dolgui. 2004. “The MPS Parameterization under Lead Time Uncertainty.” International Journal of Production Economics 90 (3): 369–376.10.1016/j.ijpe.2003.08.008
    • (2004) International Journal of Production Economics , vol.90 , Issue.3 , pp. 369-376
    • Ould-Louly, M.A.1    Dolgui, A.2
  • 25
    • 67349171899 scopus 로고    scopus 로고
    • Calculating Safety Stocks for Assembly Systems with Random Component Procurement Lead times: A Branch and Bound Algorithm
    • M.A.Louly,, and A.Dolgui. 2009. “Calculating Safety Stocks for Assembly Systems with Random Component Procurement Lead times: A Branch and Bound Algorithm.” European Journal of Operational Research 199 (3): 723–731.10.1016/j.ejor.2007.11.066
    • (2009) European Journal of Operational Research , vol.199 , Issue.3 , pp. 723-731
    • Louly, M.A.1    Dolgui, A.2
  • 26
    • 70349448346 scopus 로고    scopus 로고
    • Consignment Contracting: Who Should Control Inventory in the Supply Chain?
    • J.Ru,, and Y.Wang. 2010. “Consignment Contracting: Who Should Control Inventory in the Supply Chain?” European Journal of Operational Research 201 (3): 760–769.10.1016/j.ejor.2009.04.006
    • (2010) European Journal of Operational Research , vol.201 , Issue.3 , pp. 760-769
    • Ru, J.1    Wang, Y.2
  • 27
    • 0345548370 scopus 로고    scopus 로고
    • Capacity Games in Assembly Systems with Uncertain Demand
    • Y.Wang,, and Y.Gerchak. 2003. “Capacity Games in Assembly Systems with Uncertain Demand.” Manufacturing & Service Operations Management 5 (3): 252–267.
    • (2003) Manufacturing & Service Operations Management , vol.5 , Issue.3 , pp. 252-267
    • Wang, Y.1    Gerchak, Y.2
  • 28
    • 1242309351 scopus 로고    scopus 로고
    • Channel Performance under Consignment Contract with Revenue Sharing
    • Y.Wang,, L.Jiang, and Z.J.Shen. 2004. “Channel Performance under Consignment Contract with Revenue Sharing.” Management Science 50 (1): 34–47.10.1287/mnsc.1030.0168
    • (2004) Management Science , vol.50 , Issue.1 , pp. 34-47
    • Wang, Y.1    Jiang, L.2    Shen, Z.J.3
  • 29
    • 0023558979 scopus 로고
    • Stochastic Leadtimes in Two-level Assembly Systems
    • C.A.Yano, 1987. Stochastic Leadtimes in Two-level Assembly Systems. IIE Transactions, 19 (4): 371–378.10.1080/07408178708975409
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 371-378
    • Yano, C.A.1
  • 30
    • 0001198301 scopus 로고
    • Lot Sizing with Random Yields: A Review
    • C.A.Yano,, and H.L.Lee. 1995. “Lot Sizing with Random Yields: A Review.” Operational Research 43 (2): 331–334.
    • (1995) Operational Research , vol.43 , Issue.2 , pp. 331-334
    • Yano, C.A.1    Lee, H.L.2
  • 31
    • 33747177064 scopus 로고    scopus 로고
    • Competition, Cooperation, and Information Sharing in a Two-echelon Assembly System
    • F.Zhang, 2006. “Competition, Cooperation, and Information Sharing in a Two-echelon Assembly System.” Manufacturing and Service Operations Management 8 (3): 273–291.10.1287/msom.1060.0108
    • (2006) Manufacturing and Service Operations Management , vol.8 , Issue.3 , pp. 273-291
    • Zhang, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.