메뉴 건너뛰기




Volumn 2014-October, Issue October, 2014, Pages 309-318

The ROSACE case study: From Simulink specification to multi/many-core execution

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER ENGINEERS; FLIGHT CONTROLLERS; MATLAB /SIMULINK; OPEN SOURCE LICENSE; OPEN SOURCES; PERIODIC CONFIGURATION; SIMULINK;

EID: 84937561882     PISSN: 10801812     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/RTAS.2014.6926012     Document Type: Conference Paper
Times cited : (66)

References (43)
  • 7
    • 84870565920 scopus 로고    scopus 로고
    • Real-time i/o management system with COTS peripherals
    • E. Betti, S. Bak, R. Pellizzoni, M. Caccamo, and L. Sha, "Real-time i/o management system with COTS peripherals," IEEE Trans. Computers, vol. 62, no. 1, pp. 45-58, 2013.
    • (2013) IEEE Trans. Computers , vol.62 , Issue.1 , pp. 45-58
    • Betti, E.1    Bak, S.2    Pellizzoni, R.3    Caccamo, M.4    Sha, L.5
  • 10
    • 0001761076 scopus 로고    scopus 로고
    • Research on gain-scheduling
    • W. J. Rugh and J. S. Shamma, "Research on gain-scheduling," Automatica, vol. 36, no. 10, pp. 1401-1425, 2000.
    • (2000) Automatica , vol.36 , Issue.10 , pp. 1401-1425
    • Rugh, W.J.1    Shamma, J.S.2
  • 16
    • 0026221661 scopus 로고
    • The synchronous data-flow programming language LUSTRE
    • N. Halbwachs, P. Caspi, P. Raymond, and D. Pilaud, "The synchronous data-flow programming language LUSTRE," Proceedings of the IEEE, vol. 79, no. 9, pp. 1305-1320, 1991.
    • (1991) Proceedings of the IEEE , vol.79 , Issue.9 , pp. 1305-1320
    • Halbwachs, N.1    Caspi, P.2    Raymond, P.3    Pilaud, D.4
  • 23
    • 43949126892 scopus 로고    scopus 로고
    • The worst-case execution-time problem - Overview of methods and survey of tools
    • R. Wilhelm and al., "The worst-case execution-time problem - overview of methods and survey of tools," ACM Trans. Embedded Comput. Syst., vol. 7, no. 3, 2008.
    • (2008) ACM Trans. Embedded Comput. Syst. , vol.7 , Issue.3
    • Wilhelm, R.1
  • 25
    • 84857392612 scopus 로고    scopus 로고
    • Deterministic execution model on cots hardware
    • 25th International Conference Architecture of Computing Systems (ARCS'12), ser. Springer
    • F. Boniol, H. Cassé, E. Noulard, and C. Pagetti, "Deterministic execution model on cots hardware," in25th International Conference Architecture of Computing Systems (ARCS'12), ser. Lecture Notes in Computer Science, vol. 7179. Springer, 2012, pp. 98-110.
    • (2012) Lecture Notes in Computer Science , vol.7179 , pp. 98-110
    • Boniol, F.1    Cassé, H.2    Noulard, E.3    Pagetti, C.4
  • 26
    • 0344794029 scopus 로고    scopus 로고
    • Ph.D. dissertation, Dept. of Automatic Control, Lund University, Sweden, Apr.
    • A. Cervin, "Integrated control and real-time scheduling," Ph.D. dissertation, Dept. of Automatic Control, Lund University, Sweden, Apr. 2003.
    • (2003) Integrated Control and Real-time Scheduling
    • Cervin, A.1
  • 39
    • 84937609544 scopus 로고    scopus 로고
    • From model-based to real-time execution of safety-critical applications: Coupling scade with oasis
    • S. Bliudze, M. Jan, and X. Fornari, "From model-based to real-time execution of safety-critical applications: Coupling scade with oasis," in Embedded Real Time Software and Systems (ERTS'012), 2012.
    • (2012) Embedded Real Time Software and Systems (ERTS'012)
    • Bliudze, S.1    Jan, M.2    Fornari, X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.