Volumn 33, Issue 3, 2015, Pages 537-548

Social responsibility of major infrastructure projects in China

Author keywords

Major infrastructure projects; Project life cycle; Social responsibility; Stakeholders

Indexed keywords

LIFE CYCLE; PLANNING; SUSTAINABLE DEVELOPMENT;

EID: 84922615547     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2014.07.007     Document Type: Article
Times cited : (199)

References (113)
  • 1
    • 34547322177 scopus 로고    scopus 로고
    • Putting the S back in CSR: a multi-level theory of social change in organizations
    • Aguilera R.V., Rupp D., Williams C., Ganapathi J. Putting the S back in CSR: a multi-level theory of social change in organizations. Acad. Manag. Rev. 2007, 32(3):836-863.
    • (2007) Acad. Manag. Rev. , vol.32 , Issue.3 , pp. 836-863
    • Aguilera, R.V.1    Rupp, D.2    Williams, C.3    Ganapathi, J.4
  • 2
    • 84861659260 scopus 로고    scopus 로고
    • What we know and don't know about corporate social responsibility: a review and research agenda
    • Aguinis H., Glavas A. What we know and don't know about corporate social responsibility: a review and research agenda. J. Manag. 2012, 38(4):932-968.
    • (2012) J. Manag. , vol.38 , Issue.4 , pp. 932-968
    • Aguinis, H.1    Glavas, A.2
  • 4
    • 84989054539 scopus 로고
    • The emerging paradigm of strategic behavior
    • Ansoff H.I. The emerging paradigm of strategic behavior. Strateg. Manag. J. 1987, 8(6):501-515.
    • (1987) Strateg. Manag. J. , vol.8 , Issue.6 , pp. 501-515
    • Ansoff, H.I.1
  • 6
    • 45249127754 scopus 로고
    • Is public expenditure productive?
    • Aschauer D.A. Is public expenditure productive?. J. Monet. Econ. 1989, 23(2):177-200.
    • (1989) J. Monet. Econ. , vol.23 , Issue.2 , pp. 177-200
    • Aschauer, D.A.1
  • 7
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria. Int. J. Proj. Manag. 1999, 17(6):337-342.
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 8
    • 0030212023 scopus 로고    scopus 로고
    • The concept of project complexity: a review
    • Baccarini D. The concept of project complexity: a review. Int. J. Proj. Manag. 1996, 14(4):201-204.
    • (1996) Int. J. Proj. Manag. , vol.14 , Issue.4 , pp. 201-204
    • Baccarini, D.1
  • 9
    • 0008712080 scopus 로고    scopus 로고
    • Capture and governance at local and national levels
    • Bardhan P., Mookherjee D. Capture and governance at local and national levels. Am. Econ. Rev. 2000, 90(2):135-139.
    • (2000) Am. Econ. Rev. , vol.90 , Issue.2 , pp. 135-139
    • Bardhan, P.1    Mookherjee, D.2
  • 10
    • 34547340020 scopus 로고    scopus 로고
    • Stakeholder influence capacity and the variability of financial returns to corporate social responsibility
    • Barnett M. Stakeholder influence capacity and the variability of financial returns to corporate social responsibility. Acad. Manag. Rev. 2007, 32(3):794-816.
    • (2007) Acad. Manag. Rev. , vol.32 , Issue.3 , pp. 794-816
    • Barnett, M.1
  • 11
    • 80052087034 scopus 로고    scopus 로고
    • International integration and regional inequalities: how important is national infrastructure?
    • Behrens K. International integration and regional inequalities: how important is national infrastructure?. Manch. Sch. 2011, 79(5):952-971.
    • (2011) Manch. Sch. , vol.79 , Issue.5 , pp. 952-971
    • Behrens, K.1
  • 12
    • 79960062818 scopus 로고    scopus 로고
    • Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework
    • Bosch-Rekveldt M., Jongkind Y., Mooi H., Bakker H., Verbraeck A. Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework. Int. J. Proj. Manag. 2011, 29(6):728-739.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.6 , pp. 728-739
    • Bosch-Rekveldt, M.1    Jongkind, Y.2    Mooi, H.3    Bakker, H.4    Verbraeck, A.5
  • 14
    • 0037407706 scopus 로고    scopus 로고
    • Proactive environmental strategies: a stakeholder management perspective
    • Buysse K., Verbeke A. Proactive environmental strategies: a stakeholder management perspective. Strateg. Manag. J. 2003, 24(5):453-470.
    • (2003) Strateg. Manag. J. , vol.24 , Issue.5 , pp. 453-470
    • Buysse, K.1    Verbeke, A.2
  • 15
    • 34547436187 scopus 로고    scopus 로고
    • Why would corporations behave in socially responsible ways? An institutional theory of corporate social responsibility
    • Campbell J.L. Why would corporations behave in socially responsible ways? An institutional theory of corporate social responsibility. Acad. Manag. Rev. 2007, 32(3):946-967.
    • (2007) Acad. Manag. Rev. , vol.32 , Issue.3 , pp. 946-967
    • Campbell, J.L.1
  • 17
    • 44949275678 scopus 로고
    • The pyramid of corporate social responsibility: toward the moral management of organizational stakeholders
    • Carroll A.B. The pyramid of corporate social responsibility: toward the moral management of organizational stakeholders. Bus. Horiz. 1991, 34(4):39-48.
    • (1991) Bus. Horiz. , vol.34 , Issue.4 , pp. 39-48
    • Carroll, A.B.1
  • 18
    • 0000908020 scopus 로고    scopus 로고
    • Corporate social responsibility: evolution of a definitional construct
    • Carroll A.B. Corporate social responsibility: evolution of a definitional construct. Bus. Soc. 1999, 38(3):268-295.
    • (1999) Bus. Soc. , vol.38 , Issue.3 , pp. 268-295
    • Carroll, A.B.1
  • 19
    • 83355170194 scopus 로고
    • Involuntary resettlement and development: some projects have adverse social effects. Can these be prevented?
    • Cernea M. Involuntary resettlement and development: some projects have adverse social effects. Can these be prevented?. Financ. Dev. 1988, 3:44-46.
    • (1988) Financ. Dev. , vol.3 , pp. 44-46
    • Cernea, M.1
  • 20
    • 0348251726 scopus 로고
    • Corporate governance: lessons from abroad
    • Charkham J. Corporate governance: lessons from abroad. Eur. Bus. J. 1992, 4:8-16.
    • (1992) Eur. Bus. J. , vol.4 , pp. 8-16
    • Charkham, J.1
  • 21
    • 84891816921 scopus 로고    scopus 로고
    • Chinese infrastructure: the big picture
    • Chen Y., Matzinger S., Woetzel Chinese infrastructure: the big picture. McKinsey Q. 2013, 3:8-15.
    • (2013) McKinsey Q. , vol.3 , pp. 8-15
    • Chen, Y.1    Matzinger, S.2    Woetzel3
  • 22
    • 21844434254 scopus 로고
    • A stakeholder framework for analyzing and evaluating corporate social performance
    • Clarkson M. A stakeholder framework for analyzing and evaluating corporate social performance. Acad. Manag. Rev. 1995, 20(1):92-117.
    • (1995) Acad. Manag. Rev. , vol.20 , Issue.1 , pp. 92-117
    • Clarkson, M.1
  • 23
    • 38949123673 scopus 로고    scopus 로고
    • How corporate social responsibility is defined: an analysis of 37 definitions
    • Dahlsrud A. How corporate social responsibility is defined: an analysis of 37 definitions. Corp. Soc. Responsib. Environ. Manag. 2008, 15(1):1-13.
    • (2008) Corp. Soc. Responsib. Environ. Manag. , vol.15 , Issue.1 , pp. 1-13
    • Dahlsrud, A.1
  • 24
    • 77955048152 scopus 로고    scopus 로고
    • Adopting proactive environmental strategy: the influence of stakeholders and firm size
    • Darnall N., Henriques I., Sadorsky P. Adopting proactive environmental strategy: the influence of stakeholders and firm size. J. Manag. Stud. 2010, 47:1072-1094.
    • (2010) J. Manag. Stud. , vol.47 , pp. 1072-1094
    • Darnall, N.1    Henriques, I.2    Sadorsky, P.3
  • 26
    • 0033915763 scopus 로고    scopus 로고
    • Intertemporal output and employment effects of public infrastructure capital: evidence from 12 OECD economies
    • Demetriades P.O., Mamuneas T.P. Intertemporal output and employment effects of public infrastructure capital: evidence from 12 OECD economies. Econ. J. 2000, 110:687-712.
    • (2000) Econ. J. , vol.110 , pp. 687-712
    • Demetriades, P.O.1    Mamuneas, T.P.2
  • 27
    • 0038405075 scopus 로고    scopus 로고
    • Institutions, infrastructure, and economic growth
    • Esfahani H.S., Ramirez M.T. Institutions, infrastructure, and economic growth. J. Dev. Econ. 2003, 70:443-477.
    • (2003) J. Dev. Econ. , vol.70 , pp. 443-477
    • Esfahani, H.S.1    Ramirez, M.T.2
  • 28
    • 2942593707 scopus 로고    scopus 로고
    • Infrastructure and regional economic development in rural China
    • Fan S., Zhang X. Infrastructure and regional economic development in rural China. China Econ. Rev. 2004, 15:203-214.
    • (2004) China Econ. Rev. , vol.15 , pp. 203-214
    • Fan, S.1    Zhang, X.2
  • 29
    • 13944270659 scopus 로고    scopus 로고
    • Benchmarking studies on construction safety management in China
    • Fang D.P., Huang X.Y., Hinze J. Benchmarking studies on construction safety management in China. J. Constr. Eng. Manag. 2004, 130(3):424-432.
    • (2004) J. Constr. Eng. Manag. , vol.130 , Issue.3 , pp. 424-432
    • Fang, D.P.1    Huang, X.Y.2    Hinze, J.3
  • 30
    • 0001244207 scopus 로고    scopus 로고
    • Road to prosperity? Assessing the link between public capital and productivity
    • Fernald G.J. Road to prosperity? Assessing the link between public capital and productivity. Am. Econ. Rev. 1999, 89(3):619-638.
    • (1999) Am. Econ. Rev. , vol.89 , Issue.3 , pp. 619-638
    • Fernald, G.J.1
  • 32
    • 0031068905 scopus 로고    scopus 로고
    • Gender, age, and ethnicity in immigration for an Australian nation
    • Fincher R. Gender, age, and ethnicity in immigration for an Australian nation. Environ. Plan. A 1997, 1997(29):217-236.
    • (1997) Environ. Plan. A , vol.1997 , Issue.29 , pp. 217-236
    • Fincher, R.1
  • 34
    • 84925010888 scopus 로고    scopus 로고
    • Over budget, over time, over and over again: managing major projects
    • Oxford University Press
    • Flyvbjerg B. Over budget, over time, over and over again: managing major projects. The Oxford Handbook of Project Management 2011, 321-344. Oxford University Press. 10.1093/oxfordhb/9780199563142.003.0014.
    • (2011) The Oxford Handbook of Project Management , pp. 321-344
    • Flyvbjerg, B.1
  • 35
    • 84898737377 scopus 로고    scopus 로고
    • What you should know about megaprojects and why: an overview
    • Flyvbjerg B. What you should know about megaprojects and why: an overview. Proj. Manag. J. 2014, 45(2):6-19.
    • (2014) Proj. Manag. J. , vol.45 , Issue.2 , pp. 6-19
    • Flyvbjerg, B.1
  • 36
    • 65249165995 scopus 로고    scopus 로고
    • Delusion and deception in large infrastructure projects: two models for explaining and preventing executive disaster
    • Flyvbjerg B., Massimo G., Lovallo D. Delusion and deception in large infrastructure projects: two models for explaining and preventing executive disaster. Calif. Manag. Rev. 2009, 51(2):170-193.
    • (2009) Calif. Manag. Rev. , vol.51 , Issue.2 , pp. 170-193
    • Flyvbjerg, B.1    Massimo, G.2    Lovallo, D.3
  • 37
    • 84976913348 scopus 로고
    • From CSR1 to CSR2: the maturing of Business-and-Society thought
    • Frederick W.C. From CSR1 to CSR2: the maturing of Business-and-Society thought. Bus. Soc. 1994, 33(2):150-164.
    • (1994) Bus. Soc. , vol.33 , Issue.2 , pp. 150-164
    • Frederick, W.C.1
  • 39
    • 4444355245 scopus 로고    scopus 로고
    • Corporate social responsibility theories: mapping the territory
    • Garriga E., Mele D. Corporate social responsibility theories: mapping the territory. J. Bus. Ethics 2004, 53:57-71.
    • (2004) J. Bus. Ethics , vol.53 , pp. 57-71
    • Garriga, E.1    Mele, D.2
  • 40
    • 71049132184 scopus 로고    scopus 로고
    • Patterns of complexity: the thermometer of complexity
    • Geraldi J.G. Patterns of complexity: the thermometer of complexity. Proj. Perspect. 2008, 29:4-9.
    • (2008) Proj. Perspect. , vol.29 , pp. 4-9
    • Geraldi, J.G.1
  • 41
    • 77449145606 scopus 로고    scopus 로고
    • Unfolding roles and identities of professionals in construction projects: exploring the informality of practices
    • Gluch P. Unfolding roles and identities of professionals in construction projects: exploring the informality of practices. Constr. Manag. Econ. 2009, 27(10):959-968.
    • (2009) Constr. Manag. Econ. , vol.27 , Issue.10 , pp. 959-968
    • Gluch, P.1
  • 42
    • 62149102169 scopus 로고    scopus 로고
    • Infrastructure design issues in disaster-prone regions
    • Guikema S.D. Infrastructure design issues in disaster-prone regions. Science 2009, 323:1302-1303.
    • (2009) Science , vol.323 , pp. 1302-1303
    • Guikema, S.D.1
  • 43
    • 0033247290 scopus 로고    scopus 로고
    • Stakeholders, social responsibility and performance: empirical evidence and theoretical perspectives
    • Harrison J., Freeman R. Stakeholders, social responsibility and performance: empirical evidence and theoretical perspectives. Acad. Manag. J. 1999, 42(5):479-485.
    • (1999) Acad. Manag. J. , vol.42 , Issue.5 , pp. 479-485
    • Harrison, J.1    Freeman, R.2
  • 44
    • 77957233028 scopus 로고    scopus 로고
    • Drivers of environmental disclosure and stakeholder expectation: evidence from Taiwan
    • Huang C.L., Kung F.H. Drivers of environmental disclosure and stakeholder expectation: evidence from Taiwan. J. Bus. Ethics 2010, 96:435-451.
    • (2010) J. Bus. Ethics , vol.96 , pp. 435-451
    • Huang, C.L.1    Kung, F.H.2
  • 45
    • 33745713897 scopus 로고    scopus 로고
    • Infrastructure, externalities, and economic development: a study of the Indian manufacturing industry
    • Hulten C.R., Bennathan E., Srinivasan S. Infrastructure, externalities, and economic development: a study of the Indian manufacturing industry. World Bank Econ. Rev. 2006, 20(2):291-308.
    • (2006) World Bank Econ. Rev. , vol.20 , Issue.2 , pp. 291-308
    • Hulten, C.R.1    Bennathan, E.2    Srinivasan, S.3
  • 46
    • 70449421278 scopus 로고    scopus 로고
    • The International Organization for Standardization, Geneva, Switzerland
    • ISO ISO 26000: Guidance on Social Responsibility 2006, The International Organization for Standardization, Geneva, Switzerland.
    • (2006) ISO 26000: Guidance on Social Responsibility
  • 47
    • 0347301565 scopus 로고    scopus 로고
    • Using indicators to measure sustainability performance at a corporate and project level
    • Keeble J.J., Topiol S., Berkeley S. Using indicators to measure sustainability performance at a corporate and project level. J. Bus. Ethics 2003, 44:149-158.
    • (2003) J. Bus. Ethics , vol.44 , pp. 149-158
    • Keeble, J.J.1    Topiol, S.2    Berkeley, S.3
  • 48
    • 61349145619 scopus 로고    scopus 로고
    • Measuring corruption in infrastructure: evidence from transition and developing countries
    • Kenny C. Measuring corruption in infrastructure: evidence from transition and developing countries. J. Dev. Stud. 2009, 45(3):314-332.
    • (2009) J. Dev. Stud. , vol.45 , Issue.3 , pp. 314-332
    • Kenny, C.1
  • 49
    • 79961115157 scopus 로고    scopus 로고
    • Can national infrastructure spending reduce local unemployment? Evidence from an Australian roads program
    • Leigh A., Neill C. Can national infrastructure spending reduce local unemployment? Evidence from an Australian roads program. Econ. Lett. 2011, 113(2):150-153.
    • (2011) Econ. Lett. , vol.113 , Issue.2 , pp. 150-153
    • Leigh, A.1    Neill, C.2
  • 50
    • 34547914897 scopus 로고    scopus 로고
    • CEM research for the next 50years: maximizing economic, environmental, and societal value of the built environment
    • Levitt R.E. CEM research for the next 50years: maximizing economic, environmental, and societal value of the built environment. J. Constr. Eng. Manag. 2007, 133(9):619-628.
    • (2007) J. Constr. Eng. Manag. , vol.133 , Issue.9 , pp. 619-628
    • Levitt, R.E.1
  • 51
    • 33746614748 scopus 로고    scopus 로고
    • Overview of Dujiangyan irrigation scheme of ancient China with current theory
    • Li K.K., Xu Z.F. Overview of Dujiangyan irrigation scheme of ancient China with current theory. Irrig. Drain. 2006, 55(3):291-298.
    • (2006) Irrig. Drain. , vol.55 , Issue.3 , pp. 291-298
    • Li, K.K.1    Xu, Z.F.2
  • 52
    • 77957666389 scopus 로고    scopus 로고
    • Corporate social responsibility, ownership structure and political interference: evidence from China
    • Li W.J., Zhang R. Corporate social responsibility, ownership structure and political interference: evidence from China. J. Bus. Ethics 2010, 96(4):631-645.
    • (2010) J. Bus. Ethics , vol.96 , Issue.4 , pp. 631-645
    • Li, W.J.1    Zhang, R.2
  • 53
    • 84867310436 scopus 로고    scopus 로고
    • Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: a fuzzy approach
    • Li T.T.Y., Ng S.T., Skitmore M. Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: a fuzzy approach. Autom. Constr. 2013, 29:123-135.
    • (2013) Autom. Constr. , vol.29 , pp. 123-135
    • Li, T.T.Y.1    Ng, S.T.2    Skitmore, M.3
  • 54
    • 21744434245 scopus 로고    scopus 로고
    • China's environment in a globalizing world
    • Liu J., Diamond J. China's environment in a globalizing world. Nature 2005, 435:1179-1186.
    • (2005) Nature , vol.435 , pp. 1179-1186
    • Liu, J.1    Diamond, J.2
  • 55
    • 36549044877 scopus 로고    scopus 로고
    • Strategic thinking on IGCC development in China
    • Liu H.W., Ni W.D., Li Z., Ma L.W. Strategic thinking on IGCC development in China. Energy Policy 2008, 36(1):1-11.
    • (2008) Energy Policy , vol.36 , Issue.1 , pp. 1-11
    • Liu, H.W.1    Ni, W.D.2    Li, Z.3    Ma, L.W.4
  • 56
    • 33645167569 scopus 로고    scopus 로고
    • Corporate social responsibility in management research: focus, nature, salience and sources of influence
    • Lockett A., Moon J., Visser W. Corporate social responsibility in management research: focus, nature, salience and sources of influence. J. Manag. Stud. 2006, 43(1):115-136.
    • (2006) J. Manag. Stud. , vol.43 , Issue.1 , pp. 115-136
    • Lockett, A.1    Moon, J.2    Visser, W.3
  • 59
    • 70450222914 scopus 로고    scopus 로고
    • Prevention through design: the effect of European directives on construction workplace accidents
    • Martínez Aires M.D., Rubio Gámez M.C., Gibb A. Prevention through design: the effect of European directives on construction workplace accidents. Saf. Sci. 2010, 48(2):248-258.
    • (2010) Saf. Sci. , vol.48 , Issue.2 , pp. 248-258
    • Martínez Aires, M.D.1    Rubio Gámez, M.C.2    Gibb, A.3
  • 60
    • 42249115214 scopus 로고    scopus 로고
    • "Implicit" and "explicit" CSR: a conceptual framework for a comparative understanding of corporate social responsibility
    • Matten D., Moon J. "Implicit" and "explicit" CSR: a conceptual framework for a comparative understanding of corporate social responsibility. Acad. Manag. Rev. 2008, 33(2):404-424.
    • (2008) Acad. Manag. Rev. , vol.33 , Issue.2 , pp. 404-424
    • Matten, D.1    Moon, J.2
  • 61
    • 0004267822 scopus 로고    scopus 로고
    • FT Prentice Hall, Harlow
    • Maylor H. Project Management 2003, FT Prentice Hall, Harlow. 3rd edition.
    • (2003) Project Management
    • Maylor, H.1
  • 63
    • 0035529262 scopus 로고    scopus 로고
    • Corporate social responsibility: a theory of the firm perspective
    • McWilliams A., Siegel D. Corporate social responsibility: a theory of the firm perspective. Acad. Manag. J. 2001, 26(1):117-127.
    • (2001) Acad. Manag. J. , vol.26 , Issue.1 , pp. 117-127
    • McWilliams, A.1    Siegel, D.2
  • 64
    • 51849119875 scopus 로고    scopus 로고
    • Governance regimes for large complex projects
    • Miller R., Hobbs B. Governance regimes for large complex projects. Proj. Manag. J. 2005, 36(3):42-50.
    • (2005) Proj. Manag. J. , vol.36 , Issue.3 , pp. 42-50
    • Miller, R.1    Hobbs, B.2
  • 66
    • 77954860558 scopus 로고    scopus 로고
    • CSR in China research: salience, focus and nature
    • Moon J., Shen X. CSR in China research: salience, focus and nature. J. Bus. Ethics 2010, 94(4):613-629.
    • (2010) J. Bus. Ethics , vol.94 , Issue.4 , pp. 613-629
    • Moon, J.1    Shen, X.2
  • 67
    • 0030418723 scopus 로고    scopus 로고
    • State infrastructure and productive performance
    • Morrison C.J., Schwartz A.E. State infrastructure and productive performance. Am. Econ. Rev. 1992, 86(5):1095-1111.
    • (1992) Am. Econ. Rev. , vol.86 , Issue.5 , pp. 1095-1111
    • Morrison, C.J.1    Schwartz, A.E.2
  • 68
    • 0030418723 scopus 로고    scopus 로고
    • State infrastructure and productive performance
    • Morrison C.J., Schwartz A.E. State infrastructure and productive performance. Am. Econ. Rev. 1996, 86(5):1095-1111.
    • (1996) Am. Econ. Rev. , vol.86 , Issue.5 , pp. 1095-1111
    • Morrison, C.J.1    Schwartz, A.E.2
  • 69
    • 0026501823 scopus 로고
    • Infrastructure investment and economic growth
    • Munnell A.H. Infrastructure investment and economic growth. J. Econ. Perspect. 1992, 6(4):189-198.
    • (1992) J. Econ. Perspect. , vol.6 , Issue.4 , pp. 189-198
    • Munnell, A.H.1
  • 70
    • 0030123663 scopus 로고    scopus 로고
    • The role of project management in achieving project success
    • Munns A.K., Bjeirmi B.F. The role of project management in achieving project success. Int. J. Proj. Manag. 1996, 14(2):81-87.
    • (1996) Int. J. Proj. Manag. , vol.14 , Issue.2 , pp. 81-87
    • Munns, A.K.1    Bjeirmi, B.F.2
  • 72
    • 84875220877 scopus 로고    scopus 로고
    • A public private people partnerships (P4) process framework for infrastructure development in Hong Kong
    • Ng S.T., Wong J.M.W., Wong K.K.W. A public private people partnerships (P4) process framework for infrastructure development in Hong Kong. Cities 2013, 31:370-381.
    • (2013) Cities , vol.31 , pp. 370-381
    • Ng, S.T.1    Wong, J.M.W.2    Wong, K.K.W.3
  • 73
    • 44849136148 scopus 로고    scopus 로고
    • A methodology for CSR reporting: assuring a representative diversity of indicators across stakeholders, scales, sites and performance issues
    • O'Connor M., Spangenberg J.H. A methodology for CSR reporting: assuring a representative diversity of indicators across stakeholders, scales, sites and performance issues. J. Clean. Prod. 2008, 16(13):1399-1415.
    • (2008) J. Clean. Prod. , vol.16 , Issue.13 , pp. 1399-1415
    • O'Connor, M.1    Spangenberg, J.H.2
  • 74
    • 0030673659 scopus 로고    scopus 로고
    • The influence of institutional and task environment relationships on organizational performance: the Canadian construction industry
    • Oliver C. The influence of institutional and task environment relationships on organizational performance: the Canadian construction industry. J. Manag. Stud. 1997, 34(1):99-124.
    • (1997) J. Manag. Stud. , vol.34 , Issue.1 , pp. 99-124
    • Oliver, C.1
  • 75
    • 38949091229 scopus 로고    scopus 로고
    • Office for Official Publications of the European Communities, Luxembourg
    • OSHA Fourth European Working Conditions Survey, 2007 2007, Office for Official Publications of the European Communities, Luxembourg.
    • (2007) Fourth European Working Conditions Survey, 2007
  • 76
    • 0842264193 scopus 로고    scopus 로고
    • Engineering complex systems
    • Ottino J.M. Engineering complex systems. Nature 2004, 427:399-399.
    • (2004) Nature , vol.427 , pp. 399-399
    • Ottino, J.M.1
  • 77
    • 0018049624 scopus 로고
    • Engineering limitations of fusion power plants
    • Parkins W.E. Engineering limitations of fusion power plants. Science 1978, 199(31):1403-1408.
    • (1978) Science , vol.199 , Issue.31 , pp. 1403-1408
    • Parkins, W.E.1
  • 78
    • 84870745311 scopus 로고    scopus 로고
    • Relational competence in complex temporary organizations: the case of a French hospital construction project network
    • Pauget B., Wald A. Relational competence in complex temporary organizations: the case of a French hospital construction project network. Int. J. Proj. Manag. 2013, 31(2):200-211.
    • (2013) Int. J. Proj. Manag. , vol.31 , Issue.2 , pp. 200-211
    • Pauget, B.1    Wald, A.2
  • 81
    • 84862089122 scopus 로고    scopus 로고
    • Novelty and technical complexity: critical constructs in capital projects
    • Puddicombe M.S. Novelty and technical complexity: critical constructs in capital projects. J. Constr. Eng. Manag. 2012, 138(5):613-620.
    • (2012) J. Constr. Eng. Manag. , vol.138 , Issue.5 , pp. 613-620
    • Puddicombe, M.S.1
  • 82
    • 77955552927 scopus 로고    scopus 로고
    • The drivers for contractors' green innovation: an industry perspective
    • Qi G.Y., Shen L.Y., Zeng S.X., Jorge Ochoa J. The drivers for contractors' green innovation: an industry perspective. J. Clean. Prod. 2010, 18(14):1358-1365.
    • (2010) J. Clean. Prod. , vol.18 , Issue.14 , pp. 1358-1365
    • Qi, G.Y.1    Shen, L.Y.2    Zeng, S.X.3    Jorge, O.J.4
  • 83
    • 34848878111 scopus 로고    scopus 로고
    • Riding on the roof of the world
    • Qiu J. Riding on the roof of the world. Nature 2007, 449:398-402.
    • (2007) Nature , vol.449 , pp. 398-402
    • Qiu, J.1
  • 85
    • 84858876012 scopus 로고    scopus 로고
    • Investments toward sustainable development
    • Sachs J.D., Reid W.V. Investments toward sustainable development. Science 2006, 312:1002.
    • (2006) Science , vol.312 , pp. 1002
    • Sachs, J.D.1    Reid, W.V.2
  • 86
    • 82955232985 scopus 로고    scopus 로고
    • Thoughts on the evaluation of corporate social performance through projects
    • Salazar J., Husted B.W., Biehl M. Thoughts on the evaluation of corporate social performance through projects. J. Bus. Ethics 2012, 105(2):175-186.
    • (2012) J. Bus. Ethics , vol.105 , Issue.2 , pp. 175-186
    • Salazar, J.1    Husted, B.W.2    Biehl, M.3
  • 87
    • 77949505834 scopus 로고    scopus 로고
    • To Cope With Complexity and Changes in Projects by Radical Redefining of PM: The Project Management 2nd Order (PM-2)
    • Saynisch M. To Cope With Complexity and Changes in Projects by Radical Redefining of PM: The Project Management 2nd Order (PM-2). 22 and IPMA World Congress 2008.
    • (2008) 22 and IPMA World Congress
    • Saynisch, M.1
  • 88
    • 79953196589 scopus 로고    scopus 로고
    • The new political role of business in a globalized word: a review of a new perspective on CSR and its implications for the firm, governance and democracy
    • Scherer A.G., Palazzo G. The new political role of business in a globalized word: a review of a new perspective on CSR and its implications for the firm, governance and democracy. J. Manag. Stud. 2011, 48(4):899-931.
    • (2011) J. Manag. Stud. , vol.48 , Issue.4 , pp. 899-931
    • Scherer, A.G.1    Palazzo, G.2
  • 89
    • 0344065112 scopus 로고    scopus 로고
    • Corporate social responsibility: a three-domain approach
    • Schwartz M.S., Carroll A.B. Corporate social responsibility: a three-domain approach. Bus. Ethics Q. 2003, 13(4):503-530.
    • (2003) Bus. Ethics Q. , vol.13 , Issue.4 , pp. 503-530
    • Schwartz, M.S.1    Carroll, A.B.2
  • 90
    • 84875025525 scopus 로고    scopus 로고
    • Relationships between project complexity and communication
    • Senescu R.R., Aranda-Mena G., Haymaker J.R. Relationships between project complexity and communication. J. Manag. Eng. 2012, 29(2):183-197.
    • (2012) J. Manag. Eng. , vol.29 , Issue.2 , pp. 183-197
    • Senescu, R.R.1    Aranda-Mena, G.2    Haymaker, J.R.3
  • 91
    • 0000338846 scopus 로고
    • A moral basis for corporate philanthropy
    • Shaw B., Post F.R. A moral basis for corporate philanthropy. J. Bus. Ethics 1993, 12(10):745-751.
    • (1993) J. Bus. Ethics , vol.12 , Issue.10 , pp. 745-751
    • Shaw, B.1    Post, F.R.2
  • 92
    • 2342433674 scopus 로고    scopus 로고
    • Three Gorges Project: chance and challenge
    • Shen G.Z., Xie Z.Q. Three Gorges Project: chance and challenge. Science 2004, 304:681-681.
    • (2004) Science , vol.304 , pp. 681-681
    • Shen, G.Z.1    Xie, Z.Q.2
  • 93
    • 84155163885 scopus 로고    scopus 로고
    • Critical indicators for assessing the contribution of infrastructure projects to coordinated urban-rural development in China
    • Shen L.Y., Jiang S.J., Yuan H.P. Critical indicators for assessing the contribution of infrastructure projects to coordinated urban-rural development in China. Habitat Int. 2011, 36(2):237-246.
    • (2011) Habitat Int. , vol.36 , Issue.2 , pp. 237-246
    • Shen, L.Y.1    Jiang, S.J.2    Yuan, H.P.3
  • 94
    • 79959386360 scopus 로고    scopus 로고
    • Key assessment indicators (KAIs) for the sustainability of infrastructure projects
    • Shen L.Y., Wu Y.Z., Zhang X.L. Key assessment indicators (KAIs) for the sustainability of infrastructure projects. J. Constr. Eng. Manag. 2011, 137(6):441-451.
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.6 , pp. 441-451
    • Shen, L.Y.1    Wu, Y.Z.2    Zhang, X.L.3
  • 95
    • 49749117148 scopus 로고    scopus 로고
    • Accountability to prevent corruption in construction projects
    • Sohail M., Cavill S. Accountability to prevent corruption in construction projects. J. Constr. Eng. Manag. 2008, 134:729-738.
    • (2008) J. Constr. Eng. Manag. , vol.134 , pp. 729-738
    • Sohail, M.1    Cavill, S.2
  • 96
    • 84875014496 scopus 로고    scopus 로고
    • Hybrid approach to the study of inter-organization high performance teams
    • Solis F., Sinfield J.V., Abraham D.M. Hybrid approach to the study of inter-organization high performance teams. J. Constr. Eng. Manag. 2013, 139(4):379-392.
    • (2013) J. Constr. Eng. Manag. , vol.139 , Issue.4 , pp. 379-392
    • Solis, F.1    Sinfield, J.V.2    Abraham, D.M.3
  • 97
    • 48749111347 scopus 로고    scopus 로고
    • Three Gorges Dam: into the unknown
    • Stone R. Three Gorges Dam: into the unknown. Science 2008, 321:628-632.
    • (2008) Science , vol.321 , pp. 628-632
    • Stone, R.1
  • 98
    • 79958724203 scopus 로고    scopus 로고
    • Infrastructure and development: a critical appraisal of the macro-level literature
    • Straub S. Infrastructure and development: a critical appraisal of the macro-level literature. J. Dev. Stud. 2011, 47(5):683-708.
    • (2011) J. Dev. Stud. , vol.47 , Issue.5 , pp. 683-708
    • Straub, S.1
  • 99
    • 3342969222 scopus 로고    scopus 로고
    • Green construction assessment for environment in the construction industry of Hong Kong
    • Tam C.M., Tam V.W., Tsui W.S. Green construction assessment for environment in the construction industry of Hong Kong. Int. J. Proj. Manag. 2004, 22:563-571.
    • (2004) Int. J. Proj. Manag. , vol.22 , pp. 563-571
    • Tam, C.M.1    Tam, V.W.2    Tsui, W.S.3
  • 100
    • 26444456576 scopus 로고    scopus 로고
    • Environmental performance measurement indicators in construction
    • Tam V.W.Y., Tam C.M., Zeng S.X., Chan K.K. Environmental performance measurement indicators in construction. Build. Environ. 2006, 41(2):164-173.
    • (2006) Build. Environ. , vol.41 , Issue.2 , pp. 164-173
    • Tam, V.W.Y.1    Tam, C.M.2    Zeng, S.X.3    Chan, K.K.4
  • 101
    • 34548595240 scopus 로고    scopus 로고
    • Recent development in project-based organizations
    • Thiry M., Deguire M. Recent development in project-based organizations. Int. J. Proj. Manag. 2007, 25:649-658.
    • (2007) Int. J. Proj. Manag. , vol.25 , pp. 649-658
    • Thiry, M.1    Deguire, M.2
  • 102
    • 51349136241 scopus 로고    scopus 로고
    • Understanding project complexity: implications on project management
    • Vidal L.A., Marle F. Understanding project complexity: implications on project management. Kybernetes 2008, 37:1094-1110.
    • (2008) Kybernetes , vol.37 , pp. 1094-1110
    • Vidal, L.A.1    Marle, F.2
  • 103
    • 77956629198 scopus 로고    scopus 로고
    • Critical success factors for on-site sorting of construction waste: a China study
    • Wang J., Yuan H., Kang X., Lu W. Critical success factors for on-site sorting of construction waste: a China study. Resour. Conserv. Recycl. 2010, 54(11):931-936.
    • (2010) Resour. Conserv. Recycl. , vol.54 , Issue.11 , pp. 931-936
    • Wang, J.1    Yuan, H.2    Kang, X.3    Lu, W.4
  • 104
    • 0141467166 scopus 로고    scopus 로고
    • Disaster mitigation: the concept of vulnerability revisited
    • Weichselgartner J. Disaster mitigation: the concept of vulnerability revisited. Disaster Prev. Manag. 2001, 10(2):85-95.
    • (2001) Disaster Prev. Manag. , vol.10 , Issue.2 , pp. 85-95
    • Weichselgartner, J.1
  • 106
    • 33750933500 scopus 로고    scopus 로고
    • Directions for future research in project management: the main findings of a UK government-funded research network
    • Winter M., Smith C., Morris P. Directions for future research in project management: the main findings of a UK government-funded research network. Int. J. Proj. Manag. 2006, 24(8):638-649.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.8 , pp. 638-649
    • Winter, M.1    Smith, C.2    Morris, P.3
  • 107
    • 0037799216 scopus 로고    scopus 로고
    • Three Gorges Dam: experiment in habitat fragmentation?
    • Wu J.G., Huang J.H., Han X.G., Xie Z.Q., Gao X.M. Three Gorges Dam: experiment in habitat fragmentation?. Science 2003, 300:1239-1240.
    • (2003) Science , vol.300 , pp. 1239-1240
    • Wu, J.G.1    Huang, J.H.2    Han, X.G.3    Xie, Z.Q.4    Gao, X.M.5
  • 108
    • 4243137230 scopus 로고    scopus 로고
    • Grasping the complexity of IS development projects
    • Xia W., Lee G. Grasping the complexity of IS development projects. Commun. ACM 2004, 47(5):69-74.
    • (2004) Commun. ACM , vol.47 , Issue.5 , pp. 69-74
    • Xia, W.1    Lee, G.2
  • 109
    • 77951979191 scopus 로고    scopus 로고
    • Indigenous characteristics of Chinese corporate social responsibility conceptual paradigm
    • Xu S., Yang R. Indigenous characteristics of Chinese corporate social responsibility conceptual paradigm. J. Bus. Ethics 2010, 93(2):321-333.
    • (2010) J. Bus. Ethics , vol.93 , Issue.2 , pp. 321-333
    • Xu, S.1    Yang, R.2
  • 111
    • 14744282033 scopus 로고    scopus 로고
    • ISO 14000 and the construction industry: survey in China
    • Zeng S.X., Tam C.M., Deng Z.M., Tam V.W.Y. ISO 14000 and the construction industry: survey in China. J. Manag. Eng. 2003, 19(3):107-115.
    • (2003) J. Manag. Eng. , vol.19 , Issue.3 , pp. 107-115
    • Zeng, S.X.1    Tam, C.M.2    Deng, Z.M.3    Tam, V.W.Y.4
  • 112
    • 84862817700 scopus 로고    scopus 로고
    • A corporate social responsibility indicator system for construction enterprises
    • Zhao Z.Y., Zhao X.J., Davidson K., Zuo J. A corporate social responsibility indicator system for construction enterprises. J. Clean. Prod. 2012, 29:277-289.
    • (2012) J. Clean. Prod. , vol.29 , pp. 277-289
    • Zhao, Z.Y.1    Zhao, X.J.2    Davidson, K.3    Zuo, J.4
  • 113
    • 84875832570 scopus 로고    scopus 로고
    • China's bullet trains facilitate market integration and mitigate the cost of megacity growth
    • Zheng S., Kahn M.E. China's bullet trains facilitate market integration and mitigate the cost of megacity growth. Proc. Natl. Acad. Sci. 2013, 110(14):1248-1253.
    • (2013) Proc. Natl. Acad. Sci. , vol.110 , Issue.14 , pp. 1248-1253
    • Zheng, S.1    Kahn, M.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.