메뉴 건너뛰기




Volumn , Issue , 2015, Pages 85-90

Dynamic maintenance scheduling for power systems incorporating hurricane effects

Author keywords

Asset management; grid resiliency; hurricane planning; power infrastructure; preventive maintenance; stochastic dynamic programming

Indexed keywords

ASSET MANAGEMENT; DETERIORATION; DYNAMIC PROGRAMMING; ELECTRIC POWER TRANSMISSION NETWORKS; HURRICANE EFFECTS; INTEGER PROGRAMMING; OUTAGES; SCHEDULING; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 84922422563     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SmartGridComm.2014.7007627     Document Type: Conference Paper
Times cited : (15)

References (15)
  • 1
    • 75949084718 scopus 로고    scopus 로고
    • Performance assessment of topologically diverse power systems subjected to hurricane events
    • Apr.
    • J. Winkler, L. Duenas-Osorio, R. Stein, and D. Subramanian, "Performance assessment of topologically diverse power systems subjected to hurricane events," Reliability Engineering & System Safety, vol. 95, no. 4, pp. 323-336, Apr. 2010.
    • (2010) Reliability Engineering & System Safety , vol.95 , Issue.4 , pp. 323-336
    • Winkler, J.1    Duenas-Osorio, L.2    Stein, R.3    Subramanian, D.4
  • 2
    • 0032597596 scopus 로고    scopus 로고
    • Short-Term transmission line maintenance scheduling in a deregulated system
    • Santa Clara, CA, Jul.
    • M. K. C. Marwali and S. M. Shahidehpour, "Short-Term transmission line maintenance scheduling in a deregulated system,", in Proc. of Power Indu. Comp. Appl. Conf., Santa Clara, CA, Jul. 1999.
    • (1999) Proc. of Power Indu. Comp. Appl. Conf.
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 3
    • 0037505510 scopus 로고    scopus 로고
    • A new game-Theoretic framework for maintenance strategy analysis
    • May
    • J. H. Kim, J. B. Park, J. K. Park, and B. H. Kim, "A new game-Theoretic framework for maintenance strategy analysis," Power Systems, IEEE Transactions on, vol. 18, no. 2, pp. 698-706, May 2003.
    • (2003) Power Systems, IEEE Transactions on , vol.18 , Issue.2 , pp. 698-706
    • Kim, J.H.1    Park, J.B.2    Park, J.K.3    Kim, B.H.4
  • 4
    • 34548036523 scopus 로고    scopus 로고
    • Security-constrained optimal coordination of generation and transmission maintenance outage scheduling
    • Aug.
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained optimal coordination of generation and transmission maintenance outage scheduling," Power Systems, IEEE Transactions on, vol. 22, no. 3, pp. 1302-1313, Aug. 2007.
    • (2007) Power Systems, IEEE Transactions on , vol.22 , Issue.3 , pp. 1302-1313
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 5
    • 70350268064 scopus 로고    scopus 로고
    • An efficient mixed-integer linear formulation for long-Term overhead lines maintenance scheduling in power distribution systems
    • Oct.
    • A. Abiri-Jahromi, M. Fotuhi-Firuzabad, and E. Abbasi, "An efficient mixed-integer linear formulation for long-Term overhead lines maintenance scheduling in power distribution systems," Power Delivery, IEEE Transactions on, vol. 24, no. 4, pp. 2043-2053, Oct. 2009.
    • (2009) Power Delivery, IEEE Transactions on , vol.24 , Issue.4 , pp. 2043-2053
    • Abiri-Jahromi, A.1    Fotuhi-Firuzabad, M.2    Abbasi, E.3
  • 6
    • 77954834803 scopus 로고    scopus 로고
    • Security-constrained generation and transmission outage scheduling with uncertainties
    • Aug.
    • L. Wu, M. Shahidehpour, and Y. Fu, "Security-constrained generation and transmission outage scheduling with uncertainties," Power Systems, IEEE Transactions on, vol. 25, no. 3, pp. 1674-1685, Aug. 2010.
    • (2010) Power Systems, IEEE Transactions on , vol.25 , Issue.3 , pp. 1674-1685
    • Wu, L.1    Shahidehpour, M.2    Fu, Y.3
  • 7
    • 84856275377 scopus 로고    scopus 로고
    • Yearly maintenance scheduling of transmission lines within a market environment
    • Feb.
    • H. Pandzic, A. J. Conejo, I. Kuzle, and E. Caro, "Yearly maintenance scheduling of transmission lines within a market environment," Power Systems, IEEE Transactions on, vol. 27, no. 1, pp. 407-415, Feb. 2012.
    • (2012) Power Systems, IEEE Transactions on , vol.27 , Issue.1 , pp. 407-415
    • Pandzic, H.1    Conejo, A.J.2    Kuzle, I.3    Caro, E.4
  • 8
    • 84875682872 scopus 로고    scopus 로고
    • A comprehensive scheme for reliability centered maintenance in power distribution systems-Part I: Methodology
    • Apr.
    • P. Dehghanian, M. Fotuhi-Firuzabad, F. Aminifar, and R. Billinton, "A comprehensive scheme for reliability centered maintenance in power distribution systems-Part I: Methodology," Power Delivery, IEEE Transactions on, vol. 28, no. 2, pp. 761-769, Apr. 2013.
    • (2013) Power Delivery, IEEE Transactions on , vol.28 , Issue.2 , pp. 761-769
    • Dehghanian, P.1    Fotuhi-Firuzabad, M.2    Aminifar, F.3    Billinton, R.4
  • 9
    • 84875658768 scopus 로고    scopus 로고
    • A comprehensive scheme for reliability centered maintenance in power distribution systems-Part II: Numerical analysis
    • Apr.
    • P. Dehghanian, M. Fotuhi-Firuzabad, F. Aminifar, and R. Billinton, "A comprehensive scheme for reliability centered maintenance in power distribution systems-Part II: numerical analysis," Power Delivery, IEEE Transactions on, vol. 28, no. 2, pp. 771, Apr. 2013.
    • (2013) Power Delivery, IEEE Transactions on , vol.28 , Issue.2 , pp. 771
    • Dehghanian, P.1    Fotuhi-Firuzabad, M.2    Aminifar, F.3    Billinton, R.4
  • 10
    • 84886446353 scopus 로고    scopus 로고
    • A two-stage framework for power transformer asset maintenance management-Part I: Models and formulations
    • May
    • A. Abiri-Jahromi, M. Parvania, F. Bouffard, and M. Fotuhi-Firuzabad, "A two-stage framework for power transformer asset maintenance management-Part I: Models and formulations," Power Systems, IEEE Transactions on, vol. 28, no. 2, pp. 1404-1414, May 2013.
    • (2013) Power Systems, IEEE Transactions on , vol.28 , Issue.2 , pp. 1404-1414
    • Abiri-Jahromi, A.1    Parvania, M.2    Bouffard, F.3    Fotuhi-Firuzabad, M.4
  • 11
    • 84886446353 scopus 로고    scopus 로고
    • A two-stage framework for power transformer asset maintenance management-Part II: Validation results
    • May
    • A. Abiri-Jahromi, M. Parvania, F. Bouffard, and M. Fotuhi-Firuzabad, "A two-stage framework for power transformer asset maintenance management-Part II: Validation results," Power Systems, IEEE Transactions on, vol. 28, no. 2, pp. 1395-1403, May 2013.
    • (2013) Power Systems, IEEE Transactions on , vol.28 , Issue.2 , pp. 1395-1403
    • Abiri-Jahromi, A.1    Parvania, M.2    Bouffard, F.3    Fotuhi-Firuzabad, M.4
  • 12
    • 0032682344 scopus 로고    scopus 로고
    • Teaching distribution system reliability evaluation using Monte Carlo simulation
    • May
    • R. Billinton and P. Wang, "Teaching distribution system reliability evaluation using Monte Carlo simulation," Power Systems, IEEE Transactions on, vol. 14, no. 2, pp. 397-403, May 1999.
    • (1999) Power Systems, IEEE Transactions on , vol.14 , Issue.2 , pp. 397-403
    • Billinton, R.1    Wang, P.2
  • 13
    • 33644785046 scopus 로고    scopus 로고
    • Doubly periodic non-homogeneous Poisson models for hurricane data
    • Mar.
    • Y. Lu and J. Garrido, "Doubly periodic non-homogeneous Poisson models for hurricane data," Statistical Methodology, vol. 2, no. 1, pp. 17-35, Mar. 2005.
    • (2005) Statistical Methodology , vol.2 , Issue.1 , pp. 17-35
    • Lu, Y.1    Garrido, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.