-
1
-
-
85141468055
-
-
and Digital Entertainment. Autodesk http://www.autodesk.com/, retrieved on May
-
Autodesk. 2009. 2D and 3D Design and Engineering Software for Architecture, Manufacturing, and Digital Entertainment. Autodesk http://www.autodesk.com/, retrieved on May 18, 2009.
-
(2009)
2D and 3D Design and Engineering Software for Architecture, Manufacturing
, vol.18
, pp. 2009
-
-
-
3
-
-
0034937996
-
An application of internet based project management system
-
Deng, Z.M., Li, H., Tam, C.M., Shen, Q.P. and Love, P.E.D. 2001. An application of internet based project management system, Automation in Construction, 10 (2001), 239-246.
-
(2001)
Automation in Construction
, vol.10
, pp. 239-246
-
-
Deng, Z.M.1
Li, H.2
Tam, C.M.3
Shen, Q.P.4
Love, P.E.D.5
-
5
-
-
85141455117
-
Life Cycle Management of Construction Projects Based on Virtual Prototyping Technologies, in Proc. of 12th Inter. Conf. on Comp
-
Beijing, China, Tsinghua University Press
-
Guo, H., Heng, L., Li, Y and Huang, T. 2008. Life Cycle Management of Construction Projects Based on Virtual Prototyping Technologies, in Proc. of 12th Inter. Conf. on Comp, in Civil and Building Eng. October 16-18, 2008, Beijing, China, Tsinghua University Press.
-
(2008)
Civil and Building Eng. October 16-18
, pp. 2008
-
-
Guo, H.1
Heng, L.2
Li, Y.3
Huang, T.4
-
6
-
-
85141510426
-
Construction Process Simulation and Safety Analysis Based on Building Information Modeling and 4D Technology, in Proc. of 12th Inter. Conf. on Comp
-
Beijing, China, Tsinghua University Press
-
Hu, Z., Zhang, J. and Deng, Z. 2008. Construction Process Simulation and Safety Analysis Based on Building Information Modeling and 4D Technology, in Proc. of 12th Inter. Conf. on Comp. in Civil and Building Eng. October 16-18, 2008, Beijing, China, Tsinghua University Press.
-
(2008)
Civil and Building Eng. October 16-18
, pp. 2008
-
-
Hu, Z.1
Zhang, J.2
Deng, Z.3
-
7
-
-
34547788324
-
A formal indentification and re-sequencing process for developing sequencing alternatives in CPM schedules
-
Koo, B., Fischer, M. and Kunz, J. 2007. A formal indentification and re-sequencing process for developing sequencing alternatives in CPM schedules. Automation in Construction, 17 (2007), 75-89.
-
(2007)
Automation in Construction
, vol.17
, pp. 75-89
-
-
Koo, B.1
Fischer, M.2
Kunz, J.3
-
8
-
-
85141528558
-
Evaluating Building Information Modeling Requirements for Trade Coordination at the Dickinson School of Law, in Proc. of 12th Inter. Conf. on Comp
-
Beijing, China, Tsinghua University Press
-
Leicht, R.M., Dubler, G.R. and Messner, J.I. 2008. Evaluating Building Information Modeling Requirements for Trade Coordination at the Dickinson School of Law, in Proc. of 12th Inter. Conf. on Comp. in Civil and Building Eng. October 16-18, 2008, Beijing, China, Tsinghua University Press.
-
(2008)
Civil and Building Eng. October 16-18
, pp. 2008
-
-
Leicht, R.M.1
Dubler, G.R.2
Messner, J.I.3
-
9
-
-
85141468343
-
Using Virtual Prototyping for Implementation of a Virtual Construction Environment (VCE)
-
Ed: Leonardo Rischmoller, Santiago, Chile
-
Lucas, J., Thabet, W. and Bowman, D. 2008. Using Virtual Prototyping for Implementation of a Virtual Construction Environment (VCE), in Improving the Management of Construction Projects Through IT Adoption: CIB W78 25th Inter. Conf. on Information Technology. Ed: Leonardo Rischmoller, Santiago, Chile: 271-279.
-
(2008)
Improving the Management of Construction Projects through IT Adoption: CIB W78 25Th Inter. Conf. on Information Technology
, pp. 271-279
-
-
Lucas, J.1
Thabet, W.2
Bowman, D.3
-
11
-
-
14644389944
-
An Ontology for Relating Features with Activities to Calculate Costs. J. of Comp
-
Staub-French, S., Fischer, M., Kunz, J. and Paulson, B. 2003. An Ontology for Relating Features with Activities to Calculate Costs. J. of Comp. in Civ. Eng., 17 (2003), 243-354.
-
(2003)
Civ. Eng.
, vol.17
, pp. 243-354
-
-
Staub-French, S.1
Fischer, M.2
Kunz, J.3
Paulson, B.4
-
12
-
-
73949126742
-
Building Information Modeling (BIM): Transforming Design and Construction to Achieve Greater Industry Productivity
-
Young, N., Jones, S., and Bernstein, H. 2008. Building Information Modeling (BIM): Transforming Design and Construction to Achieve Greater Industry Productivity. McGraw Hill Construction.
-
(2008)
Mcgraw Hill Construction
-
-
Young, N.1
Jones, S.2
Bernstein, H.3
-
13
-
-
85141470287
-
Developing a BIM System to Support Measurement of Work in Progress, in Proc. of 12th Inter. Conf. on Comp
-
Beijing, China, Tsinghua University Press
-
Zhang, X., Bakis, N., Kagioglou, M., Aouad, G., Lukins, T. and Ibrahim, Y. 2008. Developing a BIM System to Support Measurement of Work in Progress, in Proc. of 12th Inter. Conf. on Comp. in Civil and Building Eng. October 16-18, 2008. Beijing, China, Tsinghua University Press.
-
(2008)
Civil and Building Eng. October 16-18
, pp. 2008
-
-
Zhang, X.1
Bakis, N.2
Kagioglou, M.3
Aouad, G.4
Lukins, T.5
Ibrahim, Y.6
|