-
2
-
-
0041694822
-
-
Dept. of Surveying and Information Technology Institute, Univ. of Salford, Salford, Greater Manchester, U.K.
-
Aouad, G., Betts, M., Brandon, P., Brown, F., Child, T., Cooper, G., Ford, S., Kirkham, J., Oxma, R., Sarshar, M., and Young, B. (1994). ICON: Integration of Construction Information, Dept. of Surveying and Information Technology Institute, Univ. of Salford, Salford, Greater Manchester, U.K.
-
(1994)
ICON: Integration of Construction Information
-
-
Aouad, G.1
Betts, M.2
Brandon, P.3
Brown, F.4
Child, T.5
Cooper, G.6
Ford, S.7
Kirkham, J.8
Oxma, R.9
Sarshar, M.10
Young, B.11
-
3
-
-
0041359088
-
The charrette test method
-
Center for Integrated Facility Engineering, Stanford, Calif.
-
Clayton, M. J., Kunz, J. C., and Fischer, M. A. (1998). "The charrette test method." Technical Rep. No. 120, Center for Integrated Facility Engineering, Stanford, Calif.
-
(1998)
Technical Rep. No. 120
, vol.120
-
-
Clayton, M.J.1
Kunz, J.C.2
Fischer, M.A.3
-
5
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions and resources
-
Darwiche, A., Levitt, R., and Hayes-Roth, B. (1989). "OARPLAN: Generating project plans by reasoning about objects, actions and resources. "AIEDAM, 2(3), 169-181.
-
(1989)
AIEDAM
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.2
Hayes-Roth, B.3
-
6
-
-
0004312731
-
Constructibility input to preliminary design of reinforced concrete structures
-
Center for Integrated Facility Engineering, Stanford, Calif.
-
Fischer, M. (1991). "Constructibility input to preliminary design of reinforced concrete structures." Technical Rep. No. 64, Center for Integrated Facility Engineering, Stanford, Calif.
-
(1991)
Technical Rep. No. 64
, vol.64
-
-
Fischer, M.1
-
7
-
-
0029706255
-
Project modeling in construction applications
-
ASCE, New York
-
Froese, T., Yu, K., and Shahid, S. (1996). "Project modeling in construction applications." Computing in civil engineering, ASCE, New York, 572-578.
-
(1996)
Computing in Civil Engineering
, pp. 572-578
-
-
Froese, T.1
Yu, K.2
Shahid, S.3
-
8
-
-
0025415079
-
Interactive vertical formwork selection
-
Hanna, A. S., and Sanvido, V. E. (1990). "Interactive vertical formwork selection." Concr. Int.: Des. Constr., 12(4), 26-32.
-
(1990)
Concr. Int.: Des. Constr.
, vol.12
, Issue.4
, pp. 26-32
-
-
Hanna, A.S.1
Sanvido, V.E.2
-
9
-
-
0344669175
-
-
International Alliance of Interoperability (IAI). (2001). IFC 2x extension modeling guide, 〈http://www.iai.org.uk〉.
-
(2001)
IFC 2x Extension Modeling Guide
-
-
-
10
-
-
0028517808
-
MDA planner: Interactive planning tool using product models and construction methods
-
Jägbeck, A. (1994). "MDA planner: Interactive planning tool using product models and construction methods." J. Comput. Civ. Eng., 8(4), 536-554.
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.4
, pp. 536-554
-
-
Jägbeck, A.1
-
12
-
-
0026382438
-
Factors affecting masonrylabor productivity
-
Sanders, S. R., and Thomas, H. R. (1991). "Factors affecting masonrylabor productivity." J. Constr. Eng. Manage., 117(4), 626-644.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.4
, pp. 626-644
-
-
Sanders, S.R.1
Thomas, H.R.2
-
13
-
-
0027545630
-
Factors influencing formwork productivity
-
Smith, G. R., and Hanna, A. S. (1993). "Factors influencing formwork productivity." Can. J. Civ. Eng., 20(1), 144-153.
-
(1993)
Can. J. Civ. Eng.
, vol.20
, Issue.1
, pp. 144-153
-
-
Smith, G.R.1
Hanna, A.S.2
-
15
-
-
0042861949
-
Industrial case study of electronic design, cost, and schedule integration
-
Center for Integrated Facility Engineering, Stanford, Calif.
-
Staub-French, S., and Fischer, M. (2001). "Industrial case study of electronic design, cost, and schedule integration." Technical Rep. No. 122, Center for Integrated Facility Engineering, Stanford, Calif.
-
(2001)
Technical Rep. No. 122
, vol.122
-
-
Staub-French, S.1
Fischer, M.2
-
16
-
-
0345356232
-
A feature ontology to support construction cost estimating
-
in press
-
Staub-French, S., Fischer, M., Kunz, J., Ishii, K., and Paulson, B. (2003). "A feature ontology to support construction cost estimating." Artif. Intell. Eng. Design, Anal. Manuf. (AIEDAM), in press.
-
(2003)
Artif. Intell. Eng. Design, Anal. Manuf. (AIEDAM)
-
-
Staub-French, S.1
Fischer, M.2
Kunz, J.3
Ishii, K.4
Paulson, B.5
-
17
-
-
0030195306
-
Object-oriented model for integrating construction product and process information
-
Stumpf, A., Ganeshan, R., Chin, S., and Liu, L. (1996). "Object-oriented model for integrating construction product and process information." J. Comput. Civ. Eng., 10(3), 204-212.
-
(1996)
J. Comput. Civ. Eng.
, vol.10
, Issue.3
, pp. 204-212
-
-
Stumpf, A.1
Ganeshan, R.2
Chin, S.3
Liu, L.4
-
18
-
-
0344240116
-
Construction baseline productivity: Theory and practice
-
Thomas, H. R., and Zavrski, I. (1999). "Construction baseline productivity: Theory and practice." J. Constr. Eng. Manage., 125(5), 295-303.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 295-303
-
-
Thomas, H.R.1
Zavrski, I.2
-
20
-
-
0041359108
-
Reasoning about construction methods
-
K. D. Walsh, ed., ASCE, Reston, Va.
-
Udaipurwala, A., and Russell, A. D. (2000). "Reasoning about construction methods." Construction Congress VI, K. D. Walsh, ed., ASCE, Reston, Va., 386-395.
-
(2000)
Construction Congress VI
, pp. 386-395
-
-
Udaipurwala, A.1
Russell, A.D.2
|