메뉴 건너뛰기




Volumn 17, Issue 4, 2003, Pages 243-254

An ontology for relating features with activities to calculate costs

Author keywords

Artificial intelligence; Building design; Computer models; Construction costs; Cost estimates; Information management

Indexed keywords

BUILDING DESIGN; COMPUTER MODELS; CONSTRUCTION COSTS; COST ESTIMATES; ONTOLOGY;

EID: 14644389944     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2003)17:4(243)     Document Type: Article
Times cited : (51)

References (20)
  • 3
    • 0041359088 scopus 로고    scopus 로고
    • The charrette test method
    • Center for Integrated Facility Engineering, Stanford, Calif.
    • Clayton, M. J., Kunz, J. C., and Fischer, M. A. (1998). "The charrette test method." Technical Rep. No. 120, Center for Integrated Facility Engineering, Stanford, Calif.
    • (1998) Technical Rep. No. 120 , vol.120
    • Clayton, M.J.1    Kunz, J.C.2    Fischer, M.A.3
  • 5
    • 84974449619 scopus 로고
    • OARPLAN: Generating project plans by reasoning about objects, actions and resources
    • Darwiche, A., Levitt, R., and Hayes-Roth, B. (1989). "OARPLAN: Generating project plans by reasoning about objects, actions and resources. "AIEDAM, 2(3), 169-181.
    • (1989) AIEDAM , vol.2 , Issue.3 , pp. 169-181
    • Darwiche, A.1    Levitt, R.2    Hayes-Roth, B.3
  • 6
    • 0004312731 scopus 로고
    • Constructibility input to preliminary design of reinforced concrete structures
    • Center for Integrated Facility Engineering, Stanford, Calif.
    • Fischer, M. (1991). "Constructibility input to preliminary design of reinforced concrete structures." Technical Rep. No. 64, Center for Integrated Facility Engineering, Stanford, Calif.
    • (1991) Technical Rep. No. 64 , vol.64
    • Fischer, M.1
  • 7
    • 0029706255 scopus 로고    scopus 로고
    • Project modeling in construction applications
    • ASCE, New York
    • Froese, T., Yu, K., and Shahid, S. (1996). "Project modeling in construction applications." Computing in civil engineering, ASCE, New York, 572-578.
    • (1996) Computing in Civil Engineering , pp. 572-578
    • Froese, T.1    Yu, K.2    Shahid, S.3
  • 8
    • 0025415079 scopus 로고
    • Interactive vertical formwork selection
    • Hanna, A. S., and Sanvido, V. E. (1990). "Interactive vertical formwork selection." Concr. Int.: Des. Constr., 12(4), 26-32.
    • (1990) Concr. Int.: Des. Constr. , vol.12 , Issue.4 , pp. 26-32
    • Hanna, A.S.1    Sanvido, V.E.2
  • 9
    • 0344669175 scopus 로고    scopus 로고
    • International Alliance of Interoperability (IAI). (2001). IFC 2x extension modeling guide, 〈http://www.iai.org.uk〉.
    • (2001) IFC 2x Extension Modeling Guide
  • 10
    • 0028517808 scopus 로고
    • MDA planner: Interactive planning tool using product models and construction methods
    • Jägbeck, A. (1994). "MDA planner: Interactive planning tool using product models and construction methods." J. Comput. Civ. Eng., 8(4), 536-554.
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.4 , pp. 536-554
    • Jägbeck, A.1
  • 12
    • 0026382438 scopus 로고
    • Factors affecting masonrylabor productivity
    • Sanders, S. R., and Thomas, H. R. (1991). "Factors affecting masonrylabor productivity." J. Constr. Eng. Manage., 117(4), 626-644.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 626-644
    • Sanders, S.R.1    Thomas, H.R.2
  • 13
    • 0027545630 scopus 로고
    • Factors influencing formwork productivity
    • Smith, G. R., and Hanna, A. S. (1993). "Factors influencing formwork productivity." Can. J. Civ. Eng., 20(1), 144-153.
    • (1993) Can. J. Civ. Eng. , vol.20 , Issue.1 , pp. 144-153
    • Smith, G.R.1    Hanna, A.S.2
  • 15
    • 0042861949 scopus 로고    scopus 로고
    • Industrial case study of electronic design, cost, and schedule integration
    • Center for Integrated Facility Engineering, Stanford, Calif.
    • Staub-French, S., and Fischer, M. (2001). "Industrial case study of electronic design, cost, and schedule integration." Technical Rep. No. 122, Center for Integrated Facility Engineering, Stanford, Calif.
    • (2001) Technical Rep. No. 122 , vol.122
    • Staub-French, S.1    Fischer, M.2
  • 17
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf, A., Ganeshan, R., Chin, S., and Liu, L. (1996). "Object-oriented model for integrating construction product and process information." J. Comput. Civ. Eng., 10(3), 204-212.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.1    Ganeshan, R.2    Chin, S.3    Liu, L.4
  • 18
    • 0344240116 scopus 로고    scopus 로고
    • Construction baseline productivity: Theory and practice
    • Thomas, H. R., and Zavrski, I. (1999). "Construction baseline productivity: Theory and practice." J. Constr. Eng. Manage., 125(5), 295-303.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 295-303
    • Thomas, H.R.1    Zavrski, I.2
  • 20
    • 0041359108 scopus 로고    scopus 로고
    • Reasoning about construction methods
    • K. D. Walsh, ed., ASCE, Reston, Va.
    • Udaipurwala, A., and Russell, A. D. (2000). "Reasoning about construction methods." Construction Congress VI, K. D. Walsh, ed., ASCE, Reston, Va., 386-395.
    • (2000) Construction Congress VI , pp. 386-395
    • Udaipurwala, A.1    Russell, A.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.