메뉴 건너뛰기




Volumn 26, Issue 1, 2015, Pages 169-187

Active scheduling for hybrid flowshop with family setup time and inconsistent family formation

Author keywords

Active schedule; Family setup time; Hybrid flowshop scheduling; Inconsistent family formation; Non delay schedule

Indexed keywords

FACTOR ANALYSIS; MACHINE SHOPS; SCHEDULING;

EID: 84921068224     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0771-9     Document Type: Article
Times cited : (15)

References (16)
  • 3
    • 84921066316 scopus 로고
    • Alleles, loci
    • Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications
    • Goldgerg, D., & Lingle, R. (1985). Alleles, loci, and the traveling salesman problem. Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications.
    • (1985) and the traveling salesman problem
    • Goldgerg, D.1    Lingle, R.2
  • 4
    • 31444449761 scopus 로고    scopus 로고
    • Minimizing flow time in a flow-line manufacturing cell with family setup times
    • Gupta, J. N. D., & Schaller, J. E. (2005). Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57(2), 163–176.
    • (2005) Journal of the Operational Research Society , vol.57 , Issue.2 , pp. 163-176
    • Gupta, J.N.D.1    Schaller, J.E.2
  • 6
    • 15244361359 scopus 로고    scopus 로고
    • Two-machine flowshop batching and scheduling
    • Lin, B. M. T., & Cheng, T. C. E. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149–161.
    • (2005) Annals of Operations Research , vol.133 , pp. 149-161
    • Lin, B.M.T.1    Cheng, T.C.E.2
  • 9
    • 84861407526 scopus 로고    scopus 로고
    • Hybrid flowshop scheduling with family setup time and inconsistent family formation
    • Luo, H., Huang, G. Q., Shi, Y., Qu, T., & Zhang, Y. (2012). Hybrid flowshop scheduling with family setup time and inconsistent family formation. International Journal of Production Research, 50(6), 1457–1475.
    • (2012) International Journal of Production Research , vol.50 , Issue.6 , pp. 1457-1475
    • Luo, H.1    Huang, G.Q.2    Shi, Y.3    Qu, T.4    Zhang, Y.5
  • 10
    • 44849140428 scopus 로고    scopus 로고
    • A random key based genetic algorithm for the resource constrained project scheduling problem
    • Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1), 92–109.
    • (2009) Computers & Operations Research , vol.36 , Issue.1 , pp. 92-109
    • Mendes, J.J.M.1    Gonçalves, J.F.2    Resende, M.G.C.3
  • 12
    • 84855493366 scopus 로고    scopus 로고
    • A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
    • Mirsanei, H., Zandieh, M., Moayed, M., & Khabbazi, M. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965–978.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , Issue.6 , pp. 965-978
    • Mirsanei, H.1    Zandieh, M.2    Moayed, M.3    Khabbazi, M.4
  • 15
    • 0029636114 scopus 로고
    • Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher, A., Kolisch, R., & Drexl, A. (1995). Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80(1), 94–102.
    • (1995) European Journal of Operational Research , vol.80 , Issue.1 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 16
    • 78650179037 scopus 로고    scopus 로고
    • A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems
    • Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. Journal of Intelligent Manufacturing, 21(6), 731–743.
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.6 , pp. 731-743
    • Zandieh, M.1    Mozaffari, E.2    Gholami, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.