A survey of scheduling problems with setup times or costs
-
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
3
-
-
84921066316
-
Alleles, loci
-
Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications
-
Goldgerg, D., & Lingle, R. (1985). Alleles, loci, and the traveling salesman problem. Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications.
-
(1985)
and the traveling salesman problem
-
-
Goldgerg, D.1
Lingle, R.2
-
4
-
-
31444449761
-
Minimizing flow time in a flow-line manufacturing cell with family setup times
-
Gupta, J. N. D., & Schaller, J. E. (2005). Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57(2), 163–176.
-
(2005)
Journal of the Operational Research Society
, vol.57
, Issue.2
, pp. 163-176
-
-
Gupta, J.N.D.1
Schaller, J.E.2
-
5
-
-
67651174349
-
Heuristic algorithms for re-entrant hybrid flow shop scheduling with unrelated parallel machines
-
Kim, H.-W., & Lee, D.-H. (2009). Heuristic algorithms for re-entrant hybrid flow shop scheduling with unrelated parallel machines. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223(4), 433–442.
-
(2009)
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
, vol.223
, Issue.4
, pp. 433-442
-
-
Kim, H.-W.1
Lee, D.-H.2
-
6
-
-
15244361359
-
Two-machine flowshop batching and scheduling
-
Lin, B. M. T., & Cheng, T. C. E. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149–161.
-
(2005)
Annals of Operations Research
, vol.133
, pp. 149-161
-
-
Lin, B.M.T.1
Cheng, T.C.E.2
-
7
-
-
13444266302
-
Group scheduling in flexible flow shops
-
Logendran, R., Carson, S., & Hanson, E. (2005). Group scheduling in flexible flow shops. International Journal of Production Economics, 96(2), 143–155.
-
(2005)
International Journal of Production Economics
, vol.96
, Issue.2
, pp. 143-155
-
-
Logendran, R.1
Carson, S.2
Hanson, E.3
-
8
-
-
33644858890
-
Sequence-dependent group scheduling problems in flexible flow shops
-
Logendran, R., deSzoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102(1), 66–86.
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.1
, pp. 66-86
-
-
Logendran, R.1
deSzoeke, P.2
Barnard, F.3
-
9
-
-
84861407526
-
Hybrid flowshop scheduling with family setup time and inconsistent family formation
-
Luo, H., Huang, G. Q., Shi, Y., Qu, T., & Zhang, Y. (2012). Hybrid flowshop scheduling with family setup time and inconsistent family formation. International Journal of Production Research, 50(6), 1457–1475.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.6
, pp. 1457-1475
-
-
Luo, H.1
Huang, G.Q.2
Shi, Y.3
Qu, T.4
Zhang, Y.5
-
10
-
-
44849140428
-
A random key based genetic algorithm for the resource constrained project scheduling problem
-
Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1), 92–109.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.1
, pp. 92-109
-
-
Mendes, J.J.M.1
Gonçalves, J.F.2
Resende, M.G.C.3
-
12
-
-
84855493366
-
A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
-
Mirsanei, H., Zandieh, M., Moayed, M., & Khabbazi, M. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965–978.
-
(2011)
Journal of Intelligent Manufacturing
, vol.22
, Issue.6
, pp. 965-978
-
-
Mirsanei, H.1
Zandieh, M.2
Moayed, M.3
Khabbazi, M.4
-
14
-
-
80053567242
-
Makespan minimization of a flowshop sequence-dependent group scheduling problem
-
Salmasi, N., Logendran, R., & Skandari, M. (2011). Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology, 56(5), 699–710.
-
(2011)
The International Journal of Advanced Manufacturing Technology
, vol.56
, Issue.5
, pp. 699-710
-
-
Salmasi, N.1
Logendran, R.2
Skandari, M.3
-
15
-
-
0029636114
-
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
-
Sprecher, A., Kolisch, R., & Drexl, A. (1995). Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80(1), 94–102.
-
(1995)
European Journal of Operational Research
, vol.80
, Issue.1
, pp. 94-102
-
-
Sprecher, A.1
Kolisch, R.2
Drexl, A.3
-
16
-
-
78650179037
-
A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems
-
Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. Journal of Intelligent Manufacturing, 21(6), 731–743.
-
(2010)
Journal of Intelligent Manufacturing
, vol.21
, Issue.6
, pp. 731-743
-
-
Zandieh, M.1
Mozaffari, E.2
Gholami, M.3
|