메뉴 건너뛰기




Volumn 46, Issue 8, 2015, Pages 1486-1497

EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment

Author keywords

fuzzy expectation; fuzzy random variable; inventory; learning effect; process shifting

Indexed keywords

COST FUNCTIONS; FUZZY SYSTEMS; RANDOM VARIABLES; SENSITIVITY ANALYSIS;

EID: 84921024594     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207721.2013.823527     Document Type: Article
Times cited : (35)

References (26)
  • 2
    • 41549085652 scopus 로고    scopus 로고
    • Optimal lot size with learning consideration on an imperfect production system with allowable shortages
    • Chen, C.K., Lo, C.C., and, Liao, Y.X. (2008), Optimal Lot Size With Learning Consideration on an Imperfect Production System With Allowable Shortages, International Journal of Production Economics, 113, 459-469.
    • (2008) International Journal of Production Economics , vol.113 , pp. 459-469
    • Chen, C.K.1    Lo, C.C.2    Liao, Y.X.3
  • 3
    • 0037375114 scopus 로고    scopus 로고
    • An optimal production run time with imperfect production processes and allowable shortages
    • Chung, K.J., and, Hou, K.L. (2003), An Optimal Production Run Time With Imperfect Production Processes and Allowable Shortages, Computers & Operations Research, 30, 483-490.
    • (2003) Computers & Operations Research , vol.30 , pp. 483-490
    • Chung, K.J.1    Hou, K.L.2
  • 4
    • 34249054133 scopus 로고    scopus 로고
    • Inspection scheduling for imperfect production processes under free repair warranty contract
    • Giri, B.C., and, Dohi, T. (2007), Inspection Scheduling for Imperfect Production Processes Under Free Repair Warranty Contract, European Journal of Operational Research, 183, 238-252.
    • (2007) European Journal of Operational Research , vol.183 , pp. 238-252
    • Giri, B.C.1    Dohi, T.2
  • 6
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P.A., and, Salameh, M.K. (2001), Production Lot Sizing With the Reworking of Imperfect Quality Items Produced, Production Planning & Control, 12, 584-590.
    • (2001) Production Planning & Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 7
    • 77955269308 scopus 로고    scopus 로고
    • Optimal production run length with imperfect production processes and backorder in fuzzy random environment
    • Hu, J.S., Zheng, H., Guo, C.Y., and, Ji, Y.P. (2010), Optimal Production Run Length With Imperfect Production Processes and Backorder in Fuzzy Random Environment, Computers & Industrial Engineering, 59, 9-15.
    • (2010) Computers & Industrial Engineering , vol.59 , pp. 9-15
    • Hu, J.S.1    Zheng, H.2    Guo, C.Y.3    Ji, Y.P.4
  • 8
    • 0032761507 scopus 로고    scopus 로고
    • An optimal production run length in deteriorating production processes
    • Hyun, Kim, C., and, Hong, Y. (1999), An Optimal Production Run Length in Deteriorating Production Processes, International Journal of Production Economics, 58, 183-189.
    • (1999) International Journal of Production Economics , vol.58 , pp. 183-189
    • Hyun, K.C.1    Hong, Y.2
  • 9
    • 0030258194 scopus 로고    scopus 로고
    • Optimal lot sizing under learning considerations: The bounded learning case
    • Jaber, M.Y., and, Bonney, M. (1996), Optimal Lot Sizing Under Learning Considerations: The Bounded Learning Case, Applied Mathematical Modelling, 20, 750-755.
    • (1996) Applied Mathematical Modelling , vol.20 , pp. 750-755
    • Jaber, M.Y.1    Bonney, M.2
  • 10
    • 0031556620 scopus 로고    scopus 로고
    • The effect of learning and forgetting on the economic manufactured quantity (EMQ) with the consideration of intracycle backorders
    • Jaber, M.Y., and, Bonney, M. (1997), The Effect of Learning and Forgetting on the Economic Manufactured Quantity (EMQ) With the Consideration of Intracycle Backorders, International Journal of Production Economics, 53, 1-11.
    • (1997) International Journal of Production Economics , vol.53 , pp. 1-11
    • Jaber, M.Y.1    Bonney, M.2
  • 11
    • 3342875819 scopus 로고    scopus 로고
    • Learning curves for processes generating defects requiring reworks
    • Jaber, M.Y., and, Guiffrida, A.L. (2004), Learning Curves for Processes Generating Defects Requiring Reworks, European Journal of Operational Research, 159, 663-672.
    • (2004) European Journal of Operational Research , vol.159 , pp. 663-672
    • Jaber, M.Y.1    Guiffrida, A.L.2
  • 12
    • 38949110953 scopus 로고    scopus 로고
    • Learning curves for imperfect production processes with reworks and process restoration interruptions
    • Jaber, M.Y., and, Guiffrida, A.L. (2008), Learning Curves for Imperfect Production Processes With Reworks and Process Restoration Interruptions, European Journal of Operational Research, 189, 93-104.
    • (2008) European Journal of Operational Research , vol.189 , pp. 93-104
    • Jaber, M.Y.1    Guiffrida, A.L.2
  • 13
    • 0029304961 scopus 로고
    • Optimal lot sizing under learning considerations: Shortages allowed and backordered
    • Jaber, M.Y., and, Salameh, M.K. (1995), Optimal Lot Sizing Under Learning Considerations: Shortages Allowed and Backordered, Applied Mathematical Modelling, 19, 307-310.
    • (1995) Applied Mathematical Modelling , vol.19 , pp. 307-310
    • Jaber, M.Y.1    Salameh, M.K.2
  • 14
    • 6344232554 scopus 로고
    • Fuzzy random variables-I. Definitions and theorems
    • Kwakernaak, H. (1978), Fuzzy Random Variables-I. Definitions and Theorems, Information Sciences, 15, 1-29.
    • (1978) Information Sciences , vol.15 , pp. 1-29
    • Kwakernaak, H.1
  • 15
    • 84878740338 scopus 로고    scopus 로고
    • Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
    • Liao, G.L. (2013), Optimal Economic Production Quantity Policy for Randomly Failing Process With Minimal Repair, Backorder and Preventive Maintenance, International Journal of Systems Science, 44, 1602-1612.
    • (2013) International Journal of Systems Science , vol.44 , pp. 1602-1612
    • Liao, G.L.1
  • 16
    • 56249098653 scopus 로고    scopus 로고
    • Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
    • Liao, G.L., Chen, Y.H., and, Sheu, S.H. (2009), Optimal Economic Production Quantity Policy for Imperfect Process With Imperfect Repair and Maintenance, European Journal of Operational Research, 195, 348-357.
    • (2009) European Journal of Operational Research , vol.195 , pp. 348-357
    • Liao, G.L.1    Chen, Y.H.2    Sheu, S.H.3
  • 17
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt, M.J., and, Lee, H.L. (1986), Economic Production Cycles With Imperfect Production Processes, IIE Transactions, 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 18
    • 0027700977 scopus 로고
    • Mathematical modelling of the effect of human learning in the finite production inventory model
    • Salameh, M.K., Abdul-Malak, M.A.U., and, Jaber, M.Y. (1993), Mathematical Modelling of the Effect of Human Learning in the Finite Production Inventory Model, Applied Mathematical Modelling, 17, 613-615.
    • (1993) Applied Mathematical Modelling , vol.17 , pp. 613-615
    • Salameh, M.K.1    Abdul-Malak, M.A.U.2    Jaber, M.Y.3
  • 19
    • 70249126214 scopus 로고    scopus 로고
    • An economic production lot size model in an imperfect production system
    • Sana, S.S. (2010), An Economic Production Lot Size Model in an Imperfect Production System, European Journal of Operational Research, 201, 158-170.
    • (2010) European Journal of Operational Research , vol.201 , pp. 158-170
    • Sana, S.S.1
  • 21
    • 84857216355 scopus 로고    scopus 로고
    • Optimal ordering and production policy for a recoverable item inventory system with learning effect
    • Tsai, D.M. (2012), Optimal Ordering and Production Policy for a Recoverable Item Inventory System With Learning Effect, International Journal of Systems Science, 43, 349-367.
    • (2012) International Journal of Systems Science , vol.43 , pp. 349-367
    • Tsai, D.M.1
  • 22
    • 67349141707 scopus 로고    scopus 로고
    • Optimal production run length in deteriorating production processes with fuzzy elapsed time
    • Wang, X., and, Tang, W. (2009), Optimal Production Run Length in Deteriorating Production Processes With Fuzzy Elapsed Time, Computers & Industrial Engineering, 56, 1627-1632.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 1627-1632
    • Wang, X.1    Tang, W.2
  • 23
    • 84865250992 scopus 로고    scopus 로고
    • An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown
    • Widyadana, G.A., and, Wee, H.M. (2012), An Economic Production Quantity Model for Deteriorating Items With Preventive Maintenance Policy and Random Machine Breakdown, International Journal of Systems Science, 43, 1870-1882.
    • (2012) International Journal of Systems Science , vol.43 , pp. 1870-1882
    • Widyadana, G.A.1    Wee, H.M.2
  • 24
    • 0001250106 scopus 로고
    • Factors affecting the cost of airplane
    • Wright, T. (1936), Factors Affecting the Cost of Airplane, Journal of Aeronautical Sciences, 3, 122-128.
    • (1936) Journal of Aeronautical Sciences , vol.3 , pp. 122-128
    • Wright, T.1
  • 25
    • 0000903516 scopus 로고    scopus 로고
    • Ranking fuzzy numbers based on decomposition principle and signed distance
    • Yao, J.S., and, Wu, K. (2000), Ranking Fuzzy Numbers Based on Decomposition Principle and Signed Distance, Fuzzy Sets and Systems, 116, 275-288.
    • (2000) Fuzzy Sets and Systems , vol.116 , pp. 275-288
    • Yao, J.S.1    Wu, K.2
  • 26
    • 69649104015 scopus 로고    scopus 로고
    • Optimal run lengths in deteriorating production processes in random fuzzy environments
    • Zhang, C., Zhao, R., and, Tang, W. (2009), Optimal Run Lengths in Deteriorating Production Processes in Random Fuzzy Environments, Computers & Industrial Engineering, 57, 941-948.
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 941-948
    • Zhang, C.1    Zhao, R.2    Tang, W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.