메뉴 건너뛰기




Volumn 183, Issue 1, 2007, Pages 238-252

Inspection scheduling for imperfect production processes under free repair warranty contract

Author keywords

EMQ; Imperfect production processes; Inspection; Sequential policy; Warranty

Indexed keywords

COMPUTATIONAL METHODS; FAILURE ANALYSIS; INSPECTION; OPERATING COSTS; PROBABILITY DISTRIBUTIONS; SCHEDULING;

EID: 34249054133     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.09.062     Document Type: Article
Times cited : (55)

References (20)
  • 3
    • 0026220964 scopus 로고
    • Joint determination of production cycle and inspection intervals in a deteriorating production system
    • Lee J.S., and Park K.S. Joint determination of production cycle and inspection intervals in a deteriorating production system. Journal of the Operational Research Society 42 (1991) 775-783
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 775-783
    • Lee, J.S.1    Park, K.S.2
  • 4
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 (1987) 1125-1136
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 5
    • 0032021393 scopus 로고    scopus 로고
    • Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections
    • Makis V. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections. Naval Research Logistics 45 (1998) 165-186
    • (1998) Naval Research Logistics , vol.45 , pp. 165-186
    • Makis, V.1
  • 7
    • 0019539229 scopus 로고
    • Comparison among certain inspection policies
    • Munford A.G. Comparison among certain inspection policies. Management Science 27 (1981) 261-267
    • (1981) Management Science , vol.27 , pp. 261-267
    • Munford, A.G.1
  • 9
    • 0022613610 scopus 로고
    • Optimal lot sizing process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing process quality improvement and setup cost reduction. Operations Research 34 (1986) 137-144
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 10
    • 0000312965 scopus 로고
    • The impact of inspection delay on process and inspection lot sizing
    • Porteus E.L. The impact of inspection delay on process and inspection lot sizing. Management Science 36 (1990) 999-1007
    • (1990) Management Science , vol.36 , pp. 999-1007
    • Porteus, E.L.1
  • 11
    • 0028548762 scopus 로고
    • Joint determination of production quantity inspection schedule and control chart design
    • Rahim M.A. Joint determination of production quantity inspection schedule and control chart design. IIE Transactions 26 6 (1994) 2-11
    • (1994) IIE Transactions , vol.26 , Issue.6 , pp. 2-11
    • Rahim, M.A.1
  • 12
    • 84989726750 scopus 로고
    • A generalized model for the economic design of over(X, -) control chart for production systems with increasing failure rate and early replacement
    • Rahim M.A., and Banerjee P.K. A generalized model for the economic design of over(X, -) control chart for production systems with increasing failure rate and early replacement. Naval Research Logistics 40 (1993) 787-809
    • (1993) Naval Research Logistics , vol.40 , pp. 787-809
    • Rahim, M.A.1    Banerjee, P.K.2
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt M.J., and Lee H.J. Economic production cycles with imperfect production processes. IIE Transactions 18 (1986) 48-55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.J.2
  • 14
    • 0030218654 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy for deteriorating production systems
    • Tseng S.H. Optimal preventive maintenance policy for deteriorating production systems. IIE Transactions 28 (1996) 687-694
    • (1996) IIE Transactions , vol.28 , pp. 687-694
    • Tseng, S.H.1
  • 15
    • 2642586388 scopus 로고    scopus 로고
    • The impact of free-repair warranty policy on EMQ model for imperfect production systems
    • Wang C.H. The impact of free-repair warranty policy on EMQ model for imperfect production systems. Computers and Operations Research 31 (2004) 2021-2035
    • (2004) Computers and Operations Research , vol.31 , pp. 2021-2035
    • Wang, C.H.1
  • 16
    • 10444289915 scopus 로고    scopus 로고
    • Integrated production and production inspection policy for a deteriorating production system
    • Wang C.H. Integrated production and production inspection policy for a deteriorating production system. International Journal of Production Economics 95 1 (2005) 123-134
    • (2005) International Journal of Production Economics , vol.95 , Issue.1 , pp. 123-134
    • Wang, C.H.1
  • 17
    • 0038221261 scopus 로고    scopus 로고
    • Optimal lot sizing for products sold under free-repair warranty
    • Wang C.H., and Sheu S.H. Optimal lot sizing for products sold under free-repair warranty. European Journal of Operational Research 149 1 (2003) 131-141
    • (2003) European Journal of Operational Research , vol.149 , Issue.1 , pp. 131-141
    • Wang, C.H.1    Sheu, S.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.