-
3
-
-
0026220964
-
Joint determination of production cycle and inspection intervals in a deteriorating production system
-
Lee J.S., and Park K.S. Joint determination of production cycle and inspection intervals in a deteriorating production system. Journal of the Operational Research Society 42 (1991) 775-783
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 775-783
-
-
Lee, J.S.1
Park, K.S.2
-
4
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 (1987) 1125-1136
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
5
-
-
0032021393
-
Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections
-
Makis V. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections. Naval Research Logistics 45 (1998) 165-186
-
(1998)
Naval Research Logistics
, vol.45
, pp. 165-186
-
-
Makis, V.1
-
7
-
-
0019539229
-
Comparison among certain inspection policies
-
Munford A.G. Comparison among certain inspection policies. Management Science 27 (1981) 261-267
-
(1981)
Management Science
, vol.27
, pp. 261-267
-
-
Munford, A.G.1
-
9
-
-
0022613610
-
Optimal lot sizing process quality improvement and setup cost reduction
-
Porteus E.L. Optimal lot sizing process quality improvement and setup cost reduction. Operations Research 34 (1986) 137-144
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
10
-
-
0000312965
-
The impact of inspection delay on process and inspection lot sizing
-
Porteus E.L. The impact of inspection delay on process and inspection lot sizing. Management Science 36 (1990) 999-1007
-
(1990)
Management Science
, vol.36
, pp. 999-1007
-
-
Porteus, E.L.1
-
11
-
-
0028548762
-
Joint determination of production quantity inspection schedule and control chart design
-
Rahim M.A. Joint determination of production quantity inspection schedule and control chart design. IIE Transactions 26 6 (1994) 2-11
-
(1994)
IIE Transactions
, vol.26
, Issue.6
, pp. 2-11
-
-
Rahim, M.A.1
-
12
-
-
84989726750
-
A generalized model for the economic design of over(X, -) control chart for production systems with increasing failure rate and early replacement
-
Rahim M.A., and Banerjee P.K. A generalized model for the economic design of over(X, -) control chart for production systems with increasing failure rate and early replacement. Naval Research Logistics 40 (1993) 787-809
-
(1993)
Naval Research Logistics
, vol.40
, pp. 787-809
-
-
Rahim, M.A.1
Banerjee, P.K.2
-
13
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt M.J., and Lee H.J. Economic production cycles with imperfect production processes. IIE Transactions 18 (1986) 48-55
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.J.2
-
14
-
-
0030218654
-
Optimal preventive maintenance policy for deteriorating production systems
-
Tseng S.H. Optimal preventive maintenance policy for deteriorating production systems. IIE Transactions 28 (1996) 687-694
-
(1996)
IIE Transactions
, vol.28
, pp. 687-694
-
-
Tseng, S.H.1
-
15
-
-
2642586388
-
The impact of free-repair warranty policy on EMQ model for imperfect production systems
-
Wang C.H. The impact of free-repair warranty policy on EMQ model for imperfect production systems. Computers and Operations Research 31 (2004) 2021-2035
-
(2004)
Computers and Operations Research
, vol.31
, pp. 2021-2035
-
-
Wang, C.H.1
-
16
-
-
10444289915
-
Integrated production and production inspection policy for a deteriorating production system
-
Wang C.H. Integrated production and production inspection policy for a deteriorating production system. International Journal of Production Economics 95 1 (2005) 123-134
-
(2005)
International Journal of Production Economics
, vol.95
, Issue.1
, pp. 123-134
-
-
Wang, C.H.1
-
17
-
-
0038221261
-
Optimal lot sizing for products sold under free-repair warranty
-
Wang C.H., and Sheu S.H. Optimal lot sizing for products sold under free-repair warranty. European Journal of Operational Research 149 1 (2003) 131-141
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.1
, pp. 131-141
-
-
Wang, C.H.1
Sheu, S.H.2
|