Aalami, F., Kunz, J., and Fischer, M. (1998). " Model-based sequencing mechanisms used to automate activity sequencing.. " Working Paper No. 50, CIFE, Stanford Univ., Stanford, Calif.
-
(1998)
Model-based Sequencing Mechanisms Used to Automate Activity Sequencing
-
-
Aalami, F.1
Kunz, J.2
Fischer, M.3
-
2
-
-
0003457636
-
-
2nd Ed., Wiley, New York.
-
Antill, J., and Woodhead, R. (1970). Critical path methods in construction practice, 2nd Ed., Wiley, New York.
-
(1970)
Critical Path Methods in Construction Practice
-
-
Antill, J.1
Woodhead, R.2
-
3
-
-
2342418968
-
Implementing lean construction: Stabilizing work flow
-
Ballard, G., and Howell, G. (1994). " Implementing lean construction: Stabilizing work flow.. " Proc., 2nd Annual Meeting of the Int. Group for Lean Construction, Pontificia Universidad Catolica de Chile, Santiago, Chile 〈 http://www.vtt.fi/rte/lean/santiago.htm 〉, reprinted in Lean Construction, 101-110.
-
(1994)
Proc., 2nd Annual Meeting of the Int. Group for Lean Construction
, pp. 101-110
-
-
Ballard, G.1
Howell, G.2
-
4
-
-
0004146280
-
-
1st Ed., McGraw-Hill, New York
-
Barrie, D. S., and Paulson, C. B. (1978). Professional construction management, 1st Ed., McGraw-Hill, New York, 234-235.
-
(1978)
Professional Construction Management
, pp. 234-235
-
-
Barrie, D.S.1
Paulson, C.B.2
-
5
-
-
0019064535
-
Construction planning-beyond the critical path
-
Birrell, G. S. (1980). " Construction planning-beyond the critical path.. " J. Constr. Div., 106, 389-407.
-
(1980)
J. Constr. Div.
, vol.106
, pp. 389-407
-
-
Birrell, G.S.1
-
6
-
-
13944281016
-
Constraint-based planning with integrated production scheduler over internet
-
Chua, D. K. H., Shen, L. J., and Bok, S. H. (2003). " Constraint-based planning with integrated production scheduler over internet.. " J. Constr. Eng. Manage., 129 (3), 293-301.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 293-301
-
-
Chua, D.K.H.1
Shen, L.J.2
Bok, S.H.3
-
7
-
-
0041359088
-
-
120, CIFE, Stanford Univ., Stanford, Calif.
-
Clayton, M., Kunz, J., and Fischer, M. (1998). " The Charrette test method.. " Technical Rep. No. 120, CIFE, Stanford Univ., Stanford, Calif.
-
(1998)
The Charrette Test Method
-
-
Clayton, M.1
Kunz, J.2
Fischer, M.3
-
8
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions, and resources
-
Darwiche, A., Levitt, R., and Hayes-Roth, B. (1988). " OARPLAN: Generating project plans by reasoning about objects, actions, and resources.. " Artif. Intell. Eng. Des. Anal. Manuf., 2 (3), 169-181.
-
(1988)
Artif. Intell. Eng. Des. Anal. Manuf.
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.2
Hayes-Roth, B.3
-
9
-
-
0026130973
-
Sequence knowledge for construction scheduling
-
Echeverry, D., Ibbs, C. W., and Kim, S. (1991). " Sequence knowledge for construction scheduling.. " J. Constr. Eng. Manage., 117 (1), 118-130.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.1
, pp. 118-130
-
-
Echeverry, D.1
Ibbs, C.W.2
Kim, S.3
-
11
-
-
0023363930
-
Hierarchical rule-based activity duration estimation
-
Hendrickson, C., Martinelli, D., and Rehak, D. (1987). " Hierarchical rule-based activity duration estimation.. " J. Constr. Eng. Manage., 113 (2), 288-301.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.2
, pp. 288-301
-
-
Hendrickson, C.1
Martinelli, D.2
Rehak, D.3
-
13
-
-
35348927319
-
A suitable algorithm for computing partial transitive closures in databases
-
Jiang, B. (1990). " A suitable algorithm for computing partial transitive closures in databases.. " Proc., IEEE 6th Int. Conf. Data Engineering, Los Angeles, 154-168.
-
(1990)
Proc., IEEE 6th Int. Conf. Data Engineering
, pp. 154-168
-
-
Jiang, B.1
-
15
-
-
21344463623
-
-
Ph.D. thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
Koo, B. (2004). " Formalizing construction sequencing constraints for the rapid generation of scheduling alternatives.. " Ph.D. thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(2004)
Formalizing Construction Sequencing Constraints for the Rapid Generation of Scheduling Alternatives
-
-
Koo, B.1
-
16
-
-
0002068657
-
Using knowledge of construction and project management for automated schedule updating
-
Levitt, R. E., and Kunz, J. C. (1985). " Using knowledge of construction and project management for automated schedule updating.. " Proj. Manage. J., 16 (5), 57-81.
-
(1985)
Proj. Manage. J.
, vol.16
, Issue.5
, pp. 57-81
-
-
Levitt, R.E.1
Kunz, J.C.2
-
18
-
-
0024053818
-
GHOST: Project network generator
-
Navinchandra, D., Sriram, D., and Logcher, R. D. (1988). " GHOST: Project network generator.. " J. Comput. Civ. Eng., 2 (3), 239-254.
-
(1988)
J. Comput. Civ. Eng.
, vol.2
, Issue.3
, pp. 239-254
-
-
Navinchandra, D.1
Sriram, D.2
Logcher, R.D.3
-
19
-
-
34547763455
-
-
148, The Construction Institute, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
Paulson, B. C., Jr. (1971). " Man-computer concepts for project management.. " Technical Rep. No. 148, The Construction Institute, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1971)
Man-computer Concepts for Project Management
-
-
Paulson Jr., B.C.1
-
20
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
Riley, D. R., and Sanvido, V. E. (1995). " Patterns of construction-space use in multistory buildings.. " J. Constr. Eng. Manage., 121 (4), 464-473.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
21
-
-
0027607475
-
New generation of planning structures
-
Russell, A. D., and Wong, W. C. M. (1993). " New generation of planning structures.. " J. Constr. Eng. Manage., 119 (2), 196-214.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
22
-
-
0003584577
-
-
Prentice-Hall, Upper Saddle River, N.J.
-
Russell, S., and Norvig, P. (1995). Artificial intelligence: A modern approach, Prentice-Hall, Upper Saddle River, N.J.
-
(1995)
Artificial Intelligence: A Modern Approach
-
-
Russell, S.1
Norvig, P.2
-
23
-
-
35348835246
-
-
110, CIFE, Stanford Univ., Stanford, Calif.
-
Seibert, L., Seppanen, P., Kunz, J., and Paulson, B. (1996). " Value-added assessment of construction plans.. " Technical Rep. No. 110, CIFE, Stanford Univ., Stanford, Calif.
-
(1996)
Value-added Assessment of Construction Plans
-
-
Seibert, L.1
Seppanen, P.2
Kunz, J.3
Paulson, B.4
-
24
-
-
0019563065
-
Planning with constraints. MOLGEN: 1
-
Stefik, M. (1981). " Planning with constraints. MOLGEN: 1.. " Artif. Intell., 16 (2), 110-137.
-
(1981)
Artif. Intell.
, vol.16
, Issue.2
, pp. 110-137
-
-
Stefik, M.1
-
25
-
-
0024050376
-
Soft logic in network analysis
-
Tamimi, S., and Diekmann, J. (1988). " Soft logic in network analysis.. " J. Comput. Civ. Eng., 2 (3), 289-300.
-
(1988)
J. Comput. Civ. Eng.
, vol.2
, Issue.3
, pp. 289-300
-
-
Tamimi, S.1
Diekmann, J.2
-
26
-
-
1642309646
-
A trajectory for validating computational emulation models of organizations
-
Thomsen, J., Levitt, R., Kunz, J., Nass, C., and Fridsma, D. (1999). " A trajectory for validating computational emulation models of organizations.. " J. Computational and Mathematical Organization Theory, 5 (4), 385-401.
-
(1999)
J. Computational and Mathematical Organization Theory
, vol.5
, Issue.4
, pp. 385-401
-
-
Thomsen, J.1
Levitt, R.2
Kunz, J.3
Nass, C.4
Fridsma, D.5
-
27
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
28
-
-
84945708259
-
A theorem on Boolean matrices
-
Warshall, S. (1962). " A theorem on Boolean matrices.. " J. Altern Complement Med., 9 (1), 11-12.
-
(1962)
J. Altern Complement Med.
, vol.9
, Issue.1
, pp. 11-12
-
-
Warshall, S.1
-
29
-
-
0004089241
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Wiest, J. D., and Levy, F. K. (1969). A management guide to PERT/CPM, Prentice-Hall, Englewood Cliffs, N.J.
-
(1969)
A Management Guide to PERT/CPM
-
-
Wiest, J.D.1
Levy, F.K.2
|