Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives

Author keywords

Computer Aided Scheduling; Constraints; Construction management; Critical Path Methods

Indexed keywords

COMPLEX PROJECT SCHEDULES; CONSTRUCTION MANAGEMENTS; CRITICAL PATH METHODS; SUCCESSOR ACTIVITIES;

EID: 35348819914     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2007)21:6(423)     Document Type: Article
Times cited : (20)

References (29)
  • 3
    • 2342418968 scopus 로고
    • Implementing lean construction: Stabilizing work flow
    • Ballard, G., and Howell, G. (1994). " Implementing lean construction: Stabilizing work flow.. " Proc., 2nd Annual Meeting of the Int. Group for Lean Construction, Pontificia Universidad Catolica de Chile, Santiago, Chile 〈 http://www.vtt.fi/rte/lean/santiago.htm 〉, reprinted in Lean Construction, 101-110.
    • (1994) Proc., 2nd Annual Meeting of the Int. Group for Lean Construction , pp. 101-110
    • Ballard, G.1    Howell, G.2
  • 5
    • 0019064535 scopus 로고
    • Construction planning-beyond the critical path
    • Birrell, G. S. (1980). " Construction planning-beyond the critical path.. " J. Constr. Div., 106, 389-407.
    • (1980) J. Constr. Div. , vol.106 , pp. 389-407
    • Birrell, G.S.1
  • 6
    • 13944281016 scopus 로고    scopus 로고
    • Constraint-based planning with integrated production scheduler over internet
    • Chua, D. K. H., Shen, L. J., and Bok, S. H. (2003). " Constraint-based planning with integrated production scheduler over internet.. " J. Constr. Eng. Manage., 129 (3), 293-301.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 293-301
    • Chua, D.K.H.1    Shen, L.J.2    Bok, S.H.3
  • 8
    • 84974449619 scopus 로고
    • OARPLAN: Generating project plans by reasoning about objects, actions, and resources
    • Darwiche, A., Levitt, R., and Hayes-Roth, B. (1988). " OARPLAN: Generating project plans by reasoning about objects, actions, and resources.. " Artif. Intell. Eng. Des. Anal. Manuf., 2 (3), 169-181.
    • (1988) Artif. Intell. Eng. Des. Anal. Manuf. , vol.2 , Issue.3 , pp. 169-181
    • Darwiche, A.1    Levitt, R.2    Hayes-Roth, B.3
  • 9
    • 0026130973 scopus 로고
    • Sequence knowledge for construction scheduling
    • Echeverry, D., Ibbs, C. W., and Kim, S. (1991). " Sequence knowledge for construction scheduling.. " J. Constr. Eng. Manage., 117 (1), 118-130.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.1 , pp. 118-130
    • Echeverry, D.1    Ibbs, C.W.2    Kim, S.3
  • 11
    • 0023363930 scopus 로고
    • Hierarchical rule-based activity duration estimation
    • Hendrickson, C., Martinelli, D., and Rehak, D. (1987). " Hierarchical rule-based activity duration estimation.. " J. Constr. Eng. Manage., 113 (2), 288-301.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 288-301
    • Hendrickson, C.1    Martinelli, D.2    Rehak, D.3
  • 13
    • 35348927319 scopus 로고
    • A suitable algorithm for computing partial transitive closures in databases
    • Jiang, B. (1990). " A suitable algorithm for computing partial transitive closures in databases.. " Proc., IEEE 6th Int. Conf. Data Engineering, Los Angeles, 154-168.
    • (1990) Proc., IEEE 6th Int. Conf. Data Engineering , pp. 154-168
    • Jiang, B.1
  • 16
    • 0002068657 scopus 로고
    • Using knowledge of construction and project management for automated schedule updating
    • Levitt, R. E., and Kunz, J. C. (1985). " Using knowledge of construction and project management for automated schedule updating.. " Proj. Manage. J., 16 (5), 57-81.
    • (1985) Proj. Manage. J. , vol.16 , Issue.5 , pp. 57-81
    • Levitt, R.E.1    Kunz, J.C.2
  • 19
    • 34547763455 scopus 로고
    • 148, The Construction Institute, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • Paulson, B. C., Jr. (1971). " Man-computer concepts for project management.. " Technical Rep. No. 148, The Construction Institute, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • (1971) Man-computer Concepts for Project Management
    • Paulson Jr., B.C.1
  • 20
    • 0029470095 scopus 로고
    • Patterns of construction-space use in multistory buildings
    • Riley, D. R., and Sanvido, V. E. (1995). " Patterns of construction-space use in multistory buildings.. " J. Constr. Eng. Manage., 121 (4), 464-473.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 21
    • 0027607475 scopus 로고
    • New generation of planning structures
    • Russell, A. D., and Wong, W. C. M. (1993). " New generation of planning structures.. " J. Constr. Eng. Manage., 119 (2), 196-214.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 196-214
    • Russell, A.D.1    Wong, W.C.M.2
  • 24
    • 0019563065 scopus 로고
    • Planning with constraints. MOLGEN: 1
    • Stefik, M. (1981). " Planning with constraints. MOLGEN: 1.. " Artif. Intell., 16 (2), 110-137.
    • (1981) Artif. Intell. , vol.16 , Issue.2 , pp. 110-137
    • Stefik, M.1
  • 25
    • 0024050376 scopus 로고
    • Soft logic in network analysis
    • Tamimi, S., and Diekmann, J. (1988). " Soft logic in network analysis.. " J. Comput. Civ. Eng., 2 (3), 289-300.
    • (1988) J. Comput. Civ. Eng. , vol.2 , Issue.3 , pp. 289-300
    • Tamimi, S.1    Diekmann, J.2
  • 27
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3
  • 28
    • 84945708259 scopus 로고
    • A theorem on Boolean matrices
    • Warshall, S. (1962). " A theorem on Boolean matrices.. " J. Altern Complement Med., 9 (1), 11-12.
    • (1962) J. Altern Complement Med. , vol.9 , Issue.1 , pp. 11-12
    • Warshall, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.