메뉴 건너뛰기




Volumn 242, Issue 2, 2015, Pages 402-423

The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory

Author keywords

Adjusted silver meal (asm) heuristic; Pharmaceutical industry; Safety stock; Time varying stochastic demand; Vmi supply chain

Indexed keywords

ACCIDENT PREVENTION; NUMERICAL METHODS; PURCHASING; SALES; SENSITIVITY ANALYSIS; SILVER; STOCHASTIC SYSTEMS; SUPPLY CHAINS;

EID: 84920656413     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2014.09.045     Document Type: Article
Times cited : (50)

References (74)
  • 1
    • 64549109311 scopus 로고    scopus 로고
    • The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs
    • Absi, N., & Kedad-Sidhoum, S. (2009). The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs. Computers & Operations Research, 36(11), 2926-2936.
    • (2009) Computers & Operations Research , vol.36 , Issue.11 , pp. 2926-2936
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 4
    • 38249035693 scopus 로고
    • A table for the calculation of safety stock Combined issue
    • Aucamp, D. C., & Barringer, R. L. (1987). A table for the calculation of safety stock Combined issue. Journal of Operations Management, 7(1-2), 153-163.
    • (1987) Journal of Operations Management , vol.7 , Issue.1-2 , pp. 153-163
    • Aucamp, D.C.1    Barringer, R.L.2
  • 5
    • 80053566645 scopus 로고    scopus 로고
    • A replenishment policy based on joint optimization in a downstream pharmaceutical supply chain: Centralized vs. Decentralized replenishment
    • Baboli, A., Fondrevelle, J., Tavakkoli-Moghaddam, R., & Mehrabi, A. (2011). A replenishment policy based on joint optimization in a downstream pharmaceutical supply chain: centralized vs. decentralized replenishment. The International Journal of Advanced Manufacturing Technology, 57(1-4), 367-378.
    • (2011) The International Journal of Advanced Manufacturing Technology , vol.57 , Issue.1-4 , pp. 367-378
    • Baboli, A.1    Fondrevelle, J.2    Tavakkoli-Moghaddam, R.3    Mehrabi, A.4
  • 7
    • 0001049772 scopus 로고
    • Strategies for the probabilistic lot-sizing problem with service-level constraints
    • Bookbinder, J. H., & Tan, J. -Y. (1988). Strategies for the probabilistic lot-sizing problem with service-level constraints. Management Science, 34(9), 1096-1108.
    • (1988) Management Science , vol.34 , Issue.9 , pp. 1096-1108
    • Bookbinder, J.H.1    Tan, J.Y.2
  • 9
    • 0032624968 scopus 로고    scopus 로고
    • Managing supply chain demand variability with scheduled ordering policies
    • Cachon, G. P. (1999). Managing supply chain demand variability with scheduled ordering policies. Management Science, 45(6), 843-856.
    • (1999) Management Science , vol.45 , Issue.6 , pp. 843-856
    • Cachon, G.P.1
  • 10
    • 0033902373 scopus 로고    scopus 로고
    • Stock replenishment and shipment scheduling for vendor-managed inventory systems
    • Çetinkaya, S., & Lee, C. -Y. (2000). Stock replenishment and shipment scheduling for vendor-managed inventory systems. Management Science, 46(2), 217-232.
    • (2000) Management Science , vol.46 , Issue.2 , pp. 217-232
    • Çetinkaya, S.1    Lee, C.Y.2
  • 11
    • 0022025884 scopus 로고
    • The effect of engineering changes and demand uncertainty on MRP lot sizing: A case study
    • Chalmet, L. G., Bodt, M. D., &Wassenhove, L. V. (1985). The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study. International Journal of Production Research, 23(2), 233-251.
    • (1985) International Journal of Production Research , vol.23 , Issue.2 , pp. 233-251
    • Chalmet, L.G.1    Bodt, M.D.2    Wassenhove, L.V.3
  • 12
    • 84863219716 scopus 로고    scopus 로고
    • The impact of demand variability and transshipment on vendor's distribution policies under vendor managed inventory strategy
    • Chen, X., Hao, G., Li, X., & Yiu, K. F. C. (2012). The impact of demand variability and transshipment on vendor's distribution policies under vendor managed inventory strategy. International Journal of Production Economics, 139(1), 42-48.
    • (2012) International Journal of Production Economics , vol.139 , Issue.1 , pp. 42-48
    • Chen, X.1    Hao, G.2    Li, X.3    Yiu, K.F.C.4
  • 13
    • 25144494267 scopus 로고    scopus 로고
    • On measuring supplier performance under vendor-managed-inventory programs in capacitated supply chains
    • Choi, K. -S., Dai, J., & Song, J. -S. (2004). On measuring supplier performance under vendor-managed-inventory programs in capacitated supply chains. Manufacturing and Service Operations Management, 6(1), 53-72.
    • (2004) Manufacturing and Service Operations Management , vol.6 , Issue.1 , pp. 53-72
    • Choi, K.S.1    Dai, J.2    Song, J.S.3
  • 14
  • 15
    • 53349099400 scopus 로고    scopus 로고
    • Performance outcomes and success factors of vendormanaged inventory (VMI)
    • Claassen, M. J. T., Van Weele, A. J., & Van Raaij, E. M. (2008). Performance outcomes and success factors of vendormanaged inventory (VMI). Supply Chain Management, 13(6), 406-414.
    • (2008) Supply Chain Management , vol.13 , Issue.6 , pp. 406-414
    • Claassen, M.J.T.1    Van Weele, A.J.2    Van Raaij, E.M.3
  • 17
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in MRP lot sizing
    • De Bodt, M. A., & Wassenhove, L. N. (1983). Cost increases due to demand uncertainty in MRP lot sizing. Decision Sciences, 14(3), 345-362.
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 345-362
    • De Bodt, M.A.1    Wassenhove, L.N.2
  • 18
    • 36348929265 scopus 로고    scopus 로고
    • Supply planning under uncertainties in MRP environments: A state of the art
    • Dolgui, A., & Prodhon, C. (2007). Supply planning under uncertainties in MRP environments: A state of the art. Annual Reviews in Control, 31(2), 269-279.
    • (2007) Annual Reviews in Control , vol.31 , Issue.2 , pp. 269-279
    • Dolgui, A.1    Prodhon, C.2
  • 19
    • 12344315889 scopus 로고    scopus 로고
    • From a traditional replenishment system to vendor-managed inventory: A case study from the household electrical appliances sector
    • De Toni, A., & Zamolo, E. (2005). From a traditional replenishment system to vendor-managed inventory: A case study from the household electrical appliances sector. International Journal of Production Economics, 96(1), 63-79.
    • (2005) International Journal of Production Economics , vol.96 , Issue.1 , pp. 63-79
    • De Toni, A.1    Zamolo, E.2
  • 20
    • 0038580646 scopus 로고    scopus 로고
    • Approximate solutions for a stochastic lot-sizing problem with partial customer-order information
    • Dellaert, N., & Melo, M. (2002). Approximate solutions for a stochastic lot-sizing problem with partial customer-order information. European Journal of Operational Research, 150, 163-180.
    • (2002) European Journal of Operational Research , vol.150 , pp. 163-180
    • Dellaert, N.1    Melo, M.2
  • 22
    • 70349213984 scopus 로고    scopus 로고
    • A simulation-based replenishment model for the textile industry
    • Dong, A., & Leung, S. (2009). A simulation-based replenishment model for the textile industry. Textile Research Journal, 79(13), 1188-1201.
    • (2009) Textile Research Journal , vol.79 , Issue.13 , pp. 1188-1201
    • Dong, A.1    Leung, S.2
  • 23
    • 33846794196 scopus 로고    scopus 로고
    • Vendor-managed inventory: Financial and business concepts in brief
    • Emigh, J. (1999). Vendor-managed inventory: Financial and business concepts in brief. Computer World, 33, 52.
    • (1999) Computer World , vol.33 , pp. 52
    • Emigh, J.1
  • 24
    • 0008299369 scopus 로고
    • Determining safety stock in the presence of stochastic lead time and demand
    • Eppen, G. D., & Kipp, M. R. (1988). Determining safety stock in the presence of stochastic lead time and demand. Management Science, 34(11), 1380-1390.
    • (1988) Management Science , vol.34 , Issue.11 , pp. 1380-1390
    • Eppen, G.D.1    Kipp, M.R.2
  • 25
    • 0001275618 scopus 로고    scopus 로고
    • What is the right supply chain for your product?
    • Fisher, M. (1997). What is the right supply chain for your product? Harvard Business Review, 75(March-April), 105-116.
    • (1997) Harvard Business Review , vol.75 , Issue.MARCH-APRIL , pp. 105-116
    • Fisher, M.1
  • 26
    • 0346449638 scopus 로고    scopus 로고
    • Coordinating production and delivery under a (z, Z)-type vendor-managed inventory contract
    • Fry, M., Kapuscinski, R., & Olsen, T. (2001). Coordinating production and delivery under a (z, Z)-type vendor-managed inventory contract. Manufacturing and Service Operations Management, 3(2), 151-173.
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.2 , pp. 151-173
    • Fry, M.1    Kapuscinski, R.2    Olsen, T.3
  • 29
    • 84880515067 scopus 로고    scopus 로고
    • Vendormanaged inventory: A review based on dimensions
    • Govindan, K. (2013). Vendormanaged inventory: A review based on dimensions. International Journal of Production Research, 51(13), 3808-3835.
    • (2013) International Journal of Production Research , vol.51 , Issue.13 , pp. 3808-3835
    • Govindan, K.1
  • 30
    • 84993111650 scopus 로고    scopus 로고
    • Vendor managed inventory (VMI): Evidences from lean deployment in healthcare. Strategic Outsourcing
    • Guimarães, C. M., de Carvalho, J. C., & Maia, A. (2013). Vendor managed inventory (VMI): evidences from lean deployment in healthcare. Strategic Outsourcing: An International Journal, 6(1), 8-24.
    • (2013) An International Journal , vol.6 , Issue.1 , pp. 8-24
    • Guimarães, C.M.1    De Carvalho, J.C.2    Maia, A.3
  • 31
    • 84896371230 scopus 로고    scopus 로고
    • A multi-echelon inventory system with supplier selection and order allocation under stochastic demand
    • Guo, C., & Li, X. (2014). A multi-echelon inventory system with supplier selection and order allocation under stochastic demand. International Journal of Production Economics.
    • (2014) International Journal of Production Economics.
    • Guo, C.1    Li, X.2
  • 33
    • 84867331131 scopus 로고    scopus 로고
    • Concepts for safety stock determination under stochastic demand and different types of random production yield
    • Inderfurth, K., & Vogelgesang, S. (2013). Concepts for safety stock determination under stochastic demand and different types of random production yield. European Journal of Operational Research, 224(2), 293-301.
    • (2013) European Journal of Operational Research , vol.224 , Issue.2 , pp. 293-301
    • Inderfurth, K.1    Vogelgesang, S.2
  • 34
    • 0033908090 scopus 로고    scopus 로고
    • Measuring the performance of lot-sizing techniques in uncertain environments
    • Jeunet, J, & Jonard, N. (2000). Measuring the performance of lot-sizing techniques in uncertain environments. International Journal of Production Economics, 64, 197-208.
    • (2000) International Journal of Production Economics , vol.64 , pp. 197-208
    • Jeunet, J.1    Jonard, N.2
  • 35
    • 0036474928 scopus 로고    scopus 로고
    • The stochastic inventory routing problem with direct deliveries
    • Kleywegt, A. J., Nori, V. S., & Savelsbergh, M. W. (2002). The stochastic inventory routing problem with direct deliveries. Transportation Science, 36(1), 94-118.
    • (2002) Transportation Science , vol.36 , Issue.1 , pp. 94-118
    • Kleywegt, A.J.1    Nori, V.S.2    Savelsbergh, M.W.3
  • 36
    • 1642324107 scopus 로고    scopus 로고
    • Dynamic programming approximations for a stochastic inventory routing problem
    • Kleywegt, A. J., Nori, V. S., & Savelsbergh, M. W. (2004). Dynamic programming approximations for a stochastic inventory routing problem. Transportation Science, 38(1), 42-70.
    • (2004) Transportation Science , vol.38 , Issue.1 , pp. 42-70
    • Kleywegt, A.J.1    Nori, V.S.2    Savelsbergh, M.W.3
  • 37
    • 84989427471 scopus 로고
    • Heuristic lot-sizing approach for dealing with MRP system nervousness
    • Kropp, D. H., Carlson, D. C., & Jucker, J. V. (1983). Heuristic lot-sizing approach for dealing with MRP system nervousness. Decision Sciences, 14, 159-169.
    • (1983) Decision Sciences , vol.14 , pp. 159-169
    • Kropp, D.H.1    Carlson, D.C.2    Jucker, J.V.3
  • 38
    • 60849094048 scopus 로고    scopus 로고
    • Situation reactive approach to Vendor Managed Inventory problem
    • Kwak, C., Choi, J., Kim, C., & Kwon, I. -H. (2009). Situation reactive approach to Vendor Managed Inventory problem. Expert Systems with Applications, 36(5), 9039-9045.
    • (2009) Expert Systems with Applications , vol.36 , Issue.5 , pp. 9039-9045
    • Kwak, C.1    Choi, J.2    Kim, C.3    Kwon, I.H.4
  • 39
    • 10444279259 scopus 로고    scopus 로고
    • Who should control inventory in a supply chain?
    • Lee, C., & Chu, W. (2005). Who should control inventory in a supply chain? European Journal of Operational Research, 164(1), 158-172.
    • (2005) European Journal of Operational Research , vol.164 , Issue.1 , pp. 158-172
    • Lee, C.1    Chu, W.2
  • 41
    • 81555208211 scopus 로고    scopus 로고
    • New model and heuristics for safety stock placement in general acyclic supply chain networks
    • Li, H., & Jiang, D. (2012). New model and heuristics for safety stock placement in general acyclic supply chain networks. Computers & Operations Research, 39(7), 1333-1344.
    • (2012) Computers & Operations Research , vol.39 , Issue.7 , pp. 1333-1344
    • Li, H.1    Jiang, D.2
  • 42
    • 59049101839 scopus 로고    scopus 로고
    • Replenishment policies for sustainable business development in a continuous credit based vendor managed inventory distribution system
    • Michaelraj, L., & Shahabudeen, P. (2009). Replenishment policies for sustainable business development in a continuous credit based vendor managed inventory distribution system. Computers and Industrial Engineering, 56(1), 260-266.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.1 , pp. 260-266
    • Michaelraj, L.1    Shahabudeen, P.2
  • 43
    • 44349118034 scopus 로고    scopus 로고
    • Contracting under vendor managed inventory systems using holding cost subsidies
    • Nagarajan, M., & Rajagopalan, S. (2008). Contracting under vendor managed inventory systems using holding cost subsidies. Production and Operations Management, 17(2), 200-210.
    • (2008) Production and Operations Management , vol.17 , Issue.2 , pp. 200-210
    • Nagarajan, M.1    Rajagopalan, S.2
  • 44
    • 80055031868 scopus 로고    scopus 로고
    • Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time
    • Osman, H., & Demirli, K. (2012). Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time. International Journal of Production Economics, 135(1), 299-307.
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 299-307
    • Osman, H.1    Demirli, K.2
  • 46
    • 3342905239 scopus 로고    scopus 로고
    • The effect of lot sizing rules on order variability
    • Pujawan, I. (2004). The effect of lot sizing rules on order variability. European Journal of Operational Research, 159(2004), 617-635.
    • (2004) European Journal of Operational Research , vol.159 , Issue.2004 , pp. 617-635
    • Pujawan, I.1
  • 47
    • 38649093918 scopus 로고    scopus 로고
    • Augmenting the lot sizing order quantity when demand is probabilistic
    • Pujawan, I., & Silver, E. (2008). Augmenting the lot sizing order quantity when demand is probabilistic. European Journal of Operational Research, 188(3), 705-722.
    • (2008) European Journal of Operational Research , vol.188 , Issue.3 , pp. 705-722
    • Pujawan, I.1    Silver, E.2
  • 49
    • 84900486175 scopus 로고    scopus 로고
    • Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor's ordering cost
    • Rad, R. H., Razmi, J., Sangari, M. S., & Ebrahimi, Z. F. (2014). Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor's ordering cost. International Journal of Production Economics, 153, 295-308.
    • (2014) International Journal of Production Economics , vol.153 , pp. 295-308
    • Rad, R.H.1    Razmi, J.2    Sangari, M.S.3    Ebrahimi, Z.F.4
  • 53
    • 42549087893 scopus 로고    scopus 로고
    • On the benefits of CPFR and VMI: A comparative simulation study
    • Sari, K. (2008). On the benefits of CPFR and VMI: A comparative simulation study. International Journal of Production Economics, 113(2), 575-586.
    • (2008) International Journal of Production Economics , vol.113 , Issue.2 , pp. 575-586
    • Sari, K.1
  • 56
    • 57349199394 scopus 로고    scopus 로고
    • Quantifying the effectiveness of VMI and integrated inventorymanagement in a supply chain with uncertain lead-times and uncertain demands
    • Song, D. -P., & Dinwoodie, J. (2008). Quantifying the effectiveness of VMI and integrated inventorymanagement in a supply chain with uncertain lead-times and uncertain demands. Production Planning and Control, 19(6), 590-600.
    • (2008) Production Planning and Control , vol.19 , Issue.6 , pp. 590-600
    • Song, D.P.1    Dinwoodie, J.2
  • 58
    • 84866976436 scopus 로고    scopus 로고
    • An EOQ model with partial delayed payment and partial backordering
    • Taleizadeh, A. A., Pentico, D. W., Jabalameli, M. S., & Aryanezhad, M. (2013). An EOQ model with partial delayed payment and partial backordering. Omega, 41, 354-368.
    • (2013) Omega , vol.41 , pp. 354-368
    • Taleizadeh, A.A.1    Pentico, D.W.2    Jabalameli, M.S.3    Aryanezhad, M.4
  • 59
    • 84875728928 scopus 로고    scopus 로고
    • An economic order quantity model with a known price increase and partial backordering
    • Taleizadeh, A. A., & Pentico, D. W. (2013). An economic order quantity model with a known price increase and partial backordering. European Journal of Operational Research, 228(3), 516-525.
    • (2013) European Journal of Operational Research , vol.228 , Issue.3 , pp. 516-525
    • Taleizadeh, A.A.1    Pentico, D.W.2
  • 60
    • 84878446549 scopus 로고    scopus 로고
    • Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time
    • Taleizadeh, A. A., Niaki, S. T. A., & Wee, H. M. (2013). Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time. Knowledge-Based Systems, 48, 1-9.
    • (2013) Knowledge-Based Systems , vol.48 , pp. 1-9
    • Taleizadeh, A.A.1    Niaki, S.T.A.2    Wee, H.M.3
  • 62
    • 0742266961 scopus 로고    scopus 로고
    • The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
    • Tarim, A. S., & Kingsman, B. G. (2004). The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. International Journal of Production Economics, 88, 105-119.
    • (2004) International Journal of Production Economics , vol.88 , pp. 105-119
    • Tarim, A.S.1    Kingsman, B.G.2
  • 63
    • 79953127832 scopus 로고    scopus 로고
    • A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint
    • Tempelmeier, H. (2011). A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint. Omega., 39(6), 627-633.
    • (2011) Omega , vol.39 , Issue.6 , pp. 627-633
    • Tempelmeier, H.1
  • 64
    • 63349104845 scopus 로고    scopus 로고
    • An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model
    • Vargas, V. (2009). An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model. European Journal of Operational research, 198, 447-451.
    • (2009) European Journal of Operational Research , vol.198 , pp. 447-451
    • Vargas, V.1
  • 65
    • 0030086447 scopus 로고    scopus 로고
    • Adapting lot-sizing techniques to stochastic demand through production scheduling policy
    • Vargas, V. A., & Metters, R. (1996). Adapting lot-sizing techniques to stochastic demand through production scheduling policy. IIE Transactions, 28, 141-148.
    • (1996) IIE Transactions , vol.28 , pp. 141-148
    • Vargas, V.A.1    Metters, R.2
  • 68
    • 0001542461 scopus 로고    scopus 로고
    • Vendor managed inventory in the retail supply chain
    • Waller, M., Johnson, M., & Davis, T. (1999). Vendor managed inventory in the retail supply chain. Journal of Business Logistics., 20(1), 183-204.
    • (1999) Journal of Business Logistics. , vol.20 , Issue.1 , pp. 183-204
    • Waller, M.1    Johnson, M.2    Davis, T.3
  • 69
    • 79151477433 scopus 로고    scopus 로고
    • Location and allocation decisions in a two-echelon supply chain with stochastic demand - A genetic-algorithm based solution
    • Wang, K. J., Makond, B., & Liu, S. Y. (2011). Location and allocation decisions in a two-echelon supply chain with stochastic demand - A genetic-algorithm based solution. Expert Systems with Applications, 38(5), 6125-6131.
    • (2011) Expert Systems with Applications , vol.38 , Issue.5 , pp. 6125-6131
    • Wang, K.J.1    Makond, B.2    Liu, S.Y.3
  • 70
    • 84878013290 scopus 로고    scopus 로고
    • A periodic-review inventory control policy for a two-level supply chain with multiple retailers and stochastic demand
    • Wang, Q. (2013). A periodic-review inventory control policy for a two-level supply chain with multiple retailers and stochastic demand. European Journal of Operational Research, 230, 53-62.
    • (2013) European Journal of Operational Research , vol.230 , pp. 53-62
    • Wang, Q.1
  • 71
    • 38649139914 scopus 로고    scopus 로고
    • The inventory value of information sharing, continuous replenishment, and vendor-managed inventory
    • Yao, Y., & Dresner, M. (2008). The inventory value of information sharing, continuous replenishment, and vendor-managed inventory. Transportation Research Part E: Logistics and Transportation Review, 44(3), 361-378.
    • (2008) Transportation Research Part E: Logistics and Transportation Review , vol.44 , Issue.3 , pp. 361-378
    • Yao, Y.1    Dresner, M.2
  • 72
    • 59049102409 scopus 로고    scopus 로고
    • Analyzing the evolutionary stability of the vendor-managed inventory supply chains
    • Yu, H., Zeng, A. Z., & Zhao, L. (2009). Analyzing the evolutionary stability of the vendor-managed inventory supply chains. Computers & Industrial Engineering, 56(1), 274-282.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 274-282
    • Yu, H.1    Zeng, A.Z.2    Zhao, L.3
  • 73
    • 77950371399 scopus 로고    scopus 로고
    • Nash game model for optimizing market strategies, configuration of platform products in a vendor managed
    • Yu, Y., & Huang, G.Q. (2010). Nash game model for optimizing market strategies, configuration of platform products in a vendor managed. European Journal of Operational Research, 206(2), 361-373.
    • (2010) European Journal of Operational Research , vol.206 , Issue.2 , pp. 361-373
    • Yu, Y.1    Huang, G.Q.2
  • 74


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.