|
Volumn 80, Issue , 2015, Pages 236-244
|
Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty
|
Author keywords
Machine reliability; Preventive maintenance; Proactive; Single machine scheduling
|
Indexed keywords
MAINTENANCE;
PRODUCTION CONTROL;
SCHEDULING;
SCHEDULING ALGORITHMS;
WEIBULL DISTRIBUTION;
AVAILABILITY CONSTRAINTS;
DEGREE OF UNCERTAINTY;
INTEGRATED PRODUCTION;
MACHINE RELIABILITY;
PREVENTIVE MAINTENANCE (PM);
PROACTIVE;
PRODUCTION SCHEDULING PROBLEMS;
SINGLE-MACHINE SCHEDULING;
PREVENTIVE MAINTENANCE;
|
EID: 84920398557
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/j.cie.2014.12.017 Document Type: Article |
Times cited : (106)
|
References (16)
|