메뉴 건너뛰기




Volumn 28, Issue 3, 2015, Pages 251-265

Revised multi-choice goal programming for integrated supply chain design and dynamic virtual cell formation with fuzzy parameters

Author keywords

multi choice goal programming; supply chain; virtual cell formation

Indexed keywords

CELLS; CYTOLOGY; LINEAR PROGRAMMING; MULTIOBJECTIVE OPTIMIZATION; SUPPLY CHAINS;

EID: 84916943735     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2013.874596     Document Type: Article
Times cited : (60)

References (62)
  • 1
    • 51249101510 scopus 로고    scopus 로고
    • Integrated cellular manufacturing systems design with production planning and dynamic system reconfiguration
    • Ahkioon, S., A. A. Bulgak, and T. Bektas. 2009. Integrated Cellular Manufacturing Systems Design with Production Planning and Dynamic System Reconfiguration. European Journal of Operational Research 192 (2): 414-428.
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 414-428
    • Ahkioon, S.1    Bulgak, A.A.2    Bektas, T.3
  • 2
    • 84878125260 scopus 로고    scopus 로고
    • Fuzzy goal programming model: An overview of the current state-ofthe art
    • Aouni, B., J. M. Mertel, and A. Hassaine. 2009. Fuzzy Goal Programming Model: An Overview of the Current State-ofthe Art. Journal of Multi-Criteria Decision Analysis 16 (5-6): 149-161.
    • (2009) Journal of Multi-Criteria Decision Analysis , vol.16 , Issue.5-6 , pp. 149-161
    • Aouni, B.1    Mertel, J.M.2    Hassaine, A.3
  • 4
    • 0242360414 scopus 로고    scopus 로고
    • Development of virtual cellular manufacturing systems for SMEs
    • Babu, S., K. N. Nandurkar, and A. Thomas. 2000. Development of Virtual Cellular Manufacturing Systems for SMEs. Logistics Information Management 13 (4): 228-242.
    • (2000) Logistics Information Management , vol.13 , Issue.4 , pp. 228-242
    • Babu, S.1    Nandurkar, K.N.2    Thomas, A.3
  • 5
    • 33750466515 scopus 로고    scopus 로고
    • Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
    • Balakrishnan, J., and C. H. Cheng. 2007. Multi-Period Planning and Uncertainty Issues in Cellular Manufacturing: A Review and Future Directions. European Journal of Operational Research 177 (1): 281-309.
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 281-309
    • Balakrishnan, J.1    Cheng, C.H.2
  • 6
    • 0015048799 scopus 로고
    • Production flow analysis
    • Burbidge, J. L. 1971. Production Flow Analysis. Production Engineer 50: 139-152.
    • (1971) Production Engineer , vol.50 , pp. 139-152
    • Burbidge, J.L.1
  • 7
    • 33748886522 scopus 로고    scopus 로고
    • Multi-choice goal programming
    • Chang, C. T. 2007. Multi-Choice Goal Programming. Omega 35 (4): 389-396.
    • (2007) Omega , vol.35 , Issue.4 , pp. 389-396
    • Chang, C.T.1
  • 8
    • 50149092630 scopus 로고    scopus 로고
    • Revised multi-choice goal programming
    • Chang, C. T. 2008. Revised Multi-Choice Goal Programming. Applied Mathematical Modelling 32 (12): 2587-2595.
    • (2008) Applied Mathematical Modelling , vol.32 , Issue.12 , pp. 2587-2595
    • Chang, C.T.1
  • 10
    • 84875377451 scopus 로고    scopus 로고
    • Multi-choice mixed integer goal programming optimization for real problems in a sugar and ethanol milling company
    • Da Silva, A. F., F. A. Silva Marins, and J. A. Barra Montevechi. 2013. Multi-Choice Mixed Integer Goal Programming Optimization for Real Problems in a Sugar and Ethanol Milling Company. Applied Mathematical Modelling 37 (9): 6146-6162.
    • (2013) Applied Mathematical Modelling , vol.37 , Issue.9 , pp. 6146-6162
    • Da Silva, A.F.1    Silva Marins, F.A.2    Barra Montevechi, J.A.3
  • 11
    • 33745841943 scopus 로고    scopus 로고
    • A comprehensive mathematical model for the design of cellular manufacturing systems
    • Defersha, F. M., and M. Chen. 2006. A Comprehensive Mathematical Model for the Design of Cellular Manufacturing Systems. International Journal of Production Economics 103 (2): 767-783.
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 767-783
    • Defersha, F.M.1    Chen, M.2
  • 12
    • 35848946365 scopus 로고    scopus 로고
    • A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality
    • Defersha, F. M., and M. Chen. 2008. A Linear Programming Embedded Genetic Algorithm for an Integrated Cell Formation and Lot Sizing Considering Product Quality. European Journal of Operational Research 187 (1): 46-69.
    • (2008) European Journal of Operational Research , vol.187 , Issue.1 , pp. 46-69
    • Defersha, F.M.1    Chen, M.2
  • 14
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modelling flexible constraints vs. Coping with incomplete knowledge
    • Dubois, D., H. Fargier, and P. Fortemps. 2003. Fuzzy Scheduling: Modelling Flexible Constraints vs. Coping with Incomplete Knowledge. European Journal of Operational Research 147 (2): 231-252.
    • (2003) European Journal of Operational Research , vol.147 , Issue.2 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 15
    • 78049526637 scopus 로고    scopus 로고
    • A comprehensive dynamic cell formation design: Benders decomposition approach
    • Ghotboddini, M. M., M. Rabbani, and H. Rahimian. 2011. A Comprehensive Dynamic Cell Formation Design: Benders Decomposition Approach. Expert Systems with Applications 38 (3): 2478-2488.
    • (2011) Expert Systems with Applications , vol.38 , Issue.3 , pp. 2478-2488
    • Ghotboddini, M.M.1    Rabbani, M.2    Rahimian, H.3
  • 17
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on mrp system nervousness
    • Ho, C. 1989. Evaluating the Impact of Operating Environments on MRP System Nervousness. International Journal of Production Research 27 (7): 1115-1135.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1115-1135
    • Ho, C.1
  • 18
    • 0001862777 scopus 로고    scopus 로고
    • Possibilistic linear programming: A brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem
    • Inuiguchi, M., and J. Ramik. 2000. Possibilistic Linear Programming: A Brief Review of Fuzzy Mathematical Programming and a Comparison with Stochastic Programming in Portfolio Selection Problem. Fuzzy Sets and Systems 111 (1): 3-28.
    • (2000) Fuzzy Sets and Systems , vol.111 , Issue.1 , pp. 3-28
    • Inuiguchi, M.1    Ramik, J.2
  • 20
    • 0037116761 scopus 로고    scopus 로고
    • Multi-objective meta-heuristics: An overview of the current state-of-the-art
    • Jones, D. F., S. K. Mirrazavi, and M. Tamiz. 2002. Multi-Objective Meta-Heuristics: An Overview of the Current State-of-the-Art. European Journal of Operational Research 137 (1): 1-9.
    • (2002) European Journal of Operational Research , vol.137 , Issue.1 , pp. 1-9
    • Jones, D.F.1    Mirrazavi, S.K.2    Tamiz, M.3
  • 21
    • 78649632754 scopus 로고    scopus 로고
    • Possibilistic linear-programming approach for supply chain networking decisions
    • Kabak, O., and F. Ülengin. 2011. Possibilistic Linear-Programming Approach for Supply Chain Networking Decisions. European Journal of Operational Research 209 (3): 253-264.
    • (2011) European Journal of Operational Research , vol.209 , Issue.3 , pp. 253-264
    • Kabak, O.1    Ülengin, F.2
  • 22
    • 57649155746 scopus 로고    scopus 로고
    • Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: Ant colony optimization (ACO)-based metamodels
    • Kesen, S. E., M. D. Toksari, Z. Gungor, and E. Guner. 2009. Analyzing the Behaviors of Virtual Cells (VCs) and Traditional Manufacturing Systems: Ant Colony Optimization (ACO)-Based Metamodels. Computers & Operations Research 36 (7): 2275-2285.
    • (2009) Computers & Operations Research , vol.36 , Issue.7 , pp. 2275-2285
    • Kesen, S.E.1    Toksari, M.D.2    Gungor, Z.3    Guner, E.4
  • 23
    • 84859708574 scopus 로고    scopus 로고
    • Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing
    • Kia, R., A. Baboli, N. Javadian, R. Tavakkoli-Moghaddam, M. Kazemi, and J. Khorrami. 2012. Solving a Group Layout Design Model of a Dynamic Cellular Manufacturing System with Alternative Process Routings, Lot Splitting and Flexible Reconfiguration by Simulated Annealing. Computers & Operations Research 39 (11): 2642-2658.
    • (2012) Computers & Operations Research , vol.39 , Issue.11 , pp. 2642-2658
    • Kia, R.1    Baboli, A.2    Javadian, N.3    Tavakkoli-Moghaddam, R.4    Kazemi, M.5    Khorrami, J.6
  • 24
    • 84952536386 scopus 로고
    • Grouping efficacy: A quantitative criterion for goodness of block diagonal forms of binary matrices in group technology
    • Kumar, C., and M. Chandrasekharan. 1990. Grouping Efficacy: A Quantitative Criterion for Goodness of Block Diagonal Forms of Binary Matrices in Group Technology. International Journal of Production Research 28 (2): 233-243.
    • (1990) International Journal of Production Research , vol.28 , Issue.2 , pp. 233-243
    • Kumar, C.1    Chandrasekharan, M.2
  • 25
    • 31744439154 scopus 로고    scopus 로고
    • A fuzzy programming approach for vendor selection problem in a supply chain
    • Kumar, M., P. Vrat, and R. Shankar. 2006. A Fuzzy Programming Approach for Vendor Selection Problem in a Supply Chain. International Journal of Production Economic 101 (2): 273-285.
    • (2006) International Journal of Production Economic , vol.101 , Issue.2 , pp. 273-285
    • Kumar, M.1    Vrat, P.2    Shankar, R.3
  • 26
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Lai, Y. J., and C. L. Hwang. 1992. A New Approach to Some Possibilistic Linear Programming Problems. Fuzzy Sets and Systems 49 (2): 121-133.
    • (1992) Fuzzy Sets and Systems , vol.49 , Issue.2 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 27
    • 84857846227 scopus 로고    scopus 로고
    • Modelling approach and behavior analysis of manufacturing resources in virtual cellular manufacturing systems using resource element concept
    • Liang, F., R. Y. K. Fung, and Z. Jiang. 2011. Modelling Approach and Behavior Analysis of Manufacturing Resources in Virtual Cellular Manufacturing Systems Using Resource Element Concept. International Journal of Computer Integrated Manufacturing 24 (12): 1168-1182.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.12 , pp. 1168-1182
    • Liang, F.1    Fung, R.Y.K.2    Jiang, Z.3
  • 28
    • 33645784856 scopus 로고    scopus 로고
    • Distribution planning decisions using interactive fuzzy multi-objective linear programming
    • Liang, T. F. 2006. Distribution Planning Decisions Using Interactive Fuzzy Multi-Objective Linear Programming. Fuzzy Sets and Systems 157 (10): 1303-1316.
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.10 , pp. 1303-1316
    • Liang, T.F.1
  • 29
    • 77950594680 scopus 로고    scopus 로고
    • Supplier selection model using taguchi loss function, analytical hierarchy process and multi-choice goal programming
    • Liao, C. N., and H. P. Kao. 2010. Supplier Selection Model Using Taguchi Loss Function, Analytical Hierarchy Process and Multi-Choice Goal Programming. Computers & Industrial Engineering 58 (4): 571577.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.4 , pp. 571577
    • Liao, C.N.1    Kao, H.P.2
  • 30
    • 33746832269 scopus 로고
    • Fuzzy optimization: An appraisal
    • Luhandjula, M. K. 1989. Fuzzy Optimization: An Appraisal. Fuzzy Sets and Systems 30 (3): 257-282.
    • (1989) Fuzzy Sets and Systems , vol.30 , Issue.3 , pp. 257-282
    • Luhandjula, M.K.1
  • 31
    • 77955423703 scopus 로고    scopus 로고
    • Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment
    • Mahdavi, I., A. Aalaei, M. M. Paydar, and M. Solimanpur. 2010. Designing a Mathematical Model for Dynamic Cellular Manufacturing Systems Considering Production Planning and Worker Assignment. Computers and Mathematics with Applications 60 (4): 1014-1025.
    • (2010) Computers and Mathematics with Applications , vol.60 , Issue.4 , pp. 1014-1025
    • Mahdavi, I.1    Aalaei, A.2    Paydar, M.M.3    Solimanpur, M.4
  • 32
    • 80052985872 scopus 로고    scopus 로고
    • Multi-objective cell formation and production planning in dynamic virtual cellular manufacturing systems
    • Mahdavi, I., A. Aalaei, M. M. Paydar, and M. Solimanpur. 2011. Multi-Objective Cell Formation and Production Planning in Dynamic Virtual Cellular Manufacturing Systems. International Journal of Production Research 49 (21): 6517-6537.
    • (2011) International Journal of Production Research , vol.49 , Issue.21 , pp. 6517-6537
    • Mahdavi, I.1    Aalaei, A.2    Paydar, M.M.3    Solimanpur, M.4
  • 33
    • 34547515967 scopus 로고    scopus 로고
    • An ant colony optimization algorithm for scheduling virtual cellular manufacturing systems
    • Mak, K. L., X. X. Peng, and T. L. Lau. 2007. An Ant Colony Optimization Algorithm for Scheduling Virtual Cellular Manufacturing Systems. International Journal of Computer Integrated Manufacturing 20 (6): 524-537.
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.6 , pp. 524-537
    • Mak, K.L.1    Peng, X.X.2    Lau, T.L.3
  • 37
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula, J., R. Poler, and J. P. Garcia. 2006. MRP with Flexible Constraints: A Fuzzy Mathematical Programming Approach. Fuzzy Sets and Systems 157 (1): 74-97.
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.1 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.P.3
  • 38
    • 33744515311 scopus 로고    scopus 로고
    • Virtual manufacturing cells: A taxonomy of past research and identification of future research
    • Nomden, G., J. Slomp, and N. C. Suresh. 2006. Virtual Manufacturing Cells: A Taxonomy of Past Research and Identification of Future Research. International Journal of Flexible Manufacturing Systems 17 (2): 71-92.
    • (2006) International Journal of Flexible Manufacturing Systems , vol.17 , Issue.2 , pp. 71-92
    • Nomden, G.1    Slomp, J.2    Suresh, N.C.3
  • 39
    • 84857120364 scopus 로고    scopus 로고
    • A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates
    • Noori-Darvish, S., I. Mahdavi, and N. Mahdavi-Amiri. 2012. A Bi-Objective Possibilistic Programming Model for Open Shop Scheduling Problems with Sequence-Dependent Setup Times, Fuzzy Processing Times, and Fuzzy Due Dates. Applied Soft Computing 12 (4): 1399-1416.
    • (2012) Applied Soft Computing , vol.12 , Issue.4 , pp. 1399-1416
    • Noori-Darvish, S.1    Mahdavi, I.2    Mahdavi-Amiri, N.3
  • 40
    • 77952951945 scopus 로고    scopus 로고
    • Revised multi-choice goal programming for multi-period, multi-stage inventory controlled supply chain model with popup stores in guerrilla marketing
    • Paksoy, T., and C. T. Chang. 2010. Revised Multi-Choice Goal Programming for Multi-Period, Multi-Stage Inventory Controlled Supply Chain Model with Popup Stores in Guerrilla Marketing. Applied Mathematical Modelling 34 (11): 3586-3598.
    • (2010) Applied Mathematical Modelling , vol.34 , Issue.11 , pp. 3586-3598
    • Paksoy, T.1    Chang, C.T.2
  • 41
    • 70350574005 scopus 로고    scopus 로고
    • Robust supply chain design under uncertain demand in agile manufacturing
    • Pan, F., and R. Nagi. 2010. Robust Supply Chain Design Under Uncertain Demand in Agile Manufacturing. Computers & Operations Research 37 (4): 668-683.
    • (2010) Computers & Operations Research , vol.37 , Issue.4 , pp. 668-683
    • Pan, F.1    Nagi, R.2
  • 42
    • 84872422771 scopus 로고    scopus 로고
    • A hybrid genetic-variable neighborhood search algorithm for the cell formation problem based on grouping efficacy
    • Paydar, M. M., and M. Saidi-Mehrabad. 2013. A Hybrid Genetic-Variable Neighborhood Search Algorithm for the Cell Formation Problem Based on Grouping Efficacy. Computers & Operations Research 40 (4): 980-990.
    • (2013) Computers & Operations Research , vol.40 , Issue.4 , pp. 980-990
    • Paydar, M.M.1    Saidi-Mehrabad, M.2
  • 43
    • 84900833306 scopus 로고    scopus 로고
    • A robust optimisation model for generalised cell formation problem considering machine layout and supplier selection
    • Paydar, M. M., M. Saidi-Mehrabad, and E. Teimoury. 2013. A Robust Optimisation Model for Generalised Cell Formation Problem Considering Machine Layout and Supplier Selection. International Journal of Computer Integrated Manufacturing. http://dx.doi.org/10.1080/ 0951192X.2013.834476.
    • (2013) International Journal of Computer Integrated Manufacturing
    • Paydar, M.M.1    Saidi-Mehrabad, M.2    Teimoury, E.3
  • 44
    • 51749124427 scopus 로고    scopus 로고
    • A robust cellular manufacturing system design for dynamic part population using a genetic algorithm
    • Pillai, V. M., and K. Subbarao. 2008. A Robust Cellular Manufacturing System Design for Dynamic Part Population Using a Genetic Algorithm. International Journal of Production Research 46 (18): 51915210.
    • (2008) International Journal of Production Research , vol.46 , Issue.18 , pp. 51915210
    • Pillai, V.M.1    Subbarao, K.2
  • 45
    • 84859808210 scopus 로고    scopus 로고
    • Environmental supply chain network design using multi-objective fuzzy mathematical programming
    • Pishvaee, M. R., and J. Jafar Razmi. 2012. Environmental Supply Chain Network Design Using Multi-Objective Fuzzy Mathematical Programming. Applied Mathematical Modelling 36 (8): 3433-3446.
    • (2012) Applied Mathematical Modelling , vol.36 , Issue.8 , pp. 3433-3446
    • Pishvaee, M.R.1    Jafar Razmi, J.2
  • 46
    • 77955681026 scopus 로고    scopus 로고
    • A possibilistic programming approach for closed-loop supply chain network design under uncertainty
    • Pishvaee, M. S., and S. A. Torabi. 2010. A Possibilistic Programming Approach for Closed-Loop Supply Chain Network Design Under Uncertainty. Fuzzy Sets and Systems 161 (20): 2668-2683.
    • (2010) Fuzzy Sets and Systems , vol.161 , Issue.20 , pp. 2668-2683
    • Pishvaee, M.S.1    Torabi, S.A.2
  • 47
    • 78650294226 scopus 로고    scopus 로고
    • A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system
    • Rafiee, K., M. Rabbani, H. Rafiei, and A. Rahimi-Vahed. 2011. A New Approach Towards Integrated Cell Formation and Inventory Lot Sizing in an Unreliable Cellular Manufacturing System. Applied Mathematical Modelling 35 (4): 1810-1819.
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.4 , pp. 1810-1819
    • Rafiee, K.1    Rabbani, M.2    Rafiei, H.3    Rahimi-Vahed, A.4
  • 48
    • 0347568304 scopus 로고    scopus 로고
    • Impact of cellular manufacturing on supply chain management: Exploration of interrelationships between design issues
    • Rao, P. P., and R. P. Mohanty. 2003. Impact of Cellular Manufacturing on Supply Chain Management: Exploration of Interrelationships Between Design Issues. International Journal of Manufacturing Technology Management 5 (5/6): 507-520.
    • (2003) International Journal of Manufacturing Technology Management , vol.5 , Issue.5-6 , pp. 507-520
    • Rao, P.P.1    Mohanty, R.P.2
  • 49
    • 0029369874 scopus 로고
    • Physically reconfigurable virtual cells: A dynamic model for a highly dynamic environment
    • Rheault, M., J. Drolet, and G. Abdulnour. 1995. Physically Reconfigurable Virtual Cells: A Dynamic Model for a Highly Dynamic Environment. Computers & Industrial Engineering 29 (1-4): 221-225.
    • (1995) Computers & Industrial Engineering , vol.29 , Issue.1-4 , pp. 221-225
    • Rheault, M.1    Drolet, J.2    Abdulnour, G.3
  • 50
    • 34548850594 scopus 로고    scopus 로고
    • A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system
    • Safaei, N., M. Saidi-Mehrabad, and M. S. Jabal-Ameli. 2008. A Hybrid Simulated Annealing for Solving an Extended Model of Dynamic Cellular Manufacturing System. European Journal of Operational Research 185 (2): 563-592.
    • (2008) European Journal of Operational Research , vol.185 , Issue.2 , pp. 563-592
    • Safaei, N.1    Saidi-Mehrabad, M.2    Jabal-Ameli, M.S.3
  • 51
    • 70449556659 scopus 로고    scopus 로고
    • An extended fuzzy parametric programming-based approach for designing cellular manufacturing systems under uncertainty and dynamic conditions
    • Safaei, N., and R. Tavakkoli-Moghaddam. 2009. An Extended Fuzzy Parametric Programming-Based Approach for Designing Cellular Manufacturing Systems Under Uncertainty and Dynamic Conditions. International Journal of Computer Integrated Manufacturing 22 (6): 538-548.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , Issue.6 , pp. 538-548
    • Safaei, N.1    Tavakkoli-Moghaddam, R.2
  • 52
    • 81555213539 scopus 로고    scopus 로고
    • Multi-objective supply planning for two-level assembly systems with stochastic lead times
    • Sakiani, R., S. M. T. FatemiGhomi, and M. Zandieh. 2012. Multi-Objective Supply Planning for Two-Level Assembly Systems with Stochastic Lead Times. Computers & Operations Research 39 (7): 1325-1332.
    • (2012) Computers & Operations Research , vol.39 , Issue.7 , pp. 1325-1332
    • Sakiani, R.1    Fatemighomi, S.M.T.2    Zandieh, M.3
  • 53
    • 0035364433 scopus 로고    scopus 로고
    • Job routing and operations scheduling: A network-based virtual cell formation approach
    • Sarker, B. R., and Z. Li. 2001. Job Routing and Operations Scheduling: A Network-Based Virtual Cell Formation Approach. Journal of the Operational Research Society 52 (6): 673-681.
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.6 , pp. 673-681
    • Sarker, B.R.1    Li., Z.2
  • 54
    • 84865373792 scopus 로고    scopus 로고
    • An integrated model of dynamic cellular manufacturing and supply chain system design
    • Saxena, L. K., and P. K. Jain. 2012. An Integrated Model of Dynamic Cellular Manufacturing and Supply Chain System Design. International Journal of Advanced Manufacturing Technology 62 (1-4): 385-404.
    • (2012) International Journal of Advanced Manufacturing Technology , vol.62 , Issue.1-4 , pp. 385-404
    • Saxena, L.K.1    Jain, P.K.2
  • 55
    • 48249132473 scopus 로고    scopus 로고
    • Incorporating cellular manufacturing into supply chain design
    • Schaller, J. 2008. Incorporating Cellular Manufacturing Into Supply Chain Design. International Journal of Production Research 46 (17): 4925-4945.
    • (2008) International Journal of Production Research , vol.46 , Issue.17 , pp. 4925-4945
    • Schaller, J.1
  • 56
    • 39049110961 scopus 로고    scopus 로고
    • A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach
    • Selim, H., and I. Ozkarahan. 2008. A Supply Chain Distribution Network Design Model: An Interactive Fuzzy Goal Programming-Based Solution Approach. International Journal of Advanced Manufacturing Technology 36 (3-4): 401-418.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.3-4 , pp. 401-418
    • Selim, H.1    Ozkarahan, I.2
  • 58
    • 0032306640 scopus 로고    scopus 로고
    • Goal programming for decision making: An overview of the current state-ofthe-art
    • Tamiz, M., D. Jones, and C. Romero. 1998. Goal Programming for Decision Making: An Overview of the Current State-ofthe-Art. European Journal of Operational Research 111 (3): 569-581.
    • (1998) European Journal of Operational Research , vol.111 , Issue.3 , pp. 569-581
    • Tamiz, M.1    Jones, D.2    Romero, C.3
  • 59
    • 0021424468 scopus 로고
    • Fuzzy linear programming problems with fuzzy numbers
    • Tanaka, H., and K. Asai. 1984. Fuzzy Linear Programming Problems with Fuzzy Numbers. Fuzzy Sets and Systems 13 (1): 1-10.
    • (1984) Fuzzy Sets and Systems , vol.13 , Issue.1 , pp. 1-10
    • Tanaka, H.1    Asai, K.2
  • 60
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply chain master planning
    • Torabi, S. A., and E. Hassini. 2008. An Interactive Possibilistic Programming Approach for Multiple Objective Supply Chain Master Planning. Fuzzy Sets and Systems 159 (2): 193-214.
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.2 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 62
    • 0024731850 scopus 로고
    • Cellular Manufacturing in the US Industry: A Survey of Users
    • Wemmerlov, U., and N. L. Hyer. 1989. Cellular Manufacturing in the US Industry: A Survey of Users. International Journal of Production Research 27 (9): 1511-1530.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1511-1530
    • Wemmerlov, U.1    Hyer, N.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.