메뉴 건너뛰기




Volumn 12, Issue 4, 2012, Pages 1399-1416

A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates

Author keywords

Fuzzy parameters; Open shop scheduling problem; Particle swarm optimization; Possibilistic programming; Sequence dependent setup times; Total weighted completion times; Total weighted tardiness

Indexed keywords

FUZZY PARAMETER; OPEN SHOP SCHEDULING PROBLEM; PARTICLE SWARM; POSSIBILISTIC PROGRAMMING; SEQUENCE-DEPENDENT SETUP TIME; TOTAL-WEIGHTED TARDINESS; WEIGHTED COMPLETION;

EID: 84857120364     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2011.11.019     Document Type: Article
Times cited : (43)

References (36)
  • 2
    • 0017012325 scopus 로고
    • Open shop scheduling to minimize finish time
    • T. Gonzalez, and S. Sahni Open shop scheduling to minimize finish time Journal of the ACM 23 4 1976 665 679
    • (1976) Journal of the ACM , vol.23 , Issue.4 , pp. 665-679
    • Gonzalez, T.1    Sahni, S.2
  • 4
    • 68349083485 scopus 로고    scopus 로고
    • Group shops scheduling with make span criterion subject to random release dates and processing times
    • F. Ahmadizar, M. Ghazanfari, and S.M.T. Fatemi Ghomi Group shops scheduling with make span criterion subject to random release dates and processing times Computers & Operations Research 37 2010 152 162
    • (2010) Computers & Operations Research , vol.37 , pp. 152-162
    • Ahmadizar, F.1    Ghazanfari, M.2    Fatemi Ghomi, S.M.T.3
  • 7
    • 76549093620 scopus 로고    scopus 로고
    • A planning and scheduling problem for an operating theatre using an open scheduling strategy
    • H. Fei, N. Meskens, and C. Chu A planning and scheduling problem for an operating theatre using an open scheduling strategy Computers & Industrial Engineering 58 2010 221 230
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 221-230
    • Fei, H.1    Meskens, N.2    Chu, C.3
  • 8
    • 60349120665 scopus 로고    scopus 로고
    • A genetic algorithm for the proportionate multiprocessor open shop
    • M.E. Matta A genetic algorithm for the proportionate multiprocessor open shop Computers & Operations Research 36 2009 2601 2618
    • (2009) Computers & Operations Research , vol.36 , pp. 2601-2618
    • Matta, M.E.1
  • 9
    • 40249116814 scopus 로고    scopus 로고
    • A new particle swarm optimization for the open shop scheduling problem
    • DOI 10.1016/j.cor.2007.02.019, PII S030505480700055X
    • D.Y. Sha, and C.Y. Hsu A new particle swarm optimization for the open shop scheduling problem Computers & Operations Research 35 2008 3243 3261 (Pubitemid 351335144)
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3243-3261
    • Sha, D.Y.1    Hsu, C.-Y.2
  • 10
    • 73249123917 scopus 로고    scopus 로고
    • A tabu search method for a new bi-objective open shop scheduling problem by a fuzzy multi-objective decision making approach
    • O. Seraj, and R. Tavakkoli-Moghaddam A tabu search method for a new bi-objective open shop scheduling problem by a fuzzy multi-objective decision making approach International Journal of Engineering Transaction B: Application 22 2009 269 282
    • (2009) International Journal of Engineering Transaction B: Application , vol.22 , pp. 269-282
    • Seraj, O.1    Tavakkoli-Moghaddam, R.2
  • 13
    • 63149128570 scopus 로고    scopus 로고
    • Particle swarm optimization with preference order ranking for multi-objective optimization
    • Y. Wang, and Y. Yang Particle swarm optimization with preference order ranking for multi-objective optimization Information Sciences 179 2009 1944 1959
    • (2009) Information Sciences , vol.179 , pp. 1944-1959
    • Wang, Y.1    Yang, Y.2
  • 14
    • 79959956930 scopus 로고    scopus 로고
    • Handling multi-objective optimization problems with a multi-swarm cooperative particle swarm optimizer
    • Y. Zhang, D. Gong, and Z. Ding Handling multi-objective optimization problems with a multi-swarm cooperative particle swarm optimizer Expert Systems with Applications 38 11 2011 13933 13941
    • (2011) Expert Systems with Applications , vol.38 , Issue.11 , pp. 13933-13941
    • Zhang, Y.1    Gong, D.2    Ding, Z.3
  • 15
    • 70349571849 scopus 로고    scopus 로고
    • Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristic
    • V. Roshanaei, M.M. Seyyed Esfehani, and M. Zandieh Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristic Expert Systems with Applications 37 2009 259 266
    • (2009) Expert Systems with Applications , vol.37 , pp. 259-266
    • Roshanaei, V.1    Seyyed Esfehani, M.M.2    Zandieh, M.3
  • 16
    • 63749099056 scopus 로고    scopus 로고
    • Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated
    • C. Low, and Y. Yeh Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated Robotics and Computer-Integrated Manufacturing 25 2008 314 322
    • (2008) Robotics and Computer-Integrated Manufacturing , vol.25 , pp. 314-322
    • Low, C.1    Yeh, Y.2
  • 17
    • 36849021148 scopus 로고    scopus 로고
    • Open-shop batch scheduling with identical jobs
    • DOI 10.1016/j.ejor.2006.03.068, PII S037722170600837X
    • G. Mosheiov, and D. Oron Open-shop batch scheduling with identical jobs European Journal of Operational Research 187 2008 1282 1292 (Pubitemid 350236637)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1282-1292
    • Mosheiov, G.1    Oron, D.2
  • 18
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply chain master planning
    • DOI 10.1016/j.fss.2007.08.010, PII S0165011407003739, Theme: Games and Decision
    • S.A. Torabi, and E. Hassini An interactive possibilistic programming approach for multiple objective supply chain master planning Fuzzy Sets and Systems 159 2008 193 214 (Pubitemid 350026610)
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.2 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 19
    • 0039330850 scopus 로고    scopus 로고
    • An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint
    • T. Konno, and H. Ishii An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint Fuzzy Sets and Systems 109 2000 141 147
    • (2000) Fuzzy Sets and Systems , vol.109 , pp. 141-147
    • Konno, T.1    Ishii, H.2
  • 21
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Y.J. Lai, and C.L. Hwang A new approach to some possibilistic linear programming problems Fuzzy Sets and Systems 49 1992 121 133
    • (1992) Fuzzy Sets and Systems , vol.49 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 25
    • 84857115504 scopus 로고    scopus 로고
    • A multi objective particle swarm optimization algorithm for a possibilistic open shop problem to minimize weighted mean tardiness and weighted mean completion times
    • in press
    • S. Noori Darvish, R. Tavakkoli-Moghaddam, N. Javadian, A multi objective particle swarm optimization algorithm for a possibilistic open shop problem to minimize weighted mean tardiness and weighted mean completion times, Iranian Journal of Operations Research (IJOR) in press.
    • Iranian Journal of Operations Research (IJOR)
    • Noori Darvish, S.1    Tavakkoli-Moghaddam, R.2    Javadian, N.3
  • 26
    • 33751090978 scopus 로고    scopus 로고
    • A multi-objective particle swarm for a flow shop scheduling problem
    • DOI 10.1007/s10878-006-9015-7
    • A.R. Rahimi-Vahed, and S.M. Mirghorbani A multi-objective particle swarm for a flow shop scheduling problem Journal of Combinatorial Optimization 13 2007 79 102 (Pubitemid 44771158)
    • (2007) Journal of Combinatorial Optimization , vol.13 , Issue.1 , pp. 79-102
    • Rahimi-Vahed, A.R.1    Mirghorbani, S.M.2
  • 27
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multi-objective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2002 182 197 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 30
    • 0004140075 scopus 로고    scopus 로고
    • SPEA2. Improving the strength Pareto evolutionary algorithm, Computer Engineering and Networks Laboratory (TIK)
    • September
    • E. Zitzler, M. Laumanns, L. Thiele, SPEA2. Improving the strength Pareto evolutionary algorithm, Computer Engineering and Networks Laboratory (TIK), Report 103, September 2001.
    • (2001) Report 103
    • Zitzler, E.1    Laumanns, M.2    Thiele, L.3
  • 31
  • 34
    • 0000852513 scopus 로고
    • Multi-objective optimization using non-dominated sorting in genetic algorithms
    • N. Srinivas, and K. Deb Multi-objective optimization using non-dominated sorting in genetic algorithms Evolutionary Computation 2 1994 221 248
    • (1994) Evolutionary Computation , vol.2 , pp. 221-248
    • Srinivas, N.1    Deb, K.2
  • 36
    • 75849165458 scopus 로고    scopus 로고
    • Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan
    • B. Naderi, R. Tavakkoli-Moghaddam, and M. Khalili Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan Knowledge-Based Systems 23 2010 77 85
    • (2010) Knowledge-Based Systems , vol.23 , pp. 77-85
    • Naderi, B.1    Tavakkoli-Moghaddam, R.2    Khalili, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.