-
2
-
-
0017012325
-
Open shop scheduling to minimize finish time
-
T. Gonzalez, and S. Sahni Open shop scheduling to minimize finish time Journal of the ACM 23 4 1976 665 679
-
(1976)
Journal of the ACM
, vol.23
, Issue.4
, pp. 665-679
-
-
Gonzalez, T.1
Sahni, S.2
-
4
-
-
68349083485
-
Group shops scheduling with make span criterion subject to random release dates and processing times
-
F. Ahmadizar, M. Ghazanfari, and S.M.T. Fatemi Ghomi Group shops scheduling with make span criterion subject to random release dates and processing times Computers & Operations Research 37 2010 152 162
-
(2010)
Computers & Operations Research
, vol.37
, pp. 152-162
-
-
Ahmadizar, F.1
Ghazanfari, M.2
Fatemi Ghomi, S.M.T.3
-
6
-
-
77957899966
-
Minimizing the sum of weighted completion times in a concurrent open shop
-
M. Mastrolilli, M. Queyranne, A.S. Schulz, O. Svensson, and N.A. Uhan Minimizing the sum of weighted completion times in a concurrent open shop Operations Research Letters 38 5 2010 390 395
-
(2010)
Operations Research Letters
, vol.38
, Issue.5
, pp. 390-395
-
-
Mastrolilli, M.1
Queyranne, M.2
Schulz, A.S.3
Svensson, O.4
Uhan, N.A.5
-
7
-
-
76549093620
-
A planning and scheduling problem for an operating theatre using an open scheduling strategy
-
H. Fei, N. Meskens, and C. Chu A planning and scheduling problem for an operating theatre using an open scheduling strategy Computers & Industrial Engineering 58 2010 221 230
-
(2010)
Computers & Industrial Engineering
, vol.58
, pp. 221-230
-
-
Fei, H.1
Meskens, N.2
Chu, C.3
-
8
-
-
60349120665
-
A genetic algorithm for the proportionate multiprocessor open shop
-
M.E. Matta A genetic algorithm for the proportionate multiprocessor open shop Computers & Operations Research 36 2009 2601 2618
-
(2009)
Computers & Operations Research
, vol.36
, pp. 2601-2618
-
-
Matta, M.E.1
-
9
-
-
40249116814
-
A new particle swarm optimization for the open shop scheduling problem
-
DOI 10.1016/j.cor.2007.02.019, PII S030505480700055X
-
D.Y. Sha, and C.Y. Hsu A new particle swarm optimization for the open shop scheduling problem Computers & Operations Research 35 2008 3243 3261 (Pubitemid 351335144)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3243-3261
-
-
Sha, D.Y.1
Hsu, C.-Y.2
-
10
-
-
73249123917
-
A tabu search method for a new bi-objective open shop scheduling problem by a fuzzy multi-objective decision making approach
-
O. Seraj, and R. Tavakkoli-Moghaddam A tabu search method for a new bi-objective open shop scheduling problem by a fuzzy multi-objective decision making approach International Journal of Engineering Transaction B: Application 22 2009 269 282
-
(2009)
International Journal of Engineering Transaction B: Application
, vol.22
, pp. 269-282
-
-
Seraj, O.1
Tavakkoli-Moghaddam, R.2
-
13
-
-
63149128570
-
Particle swarm optimization with preference order ranking for multi-objective optimization
-
Y. Wang, and Y. Yang Particle swarm optimization with preference order ranking for multi-objective optimization Information Sciences 179 2009 1944 1959
-
(2009)
Information Sciences
, vol.179
, pp. 1944-1959
-
-
Wang, Y.1
Yang, Y.2
-
14
-
-
79959956930
-
Handling multi-objective optimization problems with a multi-swarm cooperative particle swarm optimizer
-
Y. Zhang, D. Gong, and Z. Ding Handling multi-objective optimization problems with a multi-swarm cooperative particle swarm optimizer Expert Systems with Applications 38 11 2011 13933 13941
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.11
, pp. 13933-13941
-
-
Zhang, Y.1
Gong, D.2
Ding, Z.3
-
15
-
-
70349571849
-
Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristic
-
V. Roshanaei, M.M. Seyyed Esfehani, and M. Zandieh Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristic Expert Systems with Applications 37 2009 259 266
-
(2009)
Expert Systems with Applications
, vol.37
, pp. 259-266
-
-
Roshanaei, V.1
Seyyed Esfehani, M.M.2
Zandieh, M.3
-
16
-
-
63749099056
-
Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated
-
C. Low, and Y. Yeh Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated Robotics and Computer-Integrated Manufacturing 25 2008 314 322
-
(2008)
Robotics and Computer-Integrated Manufacturing
, vol.25
, pp. 314-322
-
-
Low, C.1
Yeh, Y.2
-
17
-
-
36849021148
-
Open-shop batch scheduling with identical jobs
-
DOI 10.1016/j.ejor.2006.03.068, PII S037722170600837X
-
G. Mosheiov, and D. Oron Open-shop batch scheduling with identical jobs European Journal of Operational Research 187 2008 1282 1292 (Pubitemid 350236637)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1282-1292
-
-
Mosheiov, G.1
Oron, D.2
-
18
-
-
35649000310
-
An interactive possibilistic programming approach for multiple objective supply chain master planning
-
DOI 10.1016/j.fss.2007.08.010, PII S0165011407003739, Theme: Games and Decision
-
S.A. Torabi, and E. Hassini An interactive possibilistic programming approach for multiple objective supply chain master planning Fuzzy Sets and Systems 159 2008 193 214 (Pubitemid 350026610)
-
(2008)
Fuzzy Sets and Systems
, vol.159
, Issue.2
, pp. 193-214
-
-
Torabi, S.A.1
Hassini, E.2
-
19
-
-
0039330850
-
An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint
-
T. Konno, and H. Ishii An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint Fuzzy Sets and Systems 109 2000 141 147
-
(2000)
Fuzzy Sets and Systems
, vol.109
, pp. 141-147
-
-
Konno, T.1
Ishii, H.2
-
21
-
-
0026898945
-
A new approach to some possibilistic linear programming problems
-
Y.J. Lai, and C.L. Hwang A new approach to some possibilistic linear programming problems Fuzzy Sets and Systems 49 1992 121 133
-
(1992)
Fuzzy Sets and Systems
, vol.49
, pp. 121-133
-
-
Lai, Y.J.1
Hwang, C.L.2
-
25
-
-
84857115504
-
A multi objective particle swarm optimization algorithm for a possibilistic open shop problem to minimize weighted mean tardiness and weighted mean completion times
-
in press
-
S. Noori Darvish, R. Tavakkoli-Moghaddam, N. Javadian, A multi objective particle swarm optimization algorithm for a possibilistic open shop problem to minimize weighted mean tardiness and weighted mean completion times, Iranian Journal of Operations Research (IJOR) in press.
-
Iranian Journal of Operations Research (IJOR)
-
-
Noori Darvish, S.1
Tavakkoli-Moghaddam, R.2
Javadian, N.3
-
26
-
-
33751090978
-
A multi-objective particle swarm for a flow shop scheduling problem
-
DOI 10.1007/s10878-006-9015-7
-
A.R. Rahimi-Vahed, and S.M. Mirghorbani A multi-objective particle swarm for a flow shop scheduling problem Journal of Combinatorial Optimization 13 2007 79 102 (Pubitemid 44771158)
-
(2007)
Journal of Combinatorial Optimization
, vol.13
, Issue.1
, pp. 79-102
-
-
Rahimi-Vahed, A.R.1
Mirghorbani, S.M.2
-
27
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-II
-
DOI 10.1109/4235.996017, PII S1089778X02041012
-
K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multi-objective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2002 182 197 (Pubitemid 34555372)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
28
-
-
84857111904
-
-
Master of Science (MS) research, Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
-
M. Aramoon-Bajestani, A multi objective meta-heuristic for parallel machine with sequence-dependent and fuzzy processing time, Master of Science (MS) research, Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran, 2009.
-
(2009)
A Multi Objective Meta-heuristic for Parallel Machine with Sequence-dependent and Fuzzy Processing Time
-
-
Aramoon-Bajestani, M.1
-
29
-
-
2942547409
-
SPEA2. Improving the strength pareto evolutionary algorithm
-
K. Giannakoglou, D. Tsahalis, J. Periaux, P. Papailou, T. Fogarty, Athens, Greece
-
E. Zitzler, M. Laumanns, and L. Thiele SPEA2. Improving the strength pareto evolutionary algorithm K. Giannakoglou, D. Tsahalis, J. Periaux, P. Papailou, T. Fogarty, EUROGEN 2001, Evolutionary Methods for Design, Optimization and Control with Applications to Industrial Problems Athens, Greece 2001 95 100
-
(2001)
EUROGEN 2001, Evolutionary Methods for Design, Optimization and Control with Applications to Industrial Problems
, pp. 95-100
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
-
30
-
-
0004140075
-
SPEA2. Improving the strength Pareto evolutionary algorithm, Computer Engineering and Networks Laboratory (TIK)
-
September
-
E. Zitzler, M. Laumanns, L. Thiele, SPEA2. Improving the strength Pareto evolutionary algorithm, Computer Engineering and Networks Laboratory (TIK), Report 103, September 2001.
-
(2001)
Report 103
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
-
33
-
-
0003482385
-
-
Ph.D. Dissertation, Swiss Federal Institute of Technology (ETH), Zurich, Switzerland
-
E. Zitzler, L. Thiele, Evolutionary Algorithm for Multi-Objective Optimization: Methods and Applications, Ph.D. Dissertation, Swiss Federal Institute of Technology (ETH), Zurich, Switzerland, (1999).
-
(1999)
Evolutionary Algorithm for Multi-Objective Optimization: Methods and Applications
-
-
Zitzler, E.1
Thiele, L.2
-
34
-
-
0000852513
-
Multi-objective optimization using non-dominated sorting in genetic algorithms
-
N. Srinivas, and K. Deb Multi-objective optimization using non-dominated sorting in genetic algorithms Evolutionary Computation 2 1994 221 248
-
(1994)
Evolutionary Computation
, vol.2
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
36
-
-
75849165458
-
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan
-
B. Naderi, R. Tavakkoli-Moghaddam, and M. Khalili Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan Knowledge-Based Systems 23 2010 77 85
-
(2010)
Knowledge-Based Systems
, vol.23
, pp. 77-85
-
-
Naderi, B.1
Tavakkoli-Moghaddam, R.2
Khalili, M.3
|