-
1
-
-
70449517498
-
Genetic algorithm for supply planning in two-level assembly systems with random lead times
-
F. Hnaien, X. Delorme, and A. Dolgui Genetic algorithm for supply planning in two-level assembly systems with random lead times Engineering Applications of Artificial Intelligence 22 6 2009 906 915
-
(2009)
Engineering Applications of Artificial Intelligence
, vol.22
, Issue.6
, pp. 906-915
-
-
Hnaien, F.1
Delorme, X.2
Dolgui, A.3
-
2
-
-
77951295681
-
Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
-
F. Hnaien, X. Delorme, and A. Dolgui Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times Computers and Operations Research 37 11 2010 1835 1843
-
(2010)
Computers and Operations Research
, vol.37
, Issue.11
, pp. 1835-1843
-
-
Hnaien, F.1
Delorme, X.2
Dolgui, A.3
-
5
-
-
0031249189
-
Supply management for cost minimization in assembly systems with random component yield times
-
J.M. Proth, G. Mauroy, Y. Wardi, C. Chu, and X.L. Xie Supply management for cost minimization in assembly systems with random component yield times Journal of Intelligent Manufacturing 8 5 1997 385 403 (Pubitemid 127506254)
-
(1997)
Journal of Intelligent Manufacturing
, vol.8
, Issue.5
, pp. 385-403
-
-
Proth, J.M.1
Mauroy, G.2
Wardi, Y.3
Chu, C.4
Xie, X.L.5
-
6
-
-
0037146389
-
Generalized newsboy model to compute the optimal planned lead times in assembly systems
-
M.A. Ould-Louly, and A. Dolgui Generalized newsboy model to compute the optimal planned lead times in assembly systems International Journal of Production Research 40 17 2002 4401 4414
-
(2002)
International Journal of Production Research
, vol.40
, Issue.17
, pp. 4401-4414
-
-
Ould-Louly, M.A.1
Dolgui, A.2
-
8
-
-
0037431665
-
The detailed coordination problem in a two-level assembly system with stochastic lead times
-
DOI 10.1016/S0925-5273(02)00296-7, PII S0925527302002967
-
O. Tang, and R.W. Grubbström The detailed coordination problem in a two-level assembly system with stochastic lead times International Journal of Production Economics 8182 2003 415 429 (Pubitemid 35385378)
-
(2003)
International Journal of Production Economics
, vol.81-82
, pp. 415-429
-
-
Tang, O.1
Grubbstrom, R.W.2
-
9
-
-
17444390501
-
Planning order releases for an assembly system with random operation times
-
DOI 10.1007/s00291-004-0186-2
-
S. Axsäter Planning order releases for an assembly system with random operation times OR Spectrum 27 23 2005 459 470 (Pubitemid 40550384)
-
(2005)
OR Spectrum
, vol.27
, Issue.2-3
, pp. 459-470
-
-
Axsater, S.1
-
10
-
-
67651157035
-
A continuous model for supply planning of assembly systems with stochastic component procurement times
-
S.S. Chauhan, A. Dolgui, and J.M. Proth A continuous model for supply planning of assembly systems with stochastic component procurement times International Journal of Production Economics 120 2 2009 411 417
-
(2009)
International Journal of Production Economics
, vol.120
, Issue.2
, pp. 411-417
-
-
Chauhan, S.S.1
Dolgui, A.2
Proth, J.M.3
-
11
-
-
49049110237
-
Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
-
M.A. Louly, A. Dolgui, and F. Hnaien Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint International Journal of Production Economics 115 1 2008 236 247
-
(2008)
International Journal of Production Economics
, vol.115
, Issue.1
, pp. 236-247
-
-
Louly, M.A.1
Dolgui, A.2
Hnaien, F.3
-
12
-
-
67349171899
-
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
-
M.A.O. Louly, and A. Dolgui Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm European Journal of Operational Research 199 3 2009 723 731
-
(2009)
European Journal of Operational Research
, vol.199
, Issue.3
, pp. 723-731
-
-
Louly, M.A.O.1
Dolgui, A.2
-
13
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-II
-
DOI 10.1109/4235.996017, PII S1089778X02041012
-
K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multiobjective genetic algorithm: NSGA-II Evolutionary Computation, IEEE Transactions on 6 2 2002 182 197 (Pubitemid 34555372)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
14
-
-
0033318858
-
Multiobjective evolutionary algorithms a comparative case study and the strength pareto approach
-
DOI 10.1109/4235.797969
-
E. Zitzler, and L. Thiele Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach IEEE Transactions on Evolutionary Computation 3 4 1999 257 271 (Pubitemid 30544879)
-
(1999)
IEEE Transactions on Evolutionary Computation
, vol.3
, Issue.4
, pp. 257-271
-
-
Zitzler Eckart1
Thiele Lothar2
|