-
1
-
-
0037803568
-
Crude oil blend scheduling optimization: An application with multimillion dollar benefits-Part 1
-
Kelly, J. D.; Mann, J. L. Crude oil blend scheduling optimization: An application with multimillion dollar benefits-Part 1 Hydrocarbon Processing 2003, 82 (6) 47
-
(2003)
Hydrocarbon Processing
, vol.82
, Issue.6
, pp. 47
-
-
Kelly, J.D.1
Mann, J.L.2
-
2
-
-
0029701808
-
Mathematical programming techniques for crude oil scheduling
-
Shah, N. Mathematical programming techniques for crude oil scheduling Comput. Chem. Eng. 1996, 20, S1227
-
(1996)
Comput. Chem. Eng.
, vol.20
, pp. 1227
-
-
Shah, N.1
-
3
-
-
0030151372
-
Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management
-
Lee, H.; Pinto, J. M.; Grossmann, I. E.; Park, S. Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management Ind. Eng. Chem. Res. 1996, 35, 1630
-
(1996)
Ind. Eng. Chem. Res.
, vol.35
, pp. 1630
-
-
Lee, H.1
Pinto, J.M.2
Grossmann, I.E.3
Park, S.4
-
4
-
-
84878428079
-
Refinery scheduling of crude oil unloading with tank inventory management
-
Hamisu, A. A.; Kabantiok, S.; Wang, M. Refinery scheduling of crude oil unloading with tank inventory management Comput. Chem. Eng. 2013, 55, 134
-
(2013)
Comput. Chem. Eng.
, vol.55
, pp. 134
-
-
Hamisu, A.A.1
Kabantiok, S.2
Wang, M.3
-
5
-
-
0038310819
-
Refinery short-term scheduling using continuous time formulation: Crude-oil operations
-
Jia, Z.; Ierapetritou, M.; Kelly, J. D. Refinery short-term scheduling using continuous time formulation: Crude-oil operations Ind. Eng. Chem. Res. 2003, 42, 3085
-
(2003)
Ind. Eng. Chem. Res.
, vol.42
, pp. 3085
-
-
Jia, Z.1
Ierapetritou, M.2
Kelly, J.D.3
-
6
-
-
38149057289
-
A robust event-based continuous time formulation for tank transfer scheduling
-
Furman, K.; Jia, Z.; Ierapetritou, M. G. A robust event-based continuous time formulation for tank transfer scheduling Ind. Eng. Chem. Res. 2007, 46, 9126
-
(2007)
Ind. Eng. Chem. Res.
, vol.46
, pp. 9126
-
-
Furman, K.1
Jia, Z.2
Ierapetritou, M.G.3
-
7
-
-
0347992823
-
Mixed-integer programming approach for short-term crude oil scheduling
-
Moro, J. F. L.; Pinto, J. M. Mixed-integer programming approach for short-term crude oil scheduling Ind. Eng. Chem. Res. 2004, 43, 85
-
(2004)
Ind. Eng. Chem. Res.
, vol.43
, pp. 85
-
-
Moro, J.F.L.1
Pinto, J.M.2
-
8
-
-
1642331599
-
A new continuous-time formulation for scheduling crude oil operations
-
Reddy, P. C. P.; Karimi, I. A.; Srinivasan, R. A new continuous-time formulation for scheduling crude oil operations Chem. Eng. Sci. 2004, 59, 1325
-
(2004)
Chem. Eng. Sci.
, vol.59
, pp. 1325
-
-
Reddy, P.C.P.1
Karimi, I.A.2
Srinivasan, R.3
-
9
-
-
70349306845
-
A novel priority-slot based continuous-time formulation for crude-oil scheduling problems
-
Mouret, S.; Grossmann, I. E.; Pestiaux, P. A novel priority-slot based continuous-time formulation for crude-oil scheduling problems Ind. Eng. Chem. Res. 2009, 48, 8515
-
(2009)
Ind. Eng. Chem. Res.
, vol.48
, pp. 8515
-
-
Mouret, S.1
Grossmann, I.E.2
Pestiaux, P.3
-
10
-
-
79955485197
-
Time representations and mathematical models for process scheduling problems
-
Mouret, S.; Grossmann, I. E.; Pestiaux, P. Time representations and mathematical models for process scheduling problems Comput. Chem. Eng. 2011, 35, 1038
-
(2011)
Comput. Chem. Eng.
, vol.35
, pp. 1038
-
-
Mouret, S.1
Grossmann, I.E.2
Pestiaux, P.3
-
11
-
-
83255192156
-
Continuous-time modeling and global optimization approach for scheduling of crude oil operations
-
Li, J.; Misener, R.; Floudas, C. A. Continuous-time modeling and global optimization approach for scheduling of crude oil operations AIChE J. 2012, 58, 205
-
(2012)
AIChE J.
, vol.58
, pp. 205
-
-
Li, J.1
Misener, R.2
Floudas, C.A.3
-
12
-
-
35248883941
-
Improving the robustness and efficiency of crude scheduling algorithms
-
Li, J.; Li, W.; Karimi, I. A.; Srinivasan, R. Improving the robustness and efficiency of crude scheduling algorithms AIChE J. 2007, 53, 2659
-
(2007)
AIChE J.
, vol.53
, pp. 2659
-
-
Li, J.1
Li, W.2
Karimi, I.A.3
Srinivasan, R.4
-
13
-
-
33344476205
-
Global optimization for the synthesis of integrated water systems in chemical processes
-
Karuppiah, R.; Grossmann, I. E. Global optimization for the synthesis of integrated water systems in chemical processes Comput. Chem. Eng. 2006, 30, 650
-
(2006)
Comput. Chem. Eng.
, vol.30
, pp. 650
-
-
Karuppiah, R.1
Grossmann, I.E.2
-
14
-
-
0346101524
-
Simple continuous-time formulation for short-term scheduling of batch and continuous processes
-
Castro, P. M.; Barbosa-Póvoa, A. P.; Matos, H. A.; Novais, A. Q. Simple continuous-time formulation for short-term scheduling of batch and continuous processes Ind. Eng. Chem. Res. 2004, 43, 105
-
(2004)
Ind. Eng. Chem. Res.
, vol.43
, pp. 105
-
-
Castro, P.M.1
Barbosa-Póvoa, A.P.2
Matos, H.A.3
Novais, A.Q.4
-
15
-
-
84874405537
-
Multiparametric disaggregation technique for global optimization of polynomial programming problems
-
Teles, J. P.; Castro, P. M.; Matos, H. A. Multiparametric disaggregation technique for global optimization of polynomial programming problems J. Global Optimization 2013, 55, 227
-
(2013)
J. Global Optimization
, vol.55
, pp. 227
-
-
Teles, J.P.1
Castro, P.M.2
Matos, H.A.3
-
16
-
-
84876323323
-
Global optimization of bilinear programs with a multiparametric disaggregation technique
-
Kolodziej, S.; Castro, P. M.; Grossmann, I. E. Global optimization of bilinear programs with a multiparametric disaggregation technique J. Global Optimization 2013, 57, 1039
-
(2013)
J. Global Optimization
, vol.57
, pp. 1039
-
-
Kolodziej, S.1
Castro, P.M.2
Grossmann, I.E.3
-
17
-
-
34250381644
-
Computability of global solutions to factorable nonconvex programs. Part I. Convex underestimating problems
-
McCormick, G. P. Computability of global solutions to factorable nonconvex programs. Part I. Convex underestimating problems Mathematical Programming 1976, 10, 147
-
(1976)
Mathematical Programming
, vol.10
, pp. 147
-
-
McCormick, G.P.1
-
19
-
-
11844300749
-
Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations
-
Castro, P. M.; Barbosa-Póvoa, A. P.; Novais, A. Q. Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations Ind. Eng. Chem. Res. 2005, 44, 343
-
(2005)
Ind. Eng. Chem. Res.
, vol.44
, pp. 343
-
-
Castro, P.M.1
Barbosa-Póvoa, A.P.2
Novais, A.Q.3
-
20
-
-
0041346170
-
Crude oil blend scheduling optimization: An application with multimillion dollar benefits-Part 2
-
Kelly, J. D.; Mann, J. L. Crude oil blend scheduling optimization: An application with multimillion dollar benefits-Part 2 Hydrocarbon Processing 2003, 82 (7) 72
-
(2003)
Hydrocarbon Processing
, vol.82
, Issue.7
, pp. 72
-
-
Kelly, J.D.1
Mann, J.L.2
-
21
-
-
84876343458
-
A discretization-based approach for the optimization of the multiperiod blend scheduling problem
-
Kolodziej, S. P.; Grossmann, I. E.; Furman, K. C.; Sawaya, N. W. A discretization-based approach for the optimization of the multiperiod blend scheduling problem Comput. Chem. Eng. 2013, 53, 122
-
(2013)
Comput. Chem. Eng.
, vol.53
, pp. 122
-
-
Kolodziej, S.P.1
Grossmann, I.E.2
Furman, K.C.3
Sawaya, N.W.4
-
22
-
-
57049159782
-
Scheduling of a continuous plant with recycling of byproducts: A case study from a tissue paper mill
-
Castro, P. M.; Westerlund, J.; Forssell, S. Scheduling of a continuous plant with recycling of byproducts: A case study from a tissue paper mill Comput. Chem. Eng. 2009, 33, 347
-
(2009)
Comput. Chem. Eng.
, vol.33
, pp. 347
-
-
Castro, P.M.1
Westerlund, J.2
Forssell, S.3
-
23
-
-
78449311048
-
Optimal scheduling of pipeline systems with a resource-task network continuous-time formulation
-
Castro, P. M. Optimal scheduling of pipeline systems with a resource-task network continuous-time formulation Ind. Eng. Chem. Res. 2010, 49, 11491
-
(2010)
Ind. Eng. Chem. Res.
, vol.49
, pp. 11491
-
-
Castro, P.M.1
-
24
-
-
84894902084
-
Scope for industrial applications of production scheduling models and solution methods
-
Harjunkoski, I.; Maravelias, C.; Bongers, P.; Castro, P. M.; Engell, S.; Grossmann, I.; Hooker, J.; Méndez, C.; Sand, G.; Wassick, J. Scope for industrial applications of production scheduling models and solution methods Comput. Chem. Eng. 2014, 62, 161
-
(2014)
Comput. Chem. Eng.
, vol.62
, pp. 161
-
-
Harjunkoski, I.1
Maravelias, C.2
Bongers, P.3
Castro, P.M.4
Engell, S.5
Grossmann, I.6
Hooker, J.7
Méndez, C.8
Sand, G.9
Wassick, J.10
-
25
-
-
67849109965
-
New continuous-time scheduling formulation for continuous plants under variable electricity cost
-
Castro, P. M.; Harjunkoski, I.; Grossmann, I. E. New continuous-time scheduling formulation for continuous plants under variable electricity cost Ind. Eng. Chem. Res. 2009, 48, 6701
-
(2009)
Ind. Eng. Chem. Res.
, vol.48
, pp. 6701
-
-
Castro, P.M.1
Harjunkoski, I.2
Grossmann, I.E.3
-
26
-
-
84863839501
-
Short-term scheduling of refinery crude oil operations
-
Yadav, S.; Shaik, M. A. Short-term scheduling of refinery crude oil operations Ind. Eng. Chem. Res. 2012, 51, 9287
-
(2012)
Ind. Eng. Chem. Res.
, vol.51
, pp. 9287
-
-
Yadav, S.1
Shaik, M.A.2
-
28
-
-
0442264226
-
Planning and scheduling in the process industry
-
Kallrath, J. Planning and scheduling in the process industry OR Spectrum 2002, 24, 219
-
(2002)
OR Spectrum
, vol.24
, pp. 219
-
-
Kallrath, J.1
-
29
-
-
0032093568
-
Scheduling of a multi-product batch process in the chemical industry
-
Blömer, F.; Günther, H. Scheduling of a multi-product batch process in the chemical industry Computers Ind. 1998, 36, 245
-
(1998)
Computers Ind.
, vol.36
, pp. 245
-
-
Blömer, F.1
Günther, H.2
-
30
-
-
0000324065
-
Disjunctive programming and a hierarchy of relaxations for discrete optimization problems
-
Balas, E. Disjunctive programming and a hierarchy of relaxations for discrete optimization problems SIAM J. Algebraic Discrete Methods 1985, 6 (3) 466-486
-
(1985)
SIAM J. Algebraic Discrete Methods
, vol.6
, Issue.3
, pp. 466-486
-
-
Balas, E.1
-
31
-
-
84860375846
-
Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations
-
Castro, P. M.; Grossmann, I. E. Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations Ind. Eng. Chem. Res. 2012, 51, 5781
-
(2012)
Ind. Eng. Chem. Res.
, vol.51
, pp. 5781
-
-
Castro, P.M.1
Grossmann, I.E.2
-
32
-
-
0028461924
-
Modeling and computational techniques for logic based integer programming
-
Raman, R.; Grossmann, I. E. Modeling and computational techniques for logic based integer programming Comput. Chem. Eng. 1994, 18, 563
-
(1994)
Comput. Chem. Eng.
, vol.18
, pp. 563
-
-
Raman, R.1
Grossmann, I.E.2
-
33
-
-
50549096839
-
Global optimization for scheduling refinery crude oil operations
-
Karuppiah, R.; Furman, K. C.; Grossmann, I. E. Global optimization for scheduling refinery crude oil operations Comput. Chem. Eng. 2008, 32, 2745
-
(2008)
Comput. Chem. Eng.
, vol.32
, pp. 2745
-
-
Karuppiah, R.1
Furman, K.C.2
Grossmann, I.E.3
-
34
-
-
84874414112
-
Comparison of global optimization algorithms for the design of water-using networks
-
Castro, P. M.; Teles, J. P. Comparison of global optimization algorithms for the design of water-using networks Comput. Chem. Eng. 2013, 52, 249
-
(2013)
Comput. Chem. Eng.
, vol.52
, pp. 249
-
-
Castro, P.M.1
Teles, J.P.2
-
35
-
-
84877692617
-
Univariate parameterization for global optimization of mixed-integer polynomial problems
-
Teles, J. P.; Castro, P. M.; Matos, H. A. Univariate parameterization for global optimization of mixed-integer polynomial problems Eur. J. Oper. Res. 2013, 229, 613
-
(2013)
Eur. J. Oper. Res.
, vol.229
, pp. 613
-
-
Teles, J.P.1
Castro, P.M.2
Matos, H.A.3
-
36
-
-
0024630736
-
Computational experience with DICOPT solving MINLP problems in process systems engineering
-
Kocis, G. R.; Grossmann, I. E. Computational experience with DICOPT solving MINLP problems in process systems engineering Comput. Chem. Eng. 1989, 13, 307
-
(1989)
Comput. Chem. Eng.
, vol.13
, pp. 307
-
-
Kocis, G.R.1
Grossmann, I.E.2
-
37
-
-
21144437792
-
A polyhedral branch-and-cut approach to global optimization
-
Tawarmalani, M.; Sahinidis, N. V. A polyhedral branch-and-cut approach to global optimization Mathematical Programming 2005, 103 (2) 225
-
(2005)
Mathematical Programming
, vol.103
, Issue.2
, pp. 225
-
-
Tawarmalani, M.1
Sahinidis, N.V.2
-
38
-
-
84875951353
-
GloMIQO: Global mixed-integer quadratic optimizer
-
Misener, R.; Floudas, C. A. GloMIQO: Global mixed-integer quadratic optimizer J. Global Optimization 2013, 57, 3
-
(2013)
J. Global Optimization
, vol.57
, pp. 3
-
-
Misener, R.1
Floudas, C.A.2
-
39
-
-
0025459923
-
A combined penalty-function and outer-approximation method for MINLP optimization
-
Viswanathan, J.; Grossmann, I. E. A combined penalty-function and outer-approximation method for MINLP optimization Comput. Chem. Eng. 1990, 14, 769
-
(1990)
Comput. Chem. Eng.
, vol.14
, pp. 769
-
-
Viswanathan, J.1
Grossmann, I.E.2
-
40
-
-
1942532285
-
Efficient short-term scheduling of refinery operations based on a continuous time formulation
-
Jia, Z.; Ierapetritou, M. G. Efficient short-term scheduling of refinery operations based on a continuous time formulation Comput. Chem. Eng. 2004, 28, 1001
-
(2004)
Comput. Chem. Eng.
, vol.28
, pp. 1001
-
-
Jia, Z.1
Ierapetritou, M.G.2
-
41
-
-
0029412952
-
Global optimization of bilinear process networks with multicomponent flows
-
Quesada, I.; Grossmann, I. E. Global optimization of bilinear process networks with multicomponent flows Comput. Chem. Eng. 1995, 19, 1219
-
(1995)
Comput. Chem. Eng.
, vol.19
, pp. 1219
-
-
Quesada, I.1
Grossmann, I.E.2
|