Volumn 66 AISC, Issue , 2010, Pages 917-926

An ant colony optimization model for parallel machine scheduling with human resource constraints

Author keywords

Ant colony optimization; Human resource constraints; Parallel machine; Precedence constraints; Scheduling

Indexed keywords

ARTIFICIAL INTELLIGENCE; CONSTRAINED OPTIMIZATION; FLOW MEASUREMENT; MACHINERY; PERSONNEL; SCHEDULING;

EID: 84903843591     PISSN: 18675662     EISSN: None     Source Type: Book Series    
DOI: 10.1007/978-3-642-10430-5_71     Document Type: Conference Paper
Times cited : (3)

References (6)
  • 1
    • 64449088021 scopus 로고    scopus 로고
    • Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
    • Behnamian, J., Zandieh, M., Fatemi Ghomi, S.M.T.: Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Systems with Applications 36(6), 9637-9644 (2009).
    • (2009) Expert Systems with Applications , vol.36 , Issue.6 , pp. 9637-9644
    • Behnamian, J.1    Zandieh, M.2    Fatemi Ghomi, S.M.T.3
  • 2
    • 56549110639 scopus 로고    scopus 로고
    • Minimizing Makespan in two-stage hybrid cross docking scheduling problem
    • Chen, F., Song, K.: Minimizing makespan in two-stage hybrid cross docking scheduling problem. Computers & Operations Research 36(6), 2066-2073 (2009).
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 2066-2073
    • Chen, F.1    Song, K.2
  • 3
    • 63549109485 scopus 로고    scopus 로고
    • A two-phase GA model for resource-constrained project scheduling
    • Chen, P.H., Weng, H.: A two-phase GA model for resource-constrained project scheduling. Automation in Construction 18(4), 485-498 (2009).
    • (2009) Automation in Construction , vol.18 , Issue.4 , pp. 485-498
    • Chen, P.H.1    Weng, H.2
  • 4
    • 27644553525 scopus 로고    scopus 로고
    • A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
    • Nait, T.D., et al.: A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times. International Journal of Production Economics 99(1-2), 63-73 (2006).
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 63-73
    • Nait, T.D.1
  • 5
    • 0037120688 scopus 로고    scopus 로고
    • An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
    • T'kindt, V., et al.: An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem. European Journal of Operational Research 142(2), 250-257 (2002).
    • (2002) European Journal of Operational Research , vol.142 , Issue.2 , pp. 250-257
    • T'kindt, V.1
  • 6
    • 33846922274 scopus 로고    scopus 로고
    • Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling
    • Ziaee, M., Sadjadi, S.J.: Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling. Applied Mathematics and Computation 185(1), 218-228 (2007).
    • (2007) Applied Mathematics and Computation , vol.185 , Issue.1 , pp. 218-228
    • Ziaee, M.1    Sadjadi, S.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.