-
1
-
-
84857956931
-
An overview of time-based and condition-based maintenance in industrial application
-
Ahmad, R., and S. Kamaruddin. 2012. "An Overview of Time-Based and Condition-Based Maintenance in Industrial Application." Computers and Industrial Engineering 63 (1): 135-149.
-
(2012)
Computers and Industrial Engineering
, vol.63
, Issue.1
, pp. 135-149
-
-
Ahmad, R.1
Kamaruddin, S.2
-
4
-
-
49649132055
-
The first passage problem for stationary random structuralvibration
-
Bernard, M. C., and J.W. Shipley. 1972. "The First Passage Problem for Stationary Random StructuralVibration." Journal of Sound and Vibration 24 (1): 121-132.
-
(1972)
Journal of Sound and Vibration
, vol.24
, Issue.1
, pp. 121-132
-
-
Bernard, M.C.1
Shipley, J.W.2
-
5
-
-
84859479071
-
Optimal maintenance policy for a system subject to damage in a discrete time process
-
Chien, Y. H., S. H. Sheu, and Z. G. Zhang. 2012. "Optimal Maintenance Policy for a System Subject to Damage in a Discrete Time Process." Reliability Engineering and System Safety 103: 1-10.
-
(2012)
Reliability Engineering and System Safety
, vol.103
, pp. 1-10
-
-
Chien, Y.H.1
Sheu, S.H.2
Zhang, Z.G.3
-
7
-
-
0018767337
-
Narrow reliability bounds for structural systems
-
Ditlevsen, O. 1979. "Narrow Reliability Bounds for Structural Systems." Journal of Structural Mechanics 7: 453-472. (Pubitemid 10457346)
-
(1979)
Journal of structural mechanics
, vol.7
, Issue.4
, pp. 453-472
-
-
Ditlevsen Ove1
-
8
-
-
0020705114
-
Gaussian outcrossings from safe convex polyhedrons
-
Ditlevsen, O. 1983. "Gaussian Outcrossings from Safe Convex Polyhedrons." Journal of Engineering Mechanics 109 (1): 127-148. (Pubitemid 13522782)
-
(1983)
Journal of Engineering Mechanics
, vol.109
, Issue.1
, pp. 127-148
-
-
Ditlevsen Ove1
-
9
-
-
84864138951
-
Reliability analysis and joint assessment of brown-proschan preventive maintenance efficiency and intrinsicwear-out
-
Doyen, L. 2012. "Reliability Analysis and Joint Assessment of Brown-Proschan Preventive Maintenance Efficiency and IntrinsicWear-Out." Computational Statistics and Data Analysis 56 (12): 4433-4449.
-
(2012)
Computational Statistics and Data Analysis
, vol.56
, Issue.12
, pp. 4433-4449
-
-
Doyen, L.1
-
10
-
-
44649118820
-
Saddlepoint approximation for sequential optimization and reliability analysis
-
Du, X. 2008. "Saddlepoint Approximation for Sequential Optimization and Reliability Analysis." Journal of Mechanical Design, Transactions of the ASME 130 (1).
-
(2008)
Journal of Mechanical Design, Transactions of the ASME
, vol.130
, Issue.1
-
-
Du, X.1
-
11
-
-
38349131397
-
Sequential optimization and reliability assessment for multidisciplinary systems design
-
Du, X., J. Guo, and H. Beeram. 2008. "Sequential Optimization and Reliability Assessment for Multidisciplinary Systems Design." Structural and Multidisciplinary Optimization 35 (2): 117-130.
-
(2008)
Structural and Multidisciplinary Optimization
, vol.35
, Issue.2
, pp. 117-130
-
-
Du, X.1
Guo, J.2
Beeram, H.3
-
12
-
-
37249012936
-
Reliability-based design optimization with equality constraints
-
DOI 10.1002/nme.2043
-
Du, X., and B. Huang. 2007. "Reliability-Based Design Optimization with Equality Constraints." International Journal for Numerical Methods in Engineering 72 (11): 1314-1331. (Pubitemid 350263081)
-
(2007)
International Journal for Numerical Methods in Engineering
, vol.72
, Issue.11
, pp. 1314-1331
-
-
Du, X.1
Huang, B.2
-
13
-
-
3042691241
-
First-order saddlepoint approximation for reliability analysis
-
Du, X., and A. Sudjianto. 2004. "First-Order Saddlepoint Approximation for Reliability Analysis." AIAA Journal 42 (6): 1199-1207.
-
(2004)
AIAA Journal
, vol.42
, Issue.6
, pp. 1199-1207
-
-
Du, X.1
Sudjianto, A.2
-
14
-
-
28244498648
-
Reliability-based design with the mixture of random and interval variables
-
DOI 10.1115/1.1992510
-
Du, X., A. Sudjianto, and B. Huang. 2005. "Reliability-Based Design with the Mixture of Random and IntervalVariables." Journal of Mechanical Design, Transactions of the ASME 127 (6): 1068-1076. (Pubitemid 41709564)
-
(2005)
Journal of Mechanical Design, Transactions of the ASME
, vol.127
, Issue.6
, pp. 1068-1076
-
-
Du, X.1
Sudjianto, A.2
Huang, B.3
-
15
-
-
77049105926
-
Reliability analysis for multidisciplinary systems with random and intervalvariables
-
Guo, J., and X. Du. 2010. "Reliability Analysis for Multidisciplinary Systems with Random and IntervalVariables." AIAA Journal 48 (1): 82-91.
-
(2010)
AIAA Journal
, vol.48
, Issue.1
, pp. 82-91
-
-
Guo, J.1
Du, X.2
-
16
-
-
84855928146
-
Finding optimally balanced words for production planning and maintenance scheduling
-
Herrmann, J.W. 2012. "Finding Optimally BalancedWords for Production Planning and Maintenance Scheduling." IIE Transactions (Institute of Industrial Engineers) 44 (3): 215-229.
-
(2012)
IIE Transactions (Institute of Industrial Engineers)
, vol.44
, Issue.3
, pp. 215-229
-
-
Herrmann, J.W.1
-
17
-
-
84861798876
-
Reliability analysis for hydrokinetic turbine blades
-
Hu, Z., and X. Du. 2012. "Reliability Analysis for Hydrokinetic Turbine Blades." Renewable Energy 48: 251-262.
-
(2012)
Renewable Energy
, vol.48
, pp. 251-262
-
-
Hu, Z.1
Du, X.2
-
18
-
-
84879943198
-
A sampling approach to extremevalue distribution for time-dependent reliability analysis
-
8 pp
-
Hu, Z., and X. Du. 2013. "A Sampling Approach to ExtremeValue Distribution for Time-Dependent Reliability Analysis." Journal of Mechanical Design, Transactions of the ASME, 135 (7), 071003 (8 pp).
-
(2013)
Journal of Mechanical Design, Transactions of the ASME
, vol.135
, Issue.7
, pp. 071003
-
-
Hu, Z.1
Du, X.2
-
19
-
-
84880573338
-
Simulation-based time-dependent reliability analysis for composite hydrokinetic turbine blades
-
Hu, Z., H. Li, X. Du, and K. Chandrashekhara. 2013. "Simulation- Based Time-Dependent Reliability Analysis for Composite Hydrokinetic Turbine Blades." Structural and Multidisciplinary Optimization 47 (5): 765-781.
-
(2013)
Structural and Multidisciplinary Optimization
, vol.47
, Issue.5
, pp. 765-781
-
-
Hu, Z.1
Li, H.2
Du, X.3
Chandrashekhara, K.4
-
20
-
-
84858706425
-
Optimal performance-based design of wind sensitive tall buildings considering uncertainties
-
Huang, M. F., C. M. Chan, and W. J. Lou. 2012. "Optimal Performance-Based Design of Wind Sensitive Tall Buildings Considering Uncertainties." Computers and Structures 98-99: 7-16.
-
(2012)
Computers and Structures
, vol.98-99
, pp. 7-16
-
-
Huang, M.F.1
Chan, C.M.2
Lou, W.J.3
-
21
-
-
34249929736
-
Optimal reliability, warranty and price for new products
-
DOI 10.1080/07408170601091907, PII 779126890
-
Huang, H. Z., Z. J. Liu, and D. N. P. Murthy. 2007. "Optimal Reliability, Warranty and Price for New Products." IIE Transactions (Institute of Industrial Engineers) 39 (8): 819-827. (Pubitemid 46876943)
-
(2007)
IIE Transactions (Institute of Industrial Engineers)
, vol.39
, Issue.8
, pp. 819-827
-
-
Huang, H.-Z.1
Liu, Z.-J.2
Murthy, D.N.P.3
-
22
-
-
84859776116
-
The encounter of interval and probabilistic approaches to structural reliability at the design point
-
Hurtado, J. E., and D. A. Alvarez. 2012. "The Encounter of Interval and Probabilistic Approaches to Structural Reliability at the Design Point." Computer Methods in Applied Mechanics and Engineering 225: 74-94.
-
(2012)
Computer Methods in Applied Mechanics and Engineering
, vol.225
, pp. 74-94
-
-
Hurtado, J.E.1
Alvarez, D.A.2
-
24
-
-
67649639367
-
Estimating the manufacturing cost of purely organic solar cells
-
Kalowekamo, J. and E. Baker. 2009. "Estimating the Manufacturing Cost of Purely Organic Solar Cells." Solar Energy 83 (8): 1224-1231.
-
(2009)
Solar Energy
, vol.83
, Issue.8
, pp. 1224-1231
-
-
Kalowekamo, J.1
Baker, E.2
-
25
-
-
84862908166
-
Further development of matrix-based system reliability method and applications to structural systems
-
Kang, W. H., Y. J. Lee, J. Song, and B. Gencturk. 2012. "Further Development of Matrix-Based System Reliability Method and Applications to Structural Systems." Structure and Infrastructure Engineering 8 (5): 441-457.
-
(2012)
Structure and Infrastructure Engineering
, vol.8
, Issue.5
, pp. 441-457
-
-
Kang, W.H.1
Lee, Y.J.2
Song, J.3
Gencturk, B.4
-
26
-
-
0028599668
-
Optimizing tolerance allocation based on manufacturing cost and quality loss
-
Minneapolis, MN, USA. 11-14 September, 1994
-
Krishnaswami, M., and R.W. Mayne. 1994. "Optimizing Tolerance Allocation Based on Manufacturing Cost and Quality Loss." In Proceedings of the 20th ASME Design Automation Conference, DE Vol. 69-1, Minneapolis, MN, USA. 11-14 September, 1994, pp. 211-217.
-
(1994)
Proceedings of the 20th ASME Design Automation Conference, de
, vol.69
, Issue.1
, pp. 211-217
-
-
Krishnaswami, M.1
Mayne, R.W.2
-
28
-
-
34547514290
-
Efficient first-order reliability analysis of multidisciplinary systems
-
Mahadevan, S., and N. Smith. 2006. "Efficient First-Order Reliability Analysis of Multidisciplinary Systems." International Journal of Reliability and Safety 1 (1): 137-154.
-
(2006)
Ternational Journal of Reliability and Safety
, vol.1
, Issue.1
, pp. 137-154
-
-
Mahadevan, S.1
Smith, N.2
-
31
-
-
84859389599
-
A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximising the availability
-
Pan, E., W. Liao, and L. Xi. 2012. "A Single Machine-Based Scheduling Optimisation Model Integrated with Preventive Maintenance Policy for Maximising the Availability." International Journal of Industrial and Systems Engineering 10 (4): 451-469.
-
(2012)
Ternational Journal of Industrial and Systems Engineering
, vol.10
, Issue.4
, pp. 451-469
-
-
Pan, E.1
Liao, W.2
Xi, L.3
-
32
-
-
0035743192
-
Reliability analysis-a review and some perspective
-
DOI 10.1016/S0167-4730(02)00009-7, PII S0167473002000097, Papers presented at the 8th American Society of Civil Engineers Joint Conference on Probabilistic Methods and Structural Reliability
-
Rackwitz, R. 2001. "Reliability Analysis-A Review and Some Perspectives." Structural Safety 23 (4): 365-395. (Pubitemid 34696460)
-
(2001)
Structural Safety
, vol.23
, Issue.4
, pp. 365-395
-
-
Rackwitz, R.1
-
33
-
-
84939730902
-
Mathematical analysis of random noise
-
Rice, S. O. 1944. "Mathematical Analysis of Random Noise." Bell System Technical Journal 23: 282-332.
-
(1944)
Bell System Technical Journal
, vol.23
, pp. 282-332
-
-
Rice, S.O.1
-
34
-
-
84944485718
-
Mathematical analysis of random noise
-
Rice, S. O. 1945. "Mathematical Analysis of Random Noise." Bell Systems, Technical Journal 24: 146-156.
-
(1945)
Bell Systems, Technical Journal
, vol.24
, pp. 146-156
-
-
Rice, S.O.1
-
35
-
-
84859502674
-
Optimisation of the design of infrastructure components subject to progressive deterioration and extreme loads
-
Sanchez-Silva, M., G. A. Klutke, and D. V. Rosowsky, 2012. "Optimisation of the Design of Infrastructure Components Subject to Progressive Deterioration and Extreme Loads." Structure and Infrastructure Engineering 8 (7): 655-667.
-
(2012)
Structure and Infrastructure Engineering
, vol.8
, Issue.7
, pp. 655-667
-
-
Sanchez-Silva, M.1
Klutke, G.A.2
Rosowsky, D.V.3
-
36
-
-
0035155336
-
A bayesian approach to an adaptive preventive maintenance model
-
Sheu, S. H., R. H.Yeh, Y. B. Lin, and M. G. Juang, 2001. "A Bayesian Approach to an Adaptive Preventive Maintenance Model." Reliability Engineering and System Safety 71 (1): 33-44.
-
(2001)
Reliability Engineering and System Safety
, vol.71
, Issue.1
, pp. 33-44
-
-
Sheu, S.H.1
Yeh, R.H.2
Lin, Y.B.3
Juang, M.G.4
-
37
-
-
77957320219
-
Design for lifecycle cost using time-dependent reliability
-
Singh, A., Z. P. Mourelatos, and J. Li. 2010. "Design for Lifecycle Cost Using Time-Dependent Reliability." Journal of Mechanical Design, Transactions of the ASME 132 (9): 0910081-09100811.
-
(2010)
Journal of Mechanical Design, Transactions of the ASME
, vol.132
, Issue.9
, pp. 0910081-09100811
-
-
Singh, A.1
Mourelatos, Z.P.2
Li, J.3
-
38
-
-
84863572045
-
An importance samplingapproach fortime-dependent reliability
-
Washington, DC
-
Singh, A., Z. P. Mourelatos, and E. Nikolaidis. 2011. "An Importance SamplingApproach forTime-Dependent Reliability." Proceedings of the ASME Design Engineering Technical Conference, Washington, DC, pp. 1077-1088.
-
(2011)
Proceedings of the ASME Design Engineering Technical Conference
, pp. 1077-1088
-
-
Singh, A.1
Mourelatos, Z.P.2
Nikolaidis, E.3
-
39
-
-
31144475043
-
Joint first-passage probability and reliability of systems under stochastic excitation
-
DOI 10.1061/(ASCE)0733-9399(2006)132:1(65)
-
Song, J., and A. Der Kiureghian. 2006. "Joint First-Passage Probability and Reliability of Systems Under Stochastic Excitation." Journal of Engineering Mechanics 132 (1): 65-77. (Pubitemid 43124777)
-
(2006)
Journal of Engineering Mechanics
, vol.132
, Issue.1
, pp. 65-77
-
-
Song, J.1
Der Kiureghian, A.2
-
40
-
-
1142292334
-
Time-variant reliability-oriented structural optimization and a renewal model for life-cycle costing
-
Streicher, H., and R. Rackwitz. 2004. "Time-Variant Reliability-Oriented Structural Optimization and a Renewal Model for Life-Cycle Costing." Probabilistic Engineering Mechanics 19 (1): 171-183.
-
(2004)
Probabilistic Engineering Mechanics
, vol.19
, Issue.1
, pp. 171-183
-
-
Streicher, H.1
Rackwitz, R.2
-
41
-
-
84858078471
-
Optimization of preventive maintenance schedule and production lot size
-
Suliman, S. M. A., and S. H. Jawad. 2012. "Optimization of Preventive Maintenance Schedule and Production Lot Size." International Journal of Production Economics 137 (1): 19-28.
-
(2012)
Ternational Journal of Production Economics
, vol.137
, Issue.1
, pp. 19-28
-
-
Suliman, S.M.A.1
Jawad, S.H.2
-
42
-
-
0016483905
-
On the distribution of the first-passagetime for normal stationary random processes
-
Vanmarcke, E. H. 1975. "On the Distribution of the First-PassageTime for Normal Stationary Random Processes." Journal of Applied Mechanics 42: 215-220.
-
(1975)
Journal of Applied Mechanics
, vol.42
, pp. 215-220
-
-
Vanmarcke, E.H.1
-
43
-
-
77955246013
-
Optimal design accounting for reliability, maintenance, and warranty
-
Wang, Z., X. Du, and H. Z. Huang. 2010. "Optimal Design Accounting for Reliability, Maintenance, and Warranty." Journal of Mechanical Design, Transactions of the ASME 132 (1): 0110071-0110078.
-
(2010)
Journal of Mechanical Design, Transactions of the ASME
, vol.132
, Issue.1
, pp. 0110071-0110078
-
-
Wang, Z.1
Du, X.2
Huang, H.Z.3
-
44
-
-
84870036914
-
A nested extreme response surface approach for time-dependent reliability-based design optimization
-
Wang, Z., and P. Wang. 2012a. "A Nested Extreme Response Surface Approach for Time-Dependent Reliability-Based Design Optimization." Journal of Mechanical Design, Transactions of the ASME 134 (12).
-
(2012)
Journal of Mechanical Design, Transactions of the ASME
, vol.134
, Issue.12
-
-
Wang, Z.1
Wang, P.2
-
45
-
-
84868238236
-
Reliability-based product design with time-dependent performance deterioration
-
Denver, CO; 18 June 2012-21 June 2012; Code 93398
-
Wang, Z., and P. Wang. 2012b. "Reliability-Based Product Design with Time-Dependent Performance Deterioration." In 2012 IEEE International Conference on Prognostics and Health Management: Enhancing Safety, Efficiency, Availability, and Effectiveness of Systems Through PHM Technology and Application (PHM 2012), Denver, CO; 18 June 2012-21 June 2012; Code 93398.
-
(2012)
2012 IEEE International Conference on Prognostics and Health Management: Enhancing Safety, Efficiency, Availability, and Effectiveness of Systems Through PHM Technology and Application (PHM 2012)
-
-
Wang, Z.1
Wang, P.2
-
47
-
-
84861093941
-
Degradation-based burn-in with preventive maintenance
-
Ye, Z. S., Y. Shen, and M. Xie. 2012. "Degradation-Based Burn-In with Preventive Maintenance." European Journal of Operational Research 221 (2): 360-367.
-
(2012)
European Journal of Operational Research
, vol.221
, Issue.2
, pp. 360-367
-
-
Ye, Z.S.1
Shen, Y.2
Xie, M.3
-
49
-
-
84856522113
-
Condition-based maintenance of dynamic systems using online failure prognosis and belief rule base
-
Zhou, Z. J., C. H. Hu, W. B. Wang, B. C. Zhang, D. L. Xu, and J. F. Zheng. 2012. "Condition-Based Maintenance of Dynamic Systems Using Online Failure Prognosis and Belief Rule Base." Expert Systems with Applications 39 (6): 6140-6149.
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.6
, pp. 6140-6149
-
-
Zhou, Z.J.1
Hu, C.H.2
Wang, W.B.3
Zhang, B.C.4
Xu, D.L.5
Zheng, J.F.6
-
50
-
-
84862828759
-
Preventive maintenance optimization for amulti-component system under changing job shop schedule
-
Zhou, X., Z. Lu, and L. Xi. 2012. "Preventive Maintenance Optimization for aMulti-component System Under Changing Job Shop Schedule." Reliability Engineering and System Safety 101: 14-20.
-
(2012)
Reliability Engineering and System Safety
, vol.101
, pp. 14-20
-
-
Zhou, X.1
Lu, Z.2
Xi, L.3
|