메뉴 건너뛰기




Volumn 46, Issue 10, 2014, Pages 1389-1410

Lifetime cost optimization with time-dependent reliability

Author keywords

lifetime cost; product design; reliability

Indexed keywords

COMPUTATIONAL METHODS; OPTIMIZATION; PRODUCT DESIGN; RANDOM PROCESSES; RELIABILITY; RELIABILITY ANALYSIS;

EID: 84903307041     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/0305215X.2013.841905     Document Type: Article
Times cited : (38)

References (50)
  • 1
    • 84857956931 scopus 로고    scopus 로고
    • An overview of time-based and condition-based maintenance in industrial application
    • Ahmad, R., and S. Kamaruddin. 2012. "An Overview of Time-Based and Condition-Based Maintenance in Industrial Application." Computers and Industrial Engineering 63 (1): 135-149.
    • (2012) Computers and Industrial Engineering , vol.63 , Issue.1 , pp. 135-149
    • Ahmad, R.1    Kamaruddin, S.2
  • 4
    • 49649132055 scopus 로고
    • The first passage problem for stationary random structuralvibration
    • Bernard, M. C., and J.W. Shipley. 1972. "The First Passage Problem for Stationary Random StructuralVibration." Journal of Sound and Vibration 24 (1): 121-132.
    • (1972) Journal of Sound and Vibration , vol.24 , Issue.1 , pp. 121-132
    • Bernard, M.C.1    Shipley, J.W.2
  • 5
    • 84859479071 scopus 로고    scopus 로고
    • Optimal maintenance policy for a system subject to damage in a discrete time process
    • Chien, Y. H., S. H. Sheu, and Z. G. Zhang. 2012. "Optimal Maintenance Policy for a System Subject to Damage in a Discrete Time Process." Reliability Engineering and System Safety 103: 1-10.
    • (2012) Reliability Engineering and System Safety , vol.103 , pp. 1-10
    • Chien, Y.H.1    Sheu, S.H.2    Zhang, Z.G.3
  • 7
    • 0018767337 scopus 로고
    • Narrow reliability bounds for structural systems
    • Ditlevsen, O. 1979. "Narrow Reliability Bounds for Structural Systems." Journal of Structural Mechanics 7: 453-472. (Pubitemid 10457346)
    • (1979) Journal of structural mechanics , vol.7 , Issue.4 , pp. 453-472
    • Ditlevsen Ove1
  • 8
    • 0020705114 scopus 로고
    • Gaussian outcrossings from safe convex polyhedrons
    • Ditlevsen, O. 1983. "Gaussian Outcrossings from Safe Convex Polyhedrons." Journal of Engineering Mechanics 109 (1): 127-148. (Pubitemid 13522782)
    • (1983) Journal of Engineering Mechanics , vol.109 , Issue.1 , pp. 127-148
    • Ditlevsen Ove1
  • 9
    • 84864138951 scopus 로고    scopus 로고
    • Reliability analysis and joint assessment of brown-proschan preventive maintenance efficiency and intrinsicwear-out
    • Doyen, L. 2012. "Reliability Analysis and Joint Assessment of Brown-Proschan Preventive Maintenance Efficiency and IntrinsicWear-Out." Computational Statistics and Data Analysis 56 (12): 4433-4449.
    • (2012) Computational Statistics and Data Analysis , vol.56 , Issue.12 , pp. 4433-4449
    • Doyen, L.1
  • 10
    • 44649118820 scopus 로고    scopus 로고
    • Saddlepoint approximation for sequential optimization and reliability analysis
    • Du, X. 2008. "Saddlepoint Approximation for Sequential Optimization and Reliability Analysis." Journal of Mechanical Design, Transactions of the ASME 130 (1).
    • (2008) Journal of Mechanical Design, Transactions of the ASME , vol.130 , Issue.1
    • Du, X.1
  • 11
    • 38349131397 scopus 로고    scopus 로고
    • Sequential optimization and reliability assessment for multidisciplinary systems design
    • Du, X., J. Guo, and H. Beeram. 2008. "Sequential Optimization and Reliability Assessment for Multidisciplinary Systems Design." Structural and Multidisciplinary Optimization 35 (2): 117-130.
    • (2008) Structural and Multidisciplinary Optimization , vol.35 , Issue.2 , pp. 117-130
    • Du, X.1    Guo, J.2    Beeram, H.3
  • 12
    • 37249012936 scopus 로고    scopus 로고
    • Reliability-based design optimization with equality constraints
    • DOI 10.1002/nme.2043
    • Du, X., and B. Huang. 2007. "Reliability-Based Design Optimization with Equality Constraints." International Journal for Numerical Methods in Engineering 72 (11): 1314-1331. (Pubitemid 350263081)
    • (2007) International Journal for Numerical Methods in Engineering , vol.72 , Issue.11 , pp. 1314-1331
    • Du, X.1    Huang, B.2
  • 13
    • 3042691241 scopus 로고    scopus 로고
    • First-order saddlepoint approximation for reliability analysis
    • Du, X., and A. Sudjianto. 2004. "First-Order Saddlepoint Approximation for Reliability Analysis." AIAA Journal 42 (6): 1199-1207.
    • (2004) AIAA Journal , vol.42 , Issue.6 , pp. 1199-1207
    • Du, X.1    Sudjianto, A.2
  • 14
    • 28244498648 scopus 로고    scopus 로고
    • Reliability-based design with the mixture of random and interval variables
    • DOI 10.1115/1.1992510
    • Du, X., A. Sudjianto, and B. Huang. 2005. "Reliability-Based Design with the Mixture of Random and IntervalVariables." Journal of Mechanical Design, Transactions of the ASME 127 (6): 1068-1076. (Pubitemid 41709564)
    • (2005) Journal of Mechanical Design, Transactions of the ASME , vol.127 , Issue.6 , pp. 1068-1076
    • Du, X.1    Sudjianto, A.2    Huang, B.3
  • 15
    • 77049105926 scopus 로고    scopus 로고
    • Reliability analysis for multidisciplinary systems with random and intervalvariables
    • Guo, J., and X. Du. 2010. "Reliability Analysis for Multidisciplinary Systems with Random and IntervalVariables." AIAA Journal 48 (1): 82-91.
    • (2010) AIAA Journal , vol.48 , Issue.1 , pp. 82-91
    • Guo, J.1    Du, X.2
  • 16
    • 84855928146 scopus 로고    scopus 로고
    • Finding optimally balanced words for production planning and maintenance scheduling
    • Herrmann, J.W. 2012. "Finding Optimally BalancedWords for Production Planning and Maintenance Scheduling." IIE Transactions (Institute of Industrial Engineers) 44 (3): 215-229.
    • (2012) IIE Transactions (Institute of Industrial Engineers) , vol.44 , Issue.3 , pp. 215-229
    • Herrmann, J.W.1
  • 17
    • 84861798876 scopus 로고    scopus 로고
    • Reliability analysis for hydrokinetic turbine blades
    • Hu, Z., and X. Du. 2012. "Reliability Analysis for Hydrokinetic Turbine Blades." Renewable Energy 48: 251-262.
    • (2012) Renewable Energy , vol.48 , pp. 251-262
    • Hu, Z.1    Du, X.2
  • 18
    • 84879943198 scopus 로고    scopus 로고
    • A sampling approach to extremevalue distribution for time-dependent reliability analysis
    • 8 pp
    • Hu, Z., and X. Du. 2013. "A Sampling Approach to ExtremeValue Distribution for Time-Dependent Reliability Analysis." Journal of Mechanical Design, Transactions of the ASME, 135 (7), 071003 (8 pp).
    • (2013) Journal of Mechanical Design, Transactions of the ASME , vol.135 , Issue.7 , pp. 071003
    • Hu, Z.1    Du, X.2
  • 19
    • 84880573338 scopus 로고    scopus 로고
    • Simulation-based time-dependent reliability analysis for composite hydrokinetic turbine blades
    • Hu, Z., H. Li, X. Du, and K. Chandrashekhara. 2013. "Simulation- Based Time-Dependent Reliability Analysis for Composite Hydrokinetic Turbine Blades." Structural and Multidisciplinary Optimization 47 (5): 765-781.
    • (2013) Structural and Multidisciplinary Optimization , vol.47 , Issue.5 , pp. 765-781
    • Hu, Z.1    Li, H.2    Du, X.3    Chandrashekhara, K.4
  • 20
    • 84858706425 scopus 로고    scopus 로고
    • Optimal performance-based design of wind sensitive tall buildings considering uncertainties
    • Huang, M. F., C. M. Chan, and W. J. Lou. 2012. "Optimal Performance-Based Design of Wind Sensitive Tall Buildings Considering Uncertainties." Computers and Structures 98-99: 7-16.
    • (2012) Computers and Structures , vol.98-99 , pp. 7-16
    • Huang, M.F.1    Chan, C.M.2    Lou, W.J.3
  • 21
    • 34249929736 scopus 로고    scopus 로고
    • Optimal reliability, warranty and price for new products
    • DOI 10.1080/07408170601091907, PII 779126890
    • Huang, H. Z., Z. J. Liu, and D. N. P. Murthy. 2007. "Optimal Reliability, Warranty and Price for New Products." IIE Transactions (Institute of Industrial Engineers) 39 (8): 819-827. (Pubitemid 46876943)
    • (2007) IIE Transactions (Institute of Industrial Engineers) , vol.39 , Issue.8 , pp. 819-827
    • Huang, H.-Z.1    Liu, Z.-J.2    Murthy, D.N.P.3
  • 22
    • 84859776116 scopus 로고    scopus 로고
    • The encounter of interval and probabilistic approaches to structural reliability at the design point
    • Hurtado, J. E., and D. A. Alvarez. 2012. "The Encounter of Interval and Probabilistic Approaches to Structural Reliability at the Design Point." Computer Methods in Applied Mechanics and Engineering 225: 74-94.
    • (2012) Computer Methods in Applied Mechanics and Engineering , vol.225 , pp. 74-94
    • Hurtado, J.E.1    Alvarez, D.A.2
  • 24
    • 67649639367 scopus 로고    scopus 로고
    • Estimating the manufacturing cost of purely organic solar cells
    • Kalowekamo, J. and E. Baker. 2009. "Estimating the Manufacturing Cost of Purely Organic Solar Cells." Solar Energy 83 (8): 1224-1231.
    • (2009) Solar Energy , vol.83 , Issue.8 , pp. 1224-1231
    • Kalowekamo, J.1    Baker, E.2
  • 25
    • 84862908166 scopus 로고    scopus 로고
    • Further development of matrix-based system reliability method and applications to structural systems
    • Kang, W. H., Y. J. Lee, J. Song, and B. Gencturk. 2012. "Further Development of Matrix-Based System Reliability Method and Applications to Structural Systems." Structure and Infrastructure Engineering 8 (5): 441-457.
    • (2012) Structure and Infrastructure Engineering , vol.8 , Issue.5 , pp. 441-457
    • Kang, W.H.1    Lee, Y.J.2    Song, J.3    Gencturk, B.4
  • 26
    • 0028599668 scopus 로고
    • Optimizing tolerance allocation based on manufacturing cost and quality loss
    • Minneapolis, MN, USA. 11-14 September, 1994
    • Krishnaswami, M., and R.W. Mayne. 1994. "Optimizing Tolerance Allocation Based on Manufacturing Cost and Quality Loss." In Proceedings of the 20th ASME Design Automation Conference, DE Vol. 69-1, Minneapolis, MN, USA. 11-14 September, 1994, pp. 211-217.
    • (1994) Proceedings of the 20th ASME Design Automation Conference, de , vol.69 , Issue.1 , pp. 211-217
    • Krishnaswami, M.1    Mayne, R.W.2
  • 28
    • 34547514290 scopus 로고    scopus 로고
    • Efficient first-order reliability analysis of multidisciplinary systems
    • Mahadevan, S., and N. Smith. 2006. "Efficient First-Order Reliability Analysis of Multidisciplinary Systems." International Journal of Reliability and Safety 1 (1): 137-154.
    • (2006) Ternational Journal of Reliability and Safety , vol.1 , Issue.1 , pp. 137-154
    • Mahadevan, S.1    Smith, N.2
  • 31
    • 84859389599 scopus 로고    scopus 로고
    • A single machine-based scheduling optimisation model integrated with preventive maintenance policy for maximising the availability
    • Pan, E., W. Liao, and L. Xi. 2012. "A Single Machine-Based Scheduling Optimisation Model Integrated with Preventive Maintenance Policy for Maximising the Availability." International Journal of Industrial and Systems Engineering 10 (4): 451-469.
    • (2012) Ternational Journal of Industrial and Systems Engineering , vol.10 , Issue.4 , pp. 451-469
    • Pan, E.1    Liao, W.2    Xi, L.3
  • 32
    • 0035743192 scopus 로고    scopus 로고
    • Reliability analysis-a review and some perspective
    • DOI 10.1016/S0167-4730(02)00009-7, PII S0167473002000097, Papers presented at the 8th American Society of Civil Engineers Joint Conference on Probabilistic Methods and Structural Reliability
    • Rackwitz, R. 2001. "Reliability Analysis-A Review and Some Perspectives." Structural Safety 23 (4): 365-395. (Pubitemid 34696460)
    • (2001) Structural Safety , vol.23 , Issue.4 , pp. 365-395
    • Rackwitz, R.1
  • 33
    • 84939730902 scopus 로고
    • Mathematical analysis of random noise
    • Rice, S. O. 1944. "Mathematical Analysis of Random Noise." Bell System Technical Journal 23: 282-332.
    • (1944) Bell System Technical Journal , vol.23 , pp. 282-332
    • Rice, S.O.1
  • 34
    • 84944485718 scopus 로고
    • Mathematical analysis of random noise
    • Rice, S. O. 1945. "Mathematical Analysis of Random Noise." Bell Systems, Technical Journal 24: 146-156.
    • (1945) Bell Systems, Technical Journal , vol.24 , pp. 146-156
    • Rice, S.O.1
  • 35
    • 84859502674 scopus 로고    scopus 로고
    • Optimisation of the design of infrastructure components subject to progressive deterioration and extreme loads
    • Sanchez-Silva, M., G. A. Klutke, and D. V. Rosowsky, 2012. "Optimisation of the Design of Infrastructure Components Subject to Progressive Deterioration and Extreme Loads." Structure and Infrastructure Engineering 8 (7): 655-667.
    • (2012) Structure and Infrastructure Engineering , vol.8 , Issue.7 , pp. 655-667
    • Sanchez-Silva, M.1    Klutke, G.A.2    Rosowsky, D.V.3
  • 39
    • 31144475043 scopus 로고    scopus 로고
    • Joint first-passage probability and reliability of systems under stochastic excitation
    • DOI 10.1061/(ASCE)0733-9399(2006)132:1(65)
    • Song, J., and A. Der Kiureghian. 2006. "Joint First-Passage Probability and Reliability of Systems Under Stochastic Excitation." Journal of Engineering Mechanics 132 (1): 65-77. (Pubitemid 43124777)
    • (2006) Journal of Engineering Mechanics , vol.132 , Issue.1 , pp. 65-77
    • Song, J.1    Der Kiureghian, A.2
  • 40
    • 1142292334 scopus 로고    scopus 로고
    • Time-variant reliability-oriented structural optimization and a renewal model for life-cycle costing
    • Streicher, H., and R. Rackwitz. 2004. "Time-Variant Reliability-Oriented Structural Optimization and a Renewal Model for Life-Cycle Costing." Probabilistic Engineering Mechanics 19 (1): 171-183.
    • (2004) Probabilistic Engineering Mechanics , vol.19 , Issue.1 , pp. 171-183
    • Streicher, H.1    Rackwitz, R.2
  • 41
    • 84858078471 scopus 로고    scopus 로고
    • Optimization of preventive maintenance schedule and production lot size
    • Suliman, S. M. A., and S. H. Jawad. 2012. "Optimization of Preventive Maintenance Schedule and Production Lot Size." International Journal of Production Economics 137 (1): 19-28.
    • (2012) Ternational Journal of Production Economics , vol.137 , Issue.1 , pp. 19-28
    • Suliman, S.M.A.1    Jawad, S.H.2
  • 42
    • 0016483905 scopus 로고
    • On the distribution of the first-passagetime for normal stationary random processes
    • Vanmarcke, E. H. 1975. "On the Distribution of the First-PassageTime for Normal Stationary Random Processes." Journal of Applied Mechanics 42: 215-220.
    • (1975) Journal of Applied Mechanics , vol.42 , pp. 215-220
    • Vanmarcke, E.H.1
  • 43
    • 77955246013 scopus 로고    scopus 로고
    • Optimal design accounting for reliability, maintenance, and warranty
    • Wang, Z., X. Du, and H. Z. Huang. 2010. "Optimal Design Accounting for Reliability, Maintenance, and Warranty." Journal of Mechanical Design, Transactions of the ASME 132 (1): 0110071-0110078.
    • (2010) Journal of Mechanical Design, Transactions of the ASME , vol.132 , Issue.1 , pp. 0110071-0110078
    • Wang, Z.1    Du, X.2    Huang, H.Z.3
  • 44
    • 84870036914 scopus 로고    scopus 로고
    • A nested extreme response surface approach for time-dependent reliability-based design optimization
    • Wang, Z., and P. Wang. 2012a. "A Nested Extreme Response Surface Approach for Time-Dependent Reliability-Based Design Optimization." Journal of Mechanical Design, Transactions of the ASME 134 (12).
    • (2012) Journal of Mechanical Design, Transactions of the ASME , vol.134 , Issue.12
    • Wang, Z.1    Wang, P.2
  • 47
    • 84861093941 scopus 로고    scopus 로고
    • Degradation-based burn-in with preventive maintenance
    • Ye, Z. S., Y. Shen, and M. Xie. 2012. "Degradation-Based Burn-In with Preventive Maintenance." European Journal of Operational Research 221 (2): 360-367.
    • (2012) European Journal of Operational Research , vol.221 , Issue.2 , pp. 360-367
    • Ye, Z.S.1    Shen, Y.2    Xie, M.3
  • 49
    • 84856522113 scopus 로고    scopus 로고
    • Condition-based maintenance of dynamic systems using online failure prognosis and belief rule base
    • Zhou, Z. J., C. H. Hu, W. B. Wang, B. C. Zhang, D. L. Xu, and J. F. Zheng. 2012. "Condition-Based Maintenance of Dynamic Systems Using Online Failure Prognosis and Belief Rule Base." Expert Systems with Applications 39 (6): 6140-6149.
    • (2012) Expert Systems with Applications , vol.39 , Issue.6 , pp. 6140-6149
    • Zhou, Z.J.1    Hu, C.H.2    Wang, W.B.3    Zhang, B.C.4    Xu, D.L.5    Zheng, J.F.6
  • 50
    • 84862828759 scopus 로고    scopus 로고
    • Preventive maintenance optimization for amulti-component system under changing job shop schedule
    • Zhou, X., Z. Lu, and L. Xi. 2012. "Preventive Maintenance Optimization for aMulti-component System Under Changing Job Shop Schedule." Reliability Engineering and System Safety 101: 14-20.
    • (2012) Reliability Engineering and System Safety , vol.101 , pp. 14-20
    • Zhou, X.1    Lu, Z.2    Xi, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.