메뉴 건너뛰기




Volumn 137, Issue 1, 2012, Pages 19-28

Optimization of preventive maintenance schedule and production lot size

Author keywords

Inspection; Inventory; Lot size; Maintenance optimization models; Preventive maintenance

Indexed keywords

COST PARAMETERS; FAILURE POSSIBILITY; IN-CONTROL; INVENTORY; INVENTORY HOLDING; LOT SIZE; MAINTENANCE OPTIMIZATION MODELS; MODEL PERFORMANCE; OUT-OF-CONTROL STATE; PRODUCTION LOT SIZE; PRODUCTION SYSTEM; PRODUCTION TIME; SHORTAGE COST; SYSTEM FAILURES; TOTAL VALUES;

EID: 84858078471     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.01.006     Document Type: Article
Times cited : (30)

References (11)
  • 1
    • 0034228553 scopus 로고    scopus 로고
    • Economic lot scheduling problem with imperfect production processes
    • M. Ben-Daya, and M. Hariga Economic lot scheduling problem with imperfect production processes The Journal of the Operational Research Society 51 7 2000 875 881
    • (2000) The Journal of the Operational Research Society , vol.51 , Issue.7 , pp. 875-881
    • Ben-Daya, M.1    Hariga, M.2
  • 2
    • 0032138493 scopus 로고    scopus 로고
    • Integrated production and quality model under various preventive maintenance policies
    • M. Ben-Daya, and M. Makhdoum Integrated production and quality model under various preventive maintenance policies The Journal of the Operational Research Society 49 8 1998 840 853 (Pubitemid 128592253)
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.8 , pp. 840-853
    • Ben-Daya, M.1    Makhdoum, M.2
  • 3
    • 46149086146 scopus 로고    scopus 로고
    • Production lot sizing with process deterioration and machine breakdown under inspection schedule
    • Tulika Chakraborty, B.C. Giri, and K.S. Chaudhuri Production lot sizing with process deterioration and machine breakdown under inspection schedule Omega 37 2 2009 257 271
    • (2009) Omega , vol.37 , Issue.2 , pp. 257-271
    • Chakraborty, T.1    Giri, B.C.2    Chaudhuri, K.S.3
  • 4
    • 44849093491 scopus 로고    scopus 로고
    • Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system
    • A. Chelbi, N. Rezg, and M. Radhoui Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system Journal of Quality in Maintenance Engineering 14 2 2008 161 176
    • (2008) Journal of Quality in Maintenance Engineering , vol.14 , Issue.2 , pp. 161-176
    • Chelbi, A.1    Rezg, N.2    Radhoui, M.3
  • 5
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
    • Anis Chelbi, and Daoud Ait-Kadi Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance European Journal of Operational Research 156 3 2004 712 718
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 712-718
    • Chelbi, A.1    Ait-Kadi, D.2
  • 6
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: A review and analysis
    • DOI 10.1016/0951-8320(95)00076-3
    • R. Dekker Applications of maintenance optimization models: a review and analysis Reliability Engineering and System Safety 51 1996 229 240 (Pubitemid 126349477)
    • (1996) Reliability Engineering and System Safety , vol.51 , Issue.3 , pp. 229-240
    • Dekker, R.1
  • 7
    • 79954424271 scopus 로고    scopus 로고
    • Competition under capacitated dynamic lot-sizing with capacity acquisition
    • Li Hongyan, and J. Meissner Competition under capacitated dynamic lot-sizing with capacity acquisition International Journal of Production Economics 130 2 2011 535 544
    • (2011) International Journal of Production Economics , vol.130 , Issue.2 , pp. 535-544
    • Hongyan, L.1    Meissner, J.2
  • 8
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Hau L. Lee, and Meir J. Rosenblatt Simultaneous determination of production cycle and inspection schedules in a production system Management Science 33 9 1987 1125 1136
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 10
    • 76349103481 scopus 로고    scopus 로고
    • The economic lot-sizing problem with remanufacturing and one-way substitution
    • P. Pineyro, and O. Viera The economic lot-sizing problem with remanufacturing and one-way substitution International Journal of Production Economics 124 2 2010 482 488
    • (2010) International Journal of Production Economics , vol.124 , Issue.2 , pp. 482-488
    • Pineyro, P.1    Viera, O.2
  • 11


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.