-
1
-
-
0029253563
-
Algorithm for multiple disassembly and parallel assemblies
-
10.1115/1.2803269
-
Dutta D, Woo TC (1995) Algorithm for multiple disassembly and parallel assemblies. ASME Journal of Engineering for Industry 117:102-109
-
(1995)
ASME Journal of Engineering for Industry
, vol.117
, pp. 102-109
-
-
Dutta, D.1
Woo, T.C.2
-
2
-
-
78650171491
-
Product cooperative disassembly sequence planning based on branch-and-bound algorithm
-
10.1007/s00170-010-2682-7
-
Zhang XF, Zhang SY (2010) Product cooperative disassembly sequence planning based on branch-and-bound algorithm. Int J Adv Manuf Technol 51(9-12):1139-1147
-
(2010)
Int J Adv Manuf Technol
, vol.51
, Issue.9-12
, pp. 1139-1147
-
-
Zhang, X.F.1
Zhang, S.Y.2
-
5
-
-
0035546631
-
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
-
10.1016/S0377-2217(00)00321-0 1004.90030
-
Moore KE, Gungor A, Gupta SM (2001) Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships. European Journal of Operational research 135(2):428-449
-
(2001)
European Journal of Operational Research
, vol.135
, Issue.2
, pp. 428-449
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
7
-
-
41849102340
-
Methods for optimum and near optimum disassembly sequencing
-
10.1080/00207540601120484 1141.90404
-
Lambert AJD, Gupta SM (2008) Methods for optimum and near optimum disassembly sequencing. Int J Prod Res 46(11):2845-2865
-
(2008)
Int J Prod Res
, vol.46
, Issue.11
, pp. 2845-2865
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
8
-
-
33748526878
-
Disassembly sequencing using genetic algorithm
-
10.1007/s00170-005-0041-x
-
Kongar E, Gupta SM (2006) Disassembly sequencing using genetic algorithm. Int J Adv Manuf Technol 30:497-506
-
(2006)
Int J Adv Manuf Technol
, vol.30
, pp. 497-506
-
-
Kongar, E.1
Gupta, S.M.2
-
9
-
-
33748559516
-
Ant colony optimization for disassembly sequencing with multiple objectives
-
10.1007/s00170-005-0037-6
-
McGovern SM, Gupta SM (2006) Ant colony optimization for disassembly sequencing with multiple objectives. Int J Adv Manuf Technol 30:481-496
-
(2006)
Int J Adv Manuf Technol
, vol.30
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
-
10
-
-
84867576451
-
Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
-
10.1007/s00170-011-3531-z
-
Liu XH, Peng GL, Liu XM, Hou YF (2012) Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system. Int J Adv Manuf Technol 59:829-839
-
(2012)
Int J Adv Manuf Technol
, vol.59
, pp. 829-839
-
-
Liu, X.H.1
Peng, G.L.2
Liu, X.M.3
Hou, Y.F.4
-
11
-
-
83555172306
-
A green assembly sequence planning model with a closed-loop assembly and disassembly sequence planning using a particle swarm optimization method
-
10.1007/s00170-011-3339-x
-
Tseng YJ, Yu FY, Huang FY (2011) A green assembly sequence planning model with a closed-loop assembly and disassembly sequence planning using a particle swarm optimization method. Int J Adv Manuf Technol 57:1183-1197
-
(2011)
Int J Adv Manuf Technol
, vol.57
, pp. 1183-1197
-
-
Tseng, Y.J.1
Yu, F.Y.2
Huang, F.Y.3
-
13
-
-
0026157024
-
Automatic disassembly and total ordering in three dimensions
-
10.1115/1.2899679
-
Woo TC, Dutta D (1991) Automatic disassembly and total ordering in three dimensions. ASME Journal of Engineering for Industry 113:207-213
-
(1991)
ASME Journal of Engineering for Industry
, vol.113
, pp. 207-213
-
-
Woo, T.C.1
Dutta, D.2
-
14
-
-
84903266953
-
A parallel disassembly method for green product design
-
Smith S, Hung PY(2012)A parallel disassembly method for green product design. IEEE, pp1-6.
-
(2012)
IEEE
, pp. 1-6
-
-
Smith, S.1
Hung, P.Y.2
-
16
-
-
0034963174
-
Parallel disassembly sequencing with sequence-dependent operation times
-
10.1016/S0007-8506(07)62136-2
-
Kang JG, Lee DH, Xirouchakis P, Persson JG (2001) Parallel disassembly sequencing with sequence-dependent operation times. CIRP Annals-Manufacturing Technology 50(1):343-346
-
(2001)
CIRP Annals-Manufacturing Technology
, vol.50
, Issue.1
, pp. 343-346
-
-
Kang, J.G.1
Lee, D.H.2
Xirouchakis, P.3
Persson, J.G.4
-
18
-
-
0037962814
-
Reversibility and disassembly time of part connection
-
10.1016/S0921-3449(02)00153-2
-
Kondo Y, Deguchi K, Hayashi Y, Obata F (2003) Reversibility and disassembly time of part connection. Resour Conserv Recycl 38:175-184
-
(2003)
Resour Conserv Recycl
, vol.38
, pp. 175-184
-
-
Kondo, Y.1
Deguchi, K.2
Hayashi, Y.3
Obata, F.4
-
20
-
-
38749139283
-
Modular design to support green life-cycle engineering
-
10.1016/j.eswa.2007.04.018
-
Tseng HE, Chang CC, Li JD (2008) Modular design to support green life-cycle engineering. Expert Syst Appl 34:2524-2537
-
(2008)
Expert Syst Appl
, vol.34
, pp. 2524-2537
-
-
Tseng, H.E.1
Chang, C.C.2
Li, J.D.3
-
21
-
-
62749154916
-
Rough fuzzy set-based image compression
-
10.1016/j.fss.2008.11.011 1182.68344 2513749
-
Petrosino A, Ferone A (2009) Rough fuzzy set-based image compression. Fuzzy Sets Syst 160:1485-1506
-
(2009)
Fuzzy Sets Syst
, vol.160
, pp. 1485-1506
-
-
Petrosino, A.1
Ferone, A.2
-
22
-
-
84855874288
-
Genetically optimized disassembly sequence for automotive component reuse
-
10.1016/j.eswa.2011.11.044
-
Go TF, Wahab DA, Rahman MNAB, Ramli R, Hussain A (2012) Genetically optimized disassembly sequence for automotive component reuse. Expert Syst Appl 39:5409-5417
-
(2012)
Expert Syst Appl
, vol.39
, pp. 5409-5417
-
-
Go, T.F.1
Wahab, D.A.2
Rahman, M.3
Ramli, R.4
Hussain, A.5
|