메뉴 건너뛰기




Volumn 57, Issue 9-12, 2011, Pages 1183-1197

A green assembly sequence planning model with a closed-loop assembly and disassembly sequence planning using a particle swarm optimization method

Author keywords

Assembly sequence planning; Disassembly sequence planning; Particle swarm optimization; Process planning

Indexed keywords

ASSEMBLY COSTS; ASSEMBLY SEQUENCE; ASSEMBLY SEQUENCE PLANNING; CLOSED-LOOP; CLOSED-LOOP MODEL; DISASSEMBLY SEQUENCE; DISASSEMBLY SEQUENCE PLANNING; ENCODING SCHEMES; GRAPH-BASED MODELS; GREEN PRODUCTS; PARTICLE SWARM; PARTICLE SWARM OPTIMIZATION METHOD;

EID: 83555172306     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3339-x     Document Type: Article
Times cited : (69)

References (45)
  • 1
    • 0023537240 scopus 로고
    • Simplified generation of all mechanical assembly Sequences
    • 10.1109/JRA.1987.1087132
    • TL De Fazio DE Whitney 1987 Simplified generation of all mechanical assembly Sequences IEEE J Robotics Autom 3 6 640 658 10.1109/JRA.1987.1087132
    • (1987) IEEE J Robotics Autom , vol.3 , Issue.6 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 2
    • 0026142517 scopus 로고
    • Representation of mechanical assembly sequences
    • 10.1109/70.75904
    • LS Homem de Mello AC Sanderson 1991 Representation of mechanical assembly sequences IEEE Trans Robot Autom 7 5 211 227 10.1109/70.75904
    • (1991) IEEE Trans Robot Autom , vol.7 , Issue.5 , pp. 211-227
    • Homem De Mello, L.S.1    Sanderson, A.C.2
  • 3
    • 0027067346 scopus 로고
    • Computer-aided planning of assembly operations. The selection of assembly sequences
    • M Santochi G Dini 1992 Computer-aided planning of assembly operations: the selection of assembly sequences Robot Comput Integr Manuf 9 6 439 446 (Pubitemid 23560462)
    • (1992) Robotics and Computer-Integrated Manufacturing , vol.9 , Issue.6 , pp. 439-446
    • Santochi, M.1    Dini, G.2
  • 4
    • 0027589546 scopus 로고
    • Integrated approach to automated assembly planning for three-dimensional mechanical products
    • AC Lin TC Chang 1993 An integrated approach to automated assembly planning for three-dimensional mechanical products Int J Prod Res 31 5 1201 1227 10.1080/00207549308956784 (Pubitemid 23639949)
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1201-1227
    • Lin, A.C.1    Chang, T.C.2
  • 5
    • 77951584645 scopus 로고    scopus 로고
    • GAPP: A Generative Assembly Process Planner
    • 10.1016/0278-6125(96)84553-5
    • L Laperriere HA ElMaraghy 1996 GAPP: A Generative Assembly Process Planner J Manuf Syst 15 4 282 293 10.1016/0278-6125(96)84553-5
    • (1996) J Manuf Syst , vol.15 , Issue.4 , pp. 282-293
    • Laperriere, L.1    Elmaraghy, H.A.2
  • 6
    • 0242269889 scopus 로고    scopus 로고
    • A review of the support tools for the process of assembly method selection and assembly planning
    • 10.1080/002075431000087265
    • TA Abdullah K Popplewell CJ Page 2003 A review of the support tools for the process of assembly method selection and assembly planning Int J Prod Res 41 11 2391 2410 10.1080/002075431000087265
    • (2003) Int J Prod Res , vol.41 , Issue.11 , pp. 2391-2410
    • Abdullah, T.A.1    Popplewell, K.2    Page, C.J.3
  • 7
    • 0031373295 scopus 로고    scopus 로고
    • Representation and selection of assembly sequences in computer-aided assembly process planning
    • RB Gottipolu K Ghosh 1997 Representation and selection of assembly sequences in computer-aided assembly process planning Int J Prod Res 35 12 3447 3465 0942.90544 10.1080/002075497194183 (Pubitemid 127700303)
    • (1997) International Journal of Production Research , vol.35 , Issue.12 , pp. 3447-3465
    • Gottipolu, R.B.1    Ghosh, K.2
  • 8
    • 9944252896 scopus 로고    scopus 로고
    • A systematic approach for automatic assembly sequence plan generation
    • 10.1007/s00170-003-1760-5
    • H-Y Lai C-T Huang 2004 A systematic approach for automatic assembly sequence plan generation Int J Adv Manuf Technol 24 9-10 752 763 10.1007/s00170-003-1760-5
    • (2004) Int J Adv Manuf Technol , vol.24 , Issue.910 , pp. 752-763
    • Lai, H.-Y.1    Huang, C.-T.2
  • 9
    • 33847091707 scopus 로고    scopus 로고
    • Assembly planning based on semantic modeling approach
    • DOI 10.1016/j.compind.2006.05.002, PII S0166361506000911
    • H Wang D Xiang G Duan L Zhang 2007 Assembly planning based on semantic modeling approach Comput Ind 58 3 227 239 10.1016/j.compind.2006.05.002 (Pubitemid 46283004)
    • (2007) Computers in Industry , vol.58 , Issue.3 , pp. 227-239
    • Hui, W.1    Dong, X.2    Guanghong, D.3    Linxuan, Z.4
  • 10
    • 34250699017 scopus 로고    scopus 로고
    • Computer aided geometric feasible assembly sequence planning and optimizing
    • DOI 10.1007/s00170-006-0447-0
    • Q Su 2007 Computer aided geometric feasible assembly sequence planning and optimizing Int J Adv Manuf Technol 33 1-2 48 57 10.1007/s00170-006-0447-0 (Pubitemid 46959441)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.1-2 , pp. 48-57
    • Su, Q.1
  • 12
    • 34250191469 scopus 로고    scopus 로고
    • Multi-plant assembly planning models for a collaborative manufacturing environment
    • DOI 10.1080/00207540600788968, PII 779453577
    • Y-J Tseng J-F Jhang F-Y Huang 2007 Multi-plant assembly panning models for a collaborative manufacturing environment Int J Prod Res 45 15 3333 3349 1128.90458 10.1080/00207540600788968 (Pubitemid 46907026)
    • (2007) International Journal of Production Research , vol.45 , Issue.15 , pp. 3333-3349
    • Tseng, Y.-J.1    Jhang, J.-F.2    Huang, F.-Y.3
  • 14
    • 1642269241 scopus 로고    scopus 로고
    • Optimizing assembly planning through a three-stage integrated approach
    • 10.1016/S0925-5273(03)00187-7
    • RS Chen K-Y Lu PH Tai 2004 Optimizing assembly planning through a three-stage integrated approach Int J Prod Econ 88 3 243 256 10.1016/S0925-5273(03)00187-7
    • (2004) Int J Prod Econ , vol.88 , Issue.3 , pp. 243-256
    • Chen, R.S.1    Lu, K.-Y.2    Tai, P.H.3
  • 15
    • 15844375543 scopus 로고    scopus 로고
    • Assembly sequence planning and optimisation using genetic algorithms Part I. Automatic generation of feasible assembly sequences
    • DOI 10.1016/S1568-4946(02)00064-9, PII S1568494602000649
    • RM Marian LHS Luong K Abhary 2003 Assembly sequence planning and optimization using genetic algorithms Appl Soft Comput 2 3 223 253 10.1016/S1568-4946(02)00064-9 (Pubitemid 40421589)
    • (2003) Applied Soft Computing Journal , vol.2 , Issue.3 , pp. 223-253
    • Marian, R.M.1    Luong, L.H.S.2    Abhary, K.3
  • 16
    • 0038341720 scopus 로고    scopus 로고
    • A Tabu-enhanced genetic algorithm approach for assembly process planning
    • 10.1023/A:1022903514179
    • JR Li LP Khoo SB Tor 2003 A Tabu-enhanced genetic algorithm approach for assembly process planning J Intell Manuf 14 2 197 208 10.1023/A:1022903514179
    • (2003) J Intell Manuf , vol.14 , Issue.2 , pp. 197-208
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 17
    • 1542609867 scopus 로고    scopus 로고
    • Using multiple genetic operators to reduce premature convergence in genetic assembly planning
    • 10.1016/j.compind.2003.08.001
    • SS-F Smith 2004 Using multiple genetic operators to reduce premature convergence in genetic assembly planning Comput Ind 54 1 35 49 10.1016/j.compind.2003.08.001
    • (2004) Comput Ind , vol.54 , Issue.1 , pp. 35-49
    • Ss-F, S.1
  • 18
    • 38949181990 scopus 로고    scopus 로고
    • Integrated assembly and machining planning for electronic products using a genetic algorithm approach
    • DOI 10.1007/s00170-006-0815-9
    • Y-J Tseng C-H Lin Y-H Lin 2008 Integrated assembly and machining planning for electronic products using a genetic algorithm approach Int J Adv Manuf Technol 30 1-2 140 155 10.1007/s00170-006-0815-9 (Pubitemid 351214893)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.1-2 , pp. 140-155
    • Tseng, Y.-J.1    Lin, C.-H.2    Lin, Y.-H.3
  • 19
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • 1059.90055 10.1080/0020754031000120078
    • AJD Lambert 2003 Disassembly sequencing: a survey Int J Prod Res 41 16 3721 3759 1059.90055 10.1080/0020754031000120078
    • (2003) Int J Prod Res , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 20
    • 0037138045 scopus 로고    scopus 로고
    • Disassembly matrix for disassembly processes of products
    • DOI 10.1080/00207540110079770
    • YM Huang CT Huang 2002 Disassembly matrix for disassembly processed of products Int J Prod Res 40 2 255 273 1060.90566 10.1080/00207540110079770 (Pubitemid 34593827)
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 255-273
    • Huang, Y.M.1    Huang, C.-T.2
  • 21
    • 0035866455 scopus 로고    scopus 로고
    • Disassembly sequence plan generation using a branch-and-bound algorithm
    • DOI 10.1080/00207540010002838
    • A Gungor M Gupta 2001 Disassembly sequence plan generation using a branch-and-bound algorithm Int J Prod Res 39 1 481 509 10.1080/00207540010002838 (Pubitemid 35170222)
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 481-509
    • Gungor, A.1    Gupta, S.M.2
  • 22
    • 0034808349 scopus 로고    scopus 로고
    • Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects
    • DOI 10.1007/s001700170061
    • K-K Seo J-H Park D-S Jang 2001 Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects Int J Adv Manuf Technol 18 5 371 380 10.1007/s001700170061 (Pubitemid 32914692)
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , Issue.5 , pp. 371-380
    • Seo, K.-K.1    Park, J.-H.2    Jang, D.-S.3
  • 23
    • 0036303260 scopus 로고    scopus 로고
    • Mechanical product disassembly sequence and path planning based on knowledge and geometric reasoning
    • DOI 10.1007/s001700200114
    • D Hu Y Hu C Li 2001 Mechanical product disassembly sequence and path planning based on knowledge and geometric reasoning Int J Adv Manuf Technol 19 9 688 696 10.1007/s001700200114 (Pubitemid 34725462)
    • (2002) International Journal of Advanced Manufacturing Technology , vol.19 , Issue.9 , pp. 688-696
    • Hu, D.1    Hu, Y.2    Li, C.3
  • 24
    • 0037274721 scopus 로고    scopus 로고
    • Disassembly planning based on precedence relations among assemblies
    • 10.1007/s001700300037
    • F Torres ST Puente R Aracil 2003 Disassembly planning based on precedence relations among assemblies Int J Adv Manuf Technol 21 5 317 327 10.1007/s001700300037
    • (2003) Int J Adv Manuf Technol , vol.21 , Issue.5 , pp. 317-327
    • Torres, F.1    Puente, S.T.2    Aracil, R.3
  • 25
    • 3042697893 scopus 로고    scopus 로고
    • Virtual disassembly of products based on geometric models
    • 10.1016/j.compind.2004.03.001
    • J Pomares ST Puente F Torres FA Candelas P Gil 2004 Virtual disassembly of products based on geometric models Comput Ind 55 1 1 14 10.1016/j.compind. 2004.03.001
    • (2004) Comput Ind , vol.55 , Issue.1 , pp. 1-14
    • Pomares, J.1    Puente, S.T.2    Torres, F.3    Candelas, F.A.4    Gil, P.5
  • 26
    • 24144494525 scopus 로고    scopus 로고
    • An object-oriented intelligent disassembly sequence planner for maintenance
    • DOI 10.1016/j.compind.2005.03.005, PII S0166361505000655
    • JR Li LP Khoo SB Tor 2005 An object-oriented intelligent disassembly sequence planner for maintenance Comput Ind 56 7 699 718 1095.90057 10.1016/j.compind.2005.03.005 (Pubitemid 41230990)
    • (2005) Computers in Industry , vol.56 , Issue.7 , pp. 699-718
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 27
    • 33748526878 scopus 로고    scopus 로고
    • Disassembly sequencing using genetic algorithm
    • DOI 10.1007/s00170-005-0041-x, Intelligent Disassembly in the Demanufacturing Process
    • E Kongar SM Gupta 2006 Disassembly sequencing using genetic algorithm Int J Adv Manuf Technol 30 5-6 497 506 10.1007/s00170-005-0041-x (Pubitemid 44370985)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 497-506
    • Kongar, E.1    Gupta, S.M.2
  • 28
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling, planning and applications
    • 10.1016/S0278-6125(02)80162-5
    • Y Tang MC Zhou E Zussman RJ Caudill 2002 Disassembly modeling, planning and applications J Manuf Syst 21 2 200 217 10.1016/S0278-6125(02)80162-5
    • (2002) J Manuf Syst , vol.21 , Issue.2 , pp. 200-217
    • Tang, Y.1    Zhou, M.C.2    Zussman, E.3    Caudill, R.J.4
  • 30
    • 77954214844 scopus 로고    scopus 로고
    • A multi-plant assembly sequence planning model with integrated assembly sequence planning and plant assignment using GA
    • 10.1007/s00170-009-2264-8
    • Y-J Tseng J-Y Chen F-Y Huang 2010 A multi-plant assembly sequence planning model with integrated assembly sequence planning and plant assignment using GA Int J Adv Manuf Technol 48 1-4 333 345 10.1007/s00170-009-2264-8
    • (2010) Int J Adv Manuf Technol , vol.48 , Issue.14 , pp. 333-345
    • Tseng, Y.-J.1    Chen, J.-Y.2    Huang, F.-Y.3
  • 31
    • 77953611168 scopus 로고    scopus 로고
    • Design automation and optimization of assembly sequences for complex mechanical systems
    • 10.1007/s00170-009-2361-8
    • S Jin W Cai X Lai Z Lin 2010 Design automation and optimization of assembly sequences for complex mechanical systems Int J Adv Manuf Technol 48 9-12 1045 1059 10.1007/s00170-009-2361-8
    • (2010) Int J Adv Manuf Technol , vol.48 , Issue.912 , pp. 1045-1059
    • Jin, S.1    Cai, W.2    Lai, X.3    Lin, Z.4
  • 32
    • 77956231886 scopus 로고    scopus 로고
    • Application of memetic algorithm in assembly sequence planning
    • 10.1007/s00170-009-2449-1
    • L Gao W Qian X Li J-F Wang 2010 Application of memetic algorithm in assembly sequence planning Int J Adv Manuf Technol 49 9-12 1175 1184 10.1007/s00170-009-2449-1
    • (2010) Int J Adv Manuf Technol , vol.49 , Issue.912 , pp. 1175-1184
    • Gao, L.1    Qian, W.2    Li, X.3    Wang, J.-F.4
  • 33
    • 78650281058 scopus 로고    scopus 로고
    • An assembly sequence planning approach with a discrete particle swam optimization algorithm
    • 10.1007/s00170-010-2519-4
    • H-G Lv C Lu 2010 An assembly sequence planning approach with a discrete particle swam optimization algorithm Int J Adv Manuf Technol 50 5-8 761 770 10.1007/s00170-010-2519-4
    • (2010) Int J Adv Manuf Technol , vol.50 , Issue.58 , pp. 761-770
    • Lv, H.-G.1    Lu, C.2
  • 34
    • 78650171491 scopus 로고    scopus 로고
    • Product cooperative disassembly sequence planning based on branch-and-bound algorithm
    • 10.1007/s00170-010-2682-7
    • X-F Zhang S-Y Zhang 2010 Product cooperative disassembly sequence planning based on branch-and-bound algorithm Int J Adv Manuf Technol 51 9-12 1139 1147 10.1007/s00170-010-2682-7
    • (2010) Int J Adv Manuf Technol , vol.51 , Issue.912 , pp. 1139-1147
    • Zhang, X.-F.1    Zhang, S.-Y.2
  • 35
    • 79958829968 scopus 로고    scopus 로고
    • A knowledge-based engineering system for assembly sequence planning
    • doi: 10.1007/s00170-010-3093-5
    • Hsu Y-Y, Tai P-H, Wang M-W, and Chen W-C (2010) A knowledge-based engineering system for assembly sequence planning. Int J Adv Manuf Technol, doi: 10.1007/s00170-010-3093-5
    • (2010) Int J Adv Manuf Technol
    • Hsu, Y.-Y.1    Tai, P.-H.2    Wang, M.-W.3    Chen, W.-C.4
  • 36
    • 84907421492 scopus 로고    scopus 로고
    • A novel hybrid algorithm for assembly sequence planning combining bacterial chemotaxis with genetic algorithm
    • 10.1007/s00170-010-2738-8
    • W Zhou J-R Zheng J-J Yan J-F Wang 2011 A novel hybrid algorithm for assembly sequence planning combining bacterial chemotaxis with genetic algorithm Int J Adv Manuf Technol 52 5-8 715 724 10.1007/s00170-010-2738-8
    • (2011) Int J Adv Manuf Technol , vol.52 , Issue.58 , pp. 715-724
    • Zhou, W.1    Zheng, J.-R.2    Yan, J.-J.3    Wang, J.-F.4
  • 38
    • 39049136085 scopus 로고    scopus 로고
    • A review of particle swarm optimization. Part II: Hybridisation, combinatorial, multicriteria and constrained optimization, and indicative applications
    • DOI 10.1007/s11047-007-9050-z
    • A Banks J Vincent C Anyakoha 2008 A review of particle swarm optimization. Part II: hybridization, combinatorial, multicriteria and constrained optimization, and indicative applications Nat Comput 7 1 109 124 2407935 1148.68375 10.1007/s11047-007-9050-z (Pubitemid 351234459)
    • (2008) Natural Computing , vol.7 , Issue.1 , pp. 109-124
    • Banks, A.1    Vincent, J.2    Anyakoha, C.3
  • 39
    • 33749545539 scopus 로고    scopus 로고
    • Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem
    • DOI 10.1080/00207540600620849, PII H481323H2J7K7404
    • MF Tasgetiren YC Liang M Sevkli G Gencyilmaz 2006 Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem Int J Prod Res 44 22 4737 4754 1114.90391 10.1080/ 00207540600620849 (Pubitemid 44536480)
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4737-4754
    • Tasgetiren, M.F.1    Liang, Y.-C.2    Sevkli, M.3    Gencyilmaz, G.4
  • 40
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • 1159.90408 10.1080/00207540701294627
    • C-T Tseng C-J Liao 2008 A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks Int J Prod Res 46 17 4655 4670 1159.90408 10.1080/00207540701294627
    • (2008) Int J Prod Res , vol.46 , Issue.17 , pp. 4655-4670
    • Tseng, C.-T.1    Liao, C.-J.2
  • 41
    • 33744526968 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization approach for the job-shop scheduling problem
    • DOI 10.1007/s00170-005-2513-4
    • W-J Xia Z-M Wu 2006 A hybrid particle swarm optimization approach for the job-shop scheduling problem Int J Adv Manuf Technol 29 3-4 360 366 10.1007/s00170-005-2513-4 (Pubitemid 43814109)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.3-4 , pp. 360-366
    • Xia, W.-J.1    Wu, Z.-M.2
  • 42
    • 33846194668 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    • DOI 10.1007/s00170-005-0277-5
    • B Liu L Wang Y-H Jun 2007 An effective hybrid particle swarm optimization for no-wait flow shop scheduling Int J Adv Manuf Technol 31 9-10 1001 1011 10.1007/s00170-005-0277-5 (Pubitemid 46092501)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , Issue.9-10 , pp. 1001-1011
    • Liu, B.1    Wang, L.2    Jin, Y.-H.3
  • 43
    • 49349115620 scopus 로고    scopus 로고
    • A hybrid discrete particle swarm optimization for the no-wait flow shop scheduling problem with makespan criterion
    • 10.1007/s00170-007-1099-4
    • Q-K Pan L Wang MF Tasgetiren B-H Zhao 2008 A hybrid discrete particle swarm optimization for the no-wait flow shop scheduling problem with makespan criterion Int J Adv Manuf Technol 38 3-4 337 347 10.1007/s00170-007-1099-4
    • (2008) Int J Adv Manuf Technol , vol.38 , Issue.34 , pp. 337-347
    • Pan, Q.-K.1    Wang, L.2    Tasgetiren, M.F.3    Zhao, B.-H.4
  • 44
    • 36048931426 scopus 로고    scopus 로고
    • A particle swarm optimization approach to optimize component placement in printed circuit board assembly
    • DOI 10.1007/s00170-006-0777-y
    • Y-M Chen C-T Lin 2007 A particle swarm optimization approach to optimization component placement in printed circuit board assembly Int J Adv Manuf Technol 35 5-6 610 620 10.1007/s00170-006-0777-y (Pubitemid 350098204)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.35 , Issue.5-6 , pp. 610-620
    • Chen, Y.-M.1    Lin, C.-T.2
  • 45
    • 70449632611 scopus 로고    scopus 로고
    • Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach
    • 1198.90183 10.1080/00207540701827905
    • YW Guo WD Li AR Mileham GW Owen 2009 Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach Int J Prod Res 47 14 3775 3796 1198.90183 10.1080/00207540701827905
    • (2009) Int J Prod Res , vol.47 , Issue.14 , pp. 3775-3796
    • Guo, Y.W.1    Li, W.D.2    Mileham, A.R.3    Owen, G.W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.