Volumn 48, Issue 1, 2014, Pages

Using vibration damping optimization algorithm for resource constraint project scheduling problem with weighted earliness-tardiness penalties and interval due dates

Author keywords

Earliness tardiness; Project scheduling; Resource constrained; Simulated annealing and vibration damping optimization

Indexed keywords


EID: 84902150856     PISSN: 0424267X     EISSN: 18423264     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (26)
  • 1
    • 46149106378 scopus 로고    scopus 로고
    • An Algorithm for the Weighted Earliness-Tardiness Unconstrained Project scheduling Problem
    • Afshar-Nadjafi, B. and Shadrok, Sh. (2008), An Algorithm for the Weighted Earliness-Tardiness Unconstrained Project scheduling Problem; Journal of Applied Sciences: 1651-1659
    • (2008) Journal of Applied Sciences , pp. 1651-1659
    • Afshar-Nadjafi, B.1    Shadrok, S.2
  • 2
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained Project Scheduling by Simulated Annealin
    • Boctor, F. F. (1996), Resource-constrained Project Scheduling by Simulated Annealin; International Journal of Production Research 34 2335-2351
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 3
    • 0037508562 scopus 로고    scopus 로고
    • A New Efficient Simulated Annealing Algorithm for the Resource Constrained Project Scheduling Problem and its Multiple Mode Version
    • Bouleimen, K. and Lecocq, H. (2003), A New Efficient Simulated Annealing Algorithm for the Resource Constrained Project Scheduling Problem and its Multiple Mode Version; European Journal of Operational Research: 149, 268-281;
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 7
    • 13444274538 scopus 로고    scopus 로고
    • On the Fallacy of Averages in Project Risk Management
    • Elmaghraby, S. E. (2005), On the Fallacy of Averages in Project Risk Management; European Journal of Operational Research, 165 (2), 307-313
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 307-313
    • Elmaghraby, S.E.1
  • 9
    • 0030262162 scopus 로고    scopus 로고
    • A Branch & Bound Procedure for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows
    • Icemeli, O. and Erenguc, S. S. (1996), A Branch & Bound Procedure for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows; Management science, 42, 1395-1408;
    • (1996) Management Science , vol.42 , pp. 1395-1408
    • Icemeli, O.1    Erenguc, S.S.2
  • 10
    • 0002866635 scopus 로고
    • The Critical-path Method: Resources planning and scheduling
    • Muth, J. F. and G. L. Thompson (eds.), Prentice-Hall, Englewood Cliffs, NJ
    • Kelley, J. E. (1963), The Critical-path Method: Resources planning and scheduling; In: Industrial scheduling, Muth, J. F. and G. L. Thompson (eds.), Prentice-Hall, Englewood Cliffs, NJ, 347-365;
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 11
    • 26444479778 scopus 로고
    • Optimization by Simulated Annealing
    • Kirk Patrick, S., Gellat, C. D, and Vecchi, M. P. (1983), Optimization by Simulated Annealing; Science: 671-680
    • (1983) Science , pp. 671-680
    • Kirk, P.S.1    Gellat, C.D.2    Vecchi, M.P.3
  • 12
    • 0032666848 scopus 로고    scopus 로고
    • Theory and Methodology Scheduling Projects with Variable-intensity Activities: The case of dynamic earliness and tardiness costs
    • Kogan, K. and Shtub, A. (1999), Theory and Methodology Scheduling Projects with Variable-intensity Activities: The case of dynamic earliness and tardiness costs; European Journal of Operational Research, 118, 65-80
    • (1999) European Journal of Operational Research , vol.118 , pp. 65-80
    • Kogan, K.1    Shtub, A.2
  • 13
    • 84885176419 scopus 로고    scopus 로고
    • Resource Constrained Project Scheduling Problem with Discounted Earliness-tardiness Penalties: Mathematical modeling and solving procedure
    • Khoshjahan, Y., Najafi, A. A. and Afshar-Nadjafi, B. (2013), Resource Constrained Project Scheduling Problem with Discounted Earliness-tardiness Penalties: Mathematical modeling and solving procedure. Computers & Industrial Engineering, 66(2), 293-300;
    • (2013) Computers & Industrial Engineering , vol.66 , Issue.2 , pp. 293-300
    • Khoshjahan, Y.1    Najafi, A.A.2    Afshar-Nadjafi, B.3
  • 14
    • 0027306874 scopus 로고
    • Resource-constrained Multi-project Scheduling with Tardy Costs: Comparing Myopic Bottleneck and Resource Pricing Heuristics
    • Lawrence, S. R., Morton, T. E. (1993), Resource-constrained Multi-project Scheduling with Tardy Costs: Comparing Myopic Bottleneck and Resource Pricing Heuristics; European Journal of Operational Research, 64, 168-187;
    • (1993) European Journal of Operational Research , vol.64 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 16
    • 77950273684 scopus 로고    scopus 로고
    • PhD thesis, Departamento de Engenharia Mecânica e Gestão Industrial, Faculdade de Engenharia da Universidade do Porto, Porto, Portugal;
    • Mendes, J. J. M. (2003), Sistema de apoio a decisão para planeamento de sistemas de produção do tipo project,. PhD thesis, Departamento de Engenharia Mecânica e Gestão Industrial, Faculdade de Engenharia da Universidade do Porto, Porto, Portugal;
    • (2003) Sistema De Apoio A Decisão Para Planeamento De Sistemas De Produção Do Tipo Project
    • Mendes, J.J.M.1
  • 18
    • 12244289668 scopus 로고    scopus 로고
    • Simulated Annealing and Tabu Search for Multi-mode Resource-constrained Project Scheduling with Positive Discounted Cash Flows and Different Payment Models
    • Mika, M., Walig-ora, G. and Wezglarz, J. (2005), Simulated Annealing and Tabu Search for Multi-mode Resource-constrained Project Scheduling with Positive Discounted Cash Flows and Different Payment Models; European Journal of Operational Research, 164, 639-668;
    • (2005) European Journal of Operational Research , vol.164 , pp. 639-668
    • Mika, M.1    Walig-Ora, G.2    Wezglarz, J.3
  • 20
    • 33847297058 scopus 로고    scopus 로고
    • A Genetic Algorithm for Resource Investment Project Scheduling Problem, Tardiness Permitted with Penalty
    • Shadrokh, Sh. and Kianfar, F. (2007), A Genetic Algorithm for Resource Investment Project Scheduling Problem, Tardiness Permitted with Penalty, European Journal of Operational Research, 181, 86-101
    • (2007) European Journal of Operational Research , vol.181 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 26
    • 13444278798 scopus 로고    scopus 로고
    • Hybrid Genetic Algorithm with Adaptive Abilities for Resource-constrained Multiple Project Scheduling
    • Wook K., Yunb, Y. S, Yoonc J. M., Gend, M., Yamazakia, G. (2005), Hybrid Genetic Algorithm with Adaptive Abilities for Resource-constrained Multiple Project Scheduling, Computers in Industry, 56, 143-160.
    • (2005) Computers In Industry , vol.56 , pp. 143-160
    • Wook, K.1    Yunb, Y.S.2    Yoonc, J.M.3    Gend, M.4    Yamazakia, G.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.