메뉴 건너뛰기




Volumn 154, Issue , 2014, Pages 136-145

Learning dependent job scheduling in mass customized scenarios considering ergonomic factors

Author keywords

Human factors; Learning curve; Scheduling; Total weight tardiness

Indexed keywords

COST REDUCTION; ERGONOMICS; HUMAN ENGINEERING; INDUSTRIAL APPLICATIONS;

EID: 84901702951     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2014.04.016     Document Type: Article
Times cited : (20)

References (54)
  • 1
    • 0032026499 scopus 로고    scopus 로고
    • Scheduling under a common due-date on parallel unrelated machines
    • G. Adamopoulos, and C. Pappis Scheduling under a common due-date on parallel unrelated machines Eur. J. Oper. Res. 105 1998 494 501
    • (1998) Eur. J. Oper. Res. , vol.105 , pp. 494-501
    • Adamopoulos, G.1    Pappis, C.2
  • 2
    • 33846938257 scopus 로고    scopus 로고
    • The effects of learning and forgetting on the optimal production lot size for deteriorating items with time varying demand and deterioration rates
    • A. Alamri, and Z. Balkhi The effects of learning and forgetting on the optimal production lot size for deteriorating items with time varying demand and deterioration rates Int. J. Prod. Econ. 107 1 2007 125 138
    • (2007) Int. J. Prod. Econ. , vol.107 , Issue.1 , pp. 125-138
    • Alamri, A.1    Balkhi, Z.2
  • 3
    • 52049112160 scopus 로고    scopus 로고
    • A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times
    • D. Anghinolfi, and M. Paolucci A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times Eur. J. Oper. Res. 193 2009 73 85
    • (2009) Eur. J. Oper. Res. , vol.193 , pp. 73-85
    • Anghinolfi, D.1    Paolucci, M.2
  • 4
    • 77956908677 scopus 로고    scopus 로고
    • Scheduling learning dependent jobs in customised assembly lines
    • M.J. Anzanello, and F.S. Fogliatto Scheduling learning dependent jobs in customised assembly lines Int. J. Prod. Res. 48 2010 6683 6699
    • (2010) Int. J. Prod. Res. , vol.48 , pp. 6683-6699
    • Anzanello, M.J.1    Fogliatto, F.S.2
  • 5
    • 34249043857 scopus 로고    scopus 로고
    • Learning curve modelling of work assignment in mass customized assembly lines
    • M.J. Anzanello, and F. Fogliatto Learning curve modelling of work assignment in mass customized assembly lines Int. J. Prod. Res. 45 2007 2919 2938
    • (2007) Int. J. Prod. Res. , vol.45 , pp. 2919-2938
    • Anzanello, M.J.1    Fogliatto, F.2
  • 6
    • 79951726711 scopus 로고    scopus 로고
    • Selecting the best clustering variables for grouping mass-customized products involving workers learning
    • M.J. Anzanello, and F. Fogliatto Selecting the best clustering variables for grouping mass-customized products involving workers learning Int. J. Prod. Econ. 130 2011 268 276
    • (2011) Int. J. Prod. Econ. , vol.130 , pp. 268-276
    • Anzanello, M.J.1    Fogliatto, F.2
  • 7
    • 80051470469 scopus 로고    scopus 로고
    • Learning curve models and applications: Literature review and research directions
    • M. Anzanello, and F. Fogliatto Learning curve models and applications: literature review and research directions Int. J. Ind. Ergon. 41 2011 573 583
    • (2011) Int. J. Ind. Ergon. , vol.41 , pp. 573-583
    • Anzanello, M.1    Fogliatto, F.2
  • 8
    • 70449521210 scopus 로고    scopus 로고
    • Modeling job rotation in manufacturing system: The study of employees boredom and skill variations
    • N. Azizi, S. Zolfaghari, and M. Liang Modeling job rotation in manufacturing system: the study of employees boredom and skill variations Int. J. Prod. Econ. 123 2010 69 85
    • (2010) Int. J. Prod. Econ. , vol.123 , pp. 69-85
    • Azizi, N.1    Zolfaghari, S.2    Liang, M.3
  • 9
    • 84871716363 scopus 로고    scopus 로고
    • Optimal flow-line conditions with worker variability
    • F. Bentefouet, and D. Nembhard Optimal flow-line conditions with worker variability Int. J. Prod. Econ. 141 2 2013 675 684
    • (2013) Int. J. Prod. Econ. , vol.141 , Issue.2 , pp. 675-684
    • Bentefouet, F.1    Nembhard, D.2
  • 10
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning considerations
    • D. Biskup Single-machine scheduling with learning considerations Eur. J. Oper. Res. 115 1999 173 178
    • (1999) Eur. J. Oper. Res. , vol.115 , pp. 173-178
    • Biskup, D.1
  • 11
    • 84883445551 scopus 로고    scopus 로고
    • Bi-criteria group scheduling in hybrid flowshops
    • M. Bozorgirad, and R. Logendran Bi-criteria group scheduling in hybrid flowshops Int. J. Prod. Econ. 145 2 2013 599 612
    • (2013) Int. J. Prod. Econ. , vol.145 , Issue.2 , pp. 599-612
    • Bozorgirad, M.1    Logendran, R.2
  • 12
    • 0033998529 scopus 로고    scopus 로고
    • Designing safe job rotation schedules using optimization and heuristic search
    • B. Carnahan, M. Redfern, and B. Norman Designing safe job rotation schedules using optimization and heuristic search Ergonomics 43 2000 543 560
    • (2000) Ergonomics , vol.43 , pp. 543-560
    • Carnahan, B.1    Redfern, M.2    Norman, B.3
  • 13
    • 0035546615 scopus 로고    scopus 로고
    • Rotation cycle schedulings for multi-item production systems
    • G. Chan, and Y. Song Rotation cycle schedulings for multi-item production systems Eur. J. Oper. Res. 135 2001 361 372
    • (2001) Eur. J. Oper. Res. , vol.135 , pp. 361-372
    • Chan, G.1    Song, Y.2
  • 14
    • 24144456258 scopus 로고    scopus 로고
    • Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints
    • J. Chen, and T. Wu Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints Omega 34 2006 81 89
    • (2006) Omega , vol.34 , pp. 81-89
    • Chen, J.1    Wu, T.2
  • 15
  • 16
    • 79958031546 scopus 로고    scopus 로고
    • Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
    • R. Driessel, and L. Monch Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times Comp. Ind. Eng. 61 2011 336 345
    • (2011) Comp. Ind. Eng. , vol.61 , pp. 336-345
    • Driessel, R.1    Monch, L.2
  • 17
    • 0032615578 scopus 로고    scopus 로고
    • Implementing task rotation
    • T. Ellis Implementing task rotation Occup. Health Saf. 68 1999 82 84
    • (1999) Occup. Health Saf. , vol.68 , pp. 82-84
    • Ellis, T.1
  • 18
    • 84859908356 scopus 로고    scopus 로고
    • The mass customization decade: An updated review of the literature
    • F. Fogliatto, G. Da Silveira, and D. Borenstein The mass customization decade: an updated review of the literature Int. J. Prod. Econ. 138 2012 14 25
    • (2012) Int. J. Prod. Econ. , vol.138 , pp. 14-25
    • Fogliatto, F.1    Da Silveira, G.2    Borenstein, D.3
  • 20
    • 84855880111 scopus 로고    scopus 로고
    • A learning curve-based method to implement multifunctional work teams in the Brazilian footwear sector
    • L.B Guimaraes, M. de, M.J. Anzanello, and J.S. Renner A learning curve-based method to implement multifunctional work teams in the Brazilian footwear sector Appl. Ergon. 43 2012 541 547
    • (2012) Appl. Ergon. , vol.43 , pp. 541-547
    • Guimaraes, L.B.1    De, M.2    Anzanello, M.J.3    Renner, J.S.4
  • 21
    • 33748423575 scopus 로고    scopus 로고
    • Algorithms for single machine total tardiness scheduling with sequence dependent setups
    • S. Gupta, and J. Smith Algorithms for single machine total tardiness scheduling with sequence dependent setups Eur. J. Oper. Res. 175 2006 722 739
    • (2006) Eur. J. Oper. Res. , vol.175 , pp. 722-739
    • Gupta, S.1    Smith, J.2
  • 22
    • 3342875819 scopus 로고    scopus 로고
    • Learning curves for processes generating defects requiring reworks
    • M Jaber, and A. Guiffrida Learning curves for processes generating defects requiring reworks Eur. J. Oper. Res. 159 3 2004 663 672
    • (2004) Eur. J. Oper. Res. , vol.159 , Issue.3 , pp. 663-672
    • Jaber, M.1    Guiffrida, A.2
  • 23
    • 0035815824 scopus 로고    scopus 로고
    • Economic lot sizing with learning and continuous time discounting: Is it significant?
    • M. Jaber, and M. Bonney Economic lot sizing with learning and continuous time discounting: is it significant? Int. J. Prod. Econ. 71 1-3 2001 135 143
    • (2001) Int. J. Prod. Econ. , vol.71 , Issue.13 , pp. 135-143
    • Jaber, M.1    Bonney, M.2
  • 24
    • 49049117993 scopus 로고    scopus 로고
    • Economic production quantity model for items with imperfect quality subject to learning effects
    • M. Jaber, S. Goyal, and M. Imran Economic production quantity model for items with imperfect quality subject to learning effects Int. J. Prod. Econ. 115 1 2008 143 150
    • (2008) Int. J. Prod. Econ. , vol.115 , Issue.1 , pp. 143-150
    • Jaber, M.1    Goyal, S.2    Imran, M.3
  • 25
    • 74449085921 scopus 로고    scopus 로고
    • Managing yield by lot splitting in a serial production line with learning, rework and scrap
    • M. Jaber, and M. Khan Managing yield by lot splitting in a serial production line with learning, rework and scrap Int. J. Prod. Econ. 124 2010 32 39
    • (2010) Int. J. Prod. Econ. , vol.124 , pp. 32-39
    • Jaber, M.1    Khan, M.2
  • 26
    • 78951483130 scopus 로고    scopus 로고
    • An economic production and remanufacturing model with learning effects
    • M. Jaber, and A. Saadany An economic production and remanufacturing model with learning effects Int. J. Prod. Econ. 131 2011 115 127
    • (2011) Int. J. Prod. Econ. , vol.131 , pp. 115-127
    • Jaber, M.1    Saadany, A.2
  • 27
    • 0000924266 scopus 로고
    • Properties of learning curves under varied distributions of practice
    • M.J. Kientzle Properties of learning curves under varied distributions of practice J. Exp. Psychol. 36 1946 187 211
    • (1946) J. Exp. Psychol. , vol.36 , pp. 187-211
    • Kientzle, M.J.1
  • 28
    • 0025787124 scopus 로고
    • Ergonomic job analysis: A structured approach for identifying risk factors associated with overextension injuries and disorders
    • W. Keyserling, T. Armstrong, and L. Punnett Ergonomic job analysis: a structured approach for identifying risk factors associated with overextension injuries and disorders Appl. Occup. Environ. Hyg. 6 1991 353 363
    • (1991) Appl. Occup. Environ. Hyg. , vol.6 , pp. 353-363
    • Keyserling, W.1    Armstrong, T.2    Punnett, L.3
  • 29
    • 0032862305 scopus 로고    scopus 로고
    • Task rotation as a factor in reducing physical workload at a refuse collecting department
    • P.P.F.M. Kuijer, B. Visser, and C. Kemper Han Task rotation as a factor in reducing physical workload at a refuse collecting department Ergonomics 42 1999 1167 1178
    • (1999) Ergonomics , vol.42 , pp. 1167-1178
    • Kuijer, P.P.F.M.1    Visser, B.2    Kemper Han, C.3
  • 30
    • 0032775820 scopus 로고    scopus 로고
    • Cross sectional study of the relationship between repetitive work and the prevalence of upper limb musculoskeletal disorders
    • W. Latko, T. Armstrong, A. Franzblau, S. Ulin, R. Werner, and J. Albers Cross sectional study of the relationship between repetitive work and the prevalence of upper limb musculoskeletal disorders Am. J. Ind. Med. 36 1999 248 259
    • (1999) Am. J. Ind. Med. , vol.36 , pp. 248-259
    • Latko, W.1    Armstrong, T.2    Franzblau, A.3    Ulin, S.4    Werner, R.5    Albers, J.6
  • 31
    • 84873412542 scopus 로고    scopus 로고
    • Worst case analysis of flow shop scheduling problems with a time-dependent learning effect
    • G. Li, X. Wang, J. Wang, and L. Sun Worst case analysis of flow shop scheduling problems with a time-dependent learning effect Int. J. Prod. Econ. 142 1 2013 98 104
    • (2013) Int. J. Prod. Econ. , vol.142 , Issue.1 , pp. 98-104
    • Li, G.1    Wang, X.2    Wang, J.3    Sun, L.4
  • 32
    • 33846312457 scopus 로고    scopus 로고
    • A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
    • X. Luo, and C. Chu A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness Eur. J. Oper. Res. 180 2007 68 81
    • (2007) Eur. J. Oper. Res. , vol.180 , pp. 68-81
    • Luo, X.1    Chu, C.2
  • 33
    • 0018037554 scopus 로고
    • Learning as accumulation: A reexamination of the learning curve
    • J. Mazur, and R. Hastie Learning as accumulation: a reexamination of the learning curve Psychol. Bull. 85 1978 1256 1274
    • (1978) Psychol. Bull. , vol.85 , pp. 1256-1274
    • Mazur, J.1    Hastie, R.2
  • 34
    • 0036961541 scopus 로고    scopus 로고
    • Heuristics based on partial enumeration for the unrelated parallel processor scheduling problem
    • E. Mokotoff, and J. Jimeno Heuristics based on partial enumeration for the unrelated parallel processor scheduling problem Ann. Oper. Res. 117 2002 133 150
    • (2002) Ann. Oper. Res. , vol.117 , pp. 133-150
    • Mokotoff, E.1    Jimeno, J.2
  • 35
    • 0035427775 scopus 로고    scopus 로고
    • Scheduling problems with learning effect
    • G. Mosheiov Scheduling problems with learning effect Eur. J. Oper. Res. 132 2001 687 693
    • (2001) Eur. J. Oper. Res. , vol.132 , pp. 687-693
    • Mosheiov, G.1
  • 36
    • 0037449223 scopus 로고    scopus 로고
    • Scheduling with general job-dependent learning curves
    • G. Mosheiov, and J. Sidney Scheduling with general job-dependent learning curves Eur. J. Oper. Res. 147 2003 665 670
    • (2003) Eur. J. Oper. Res. , vol.147 , pp. 665-670
    • Mosheiov, G.1    Sidney, J.2
  • 37
    • 77957759174 scopus 로고    scopus 로고
    • A dynamic process-based cost modeling approach to understand learning effects in manufacturing
    • M. Nadeau, A. Kar, R. Roth, and R. Kirchain A dynamic process-based cost modeling approach to understand learning effects in manufacturing Int. J. Prod. Econ. 128 1 2010 223 234
    • (2010) Int. J. Prod. Econ. , vol.128 , Issue.1 , pp. 223-234
    • Nadeau, M.1    Kar, A.2    Roth, R.3    Kirchain, R.4
  • 38
    • 0034244772 scopus 로고    scopus 로고
    • An individual-based description of learning within an organization
    • D. Nembhard, and M. Uzumeri An individual-based description of learning within an organization IEEE Trans. Eng. Manag. 47 2000 370 378
    • (2000) IEEE Trans. Eng. Manag. , vol.47 , pp. 370-378
    • Nembhard, D.1    Uzumeri, M.2
  • 39
    • 37849188743 scopus 로고    scopus 로고
    • Using the learning curve to maximize IT productivity: A decision analysis model for timing software upgrades
    • O. Ngwenyama, A. Guergachi, and T. McLaren Using the learning curve to maximize IT productivity: a decision analysis model for timing software upgrades Int. J. Prod. Econ. 105 2 2007 524 535
    • (2007) Int. J. Prod. Econ. , vol.105 , Issue.2 , pp. 524-535
    • Ngwenyama, O.1    Guergachi, A.2    McLaren, T.3
  • 40
    • 84901698945 scopus 로고    scopus 로고
    • NIOSH (National Institute for Occupational Safety and Health) NIOSH Publication No. 2004-146. National Institute for Occupational Safety and Health, Washington, DC
    • NIOSH (National Institute for Occupational Safety and Health), 2004. Workers health chartbook. NIOSH Publication No. 2004-146. National Institute for Occupational Safety and Health, Washington, DC. Available from: http://www.cdc.gov/niosh/docs/2004-146/ch2/ch2-6.asp.htm.
    • (2004) Workers Health Chartbook
  • 42
    • 41449109607 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with setup times and ready times
    • M. Pfund, J.W. Fowler, A. Gadkari, and Y. Chen Scheduling jobs on parallel machines with setup times and ready times Comp. Ind. Eng. 54 2008 764 782
    • (2008) Comp. Ind. Eng. , vol.54 , pp. 764-782
    • Pfund, M.1    Fowler, J.W.2    Gadkari, A.3    Chen, Y.4
  • 45
    • 34347362992 scopus 로고    scopus 로고
    • Learning curve analysis of a patient lift-assist device
    • S. Reid, and G. Mirka Learning curve analysis of a patient lift-assist device Appl. Ergon. 38 6 2007 765 771
    • (2007) Appl. Ergon. , vol.38 , Issue.6 , pp. 765-771
    • Reid, S.1    Mirka, G.2
  • 46
    • 0023125906 scopus 로고
    • Occupational factors and carpal tunnel syndrome
    • B. Silverstein, L. Fine, and T. Armstrong Occupational factors and carpal tunnel syndrome Am. J. Ind. Med. 11 1987 343 358
    • (1987) Am. J. Ind. Med. , vol.11 , pp. 343-358
    • Silverstein, B.1    Fine, L.2    Armstrong, T.3
  • 47
    • 84901711193 scopus 로고    scopus 로고
    • Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs
    • in press (available online 17 October 2013)
    • Teng, J.; Lou, K.; Wang, Lu, 2014. Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs. Int. J. Prod. Econ, 10.1016/j.ijpe.2013.10.012, in press (available online 17 October 2013).
    • (2014) Int. J. Prod. Econ
    • Teng, J.1    Lou, K.2    Wang, L.3
  • 48
    • 0003654970 scopus 로고
    • The Learning Curve Deskbook: A Reference Guide to Theory
    • Quorum Books New York
    • C. Teplitz The Learning Curve Deskbook: A Reference Guide to Theory Calculations and Applications 1991 Quorum Books New York
    • (1991) Calculations and Applications
    • Teplitz, C.1
  • 49
    • 33846429255 scopus 로고    scopus 로고
    • Improving the performance of the ATC dispatch rule by using workload data to determine the lookahead parameter value
    • J. Valente Improving the performance of the ATC dispatch rule by using workload data to determine the lookahead parameter value Int. J. Prod. Econ. 106 2 2007 563 573
    • (2007) Int. J. Prod. Econ. , vol.106 , Issue.2 , pp. 563-573
    • Valente, J.1
  • 51
    • 84901721072 scopus 로고    scopus 로고
    • A model of mass customization for engineering production system development in textile and apparel industries in Thailand
    • K. Watcharapanyawong, S. Sirisoponsilp, and P. Sophatsathit A model of mass customization for engineering production system development in textile and apparel industries in Thailand Syst. Eng. Procedia 2 2011 382 397
    • (2011) Syst. Eng. Procedia , vol.2 , pp. 382-397
    • Watcharapanyawong, K.1    Sirisoponsilp, S.2    Sophatsathit, P.3
  • 52
    • 0035906316 scopus 로고    scopus 로고
    • Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
    • M. Weng, J. Lu, and H. Ren Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective Int. J. Prod. Econ. 70 3 2001 215 226
    • (2001) Int. J. Prod. Econ. , vol.70 , Issue.3 , pp. 215-226
    • Weng, M.1    Lu, J.2    Ren, H.3
  • 53
    • 0001250106 scopus 로고
    • Factors affecting the cost of airplanes
    • T. Wrigh Factors affecting the cost of airplanes J. Aeronaut. Sci. 3 2 1936 122 128
    • (1936) J. Aeronaut. Sci. , vol.3 , Issue.2 , pp. 122-128
    • Wrigh, T.1
  • 54
    • 84858070782 scopus 로고    scopus 로고
    • Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study
    • Y. Xi, and J. Jang Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: an experimental study Int. J. Prod. Econ. 137 2012 1 10
    • (2012) Int. J. Prod. Econ. , vol.137 , pp. 1-10
    • Xi, Y.1    Jang, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.