-
2
-
-
33645112524
-
A study on supply-hub mode under the supply chain environment
-
Wang Y., Ma S., A study on supply-hub mode under the supply chain environment Management Review 2005 17 2 33 36
-
(2005)
Management Review
, vol.17
, Issue.2
, pp. 33-36
-
-
Wang, Y.1
Ma, S.2
-
3
-
-
28544452132
-
Setting operating policies for supply hubs
-
2-s2.0-28544452132 10.1016/j.ijpe.2004.11.008
-
Shah J., Goh M., Setting operating policies for supply hubs. International Journal of Production Economics 2006 100 2 239 252 2-s2.0-28544452132 10.1016/j.ijpe.2004.11.008
-
(2006)
International Journal of Production Economics
, vol.100
, Issue.2
, pp. 239-252
-
-
Shah, J.1
Goh, M.2
-
4
-
-
38249010317
-
The economic lot and delivery scheduling problem: The single item case
-
2-s2.0-38249010317
-
Hahm J., Yano C. A., The economic lot and delivery scheduling problem: the single item case. International Journal of Production Economics 1992 28 2 235 252 2-s2.0-38249010317
-
(1992)
International Journal of Production Economics
, vol.28
, Issue.2
, pp. 235-252
-
-
Hahm, J.1
Yano, C.A.2
-
5
-
-
0029288359
-
Economic lot and delivery scheduling problem: The common cycle case
-
2-s2.0-0029288359
-
Hahm J., Yano C. A., Economic lot and delivery scheduling problem: the common cycle case. IIE Transactions 1995 27 2 113 125 2-s2.0-0029288359
-
(1995)
IIE Transactions
, vol.27
, Issue.2
, pp. 113-125
-
-
Hahm, J.1
Yano, C.A.2
-
6
-
-
0029293670
-
Economic lot and delivery scheduling problem: Models for nested schedules
-
2-s2.0-0029293670
-
Hahm J., Yano C. A., Economic lot and delivery scheduling problem: models for nested schedules. IIE Transactions 1995 27 2 126 139 2-s2.0-0029293670
-
(1995)
IIE Transactions
, vol.27
, Issue.2
, pp. 126-139
-
-
Hahm, J.1
Yano, C.A.2
-
7
-
-
1842455787
-
The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate
-
2-s2.0-1842455787
-
Khouja M., The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate. IIE Transactions 2000 32 8 715 725 2-s2.0-1842455787
-
(2000)
IIE Transactions
, vol.32
, Issue.8
, pp. 715-725
-
-
Khouja, M.1
-
8
-
-
33748542937
-
A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case
-
2-s2.0-33748542937 10.1016/j.ejor.2005.06.037
-
Clausen J., Ju S., A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case. European Journal of Operational Research 2006 175 2 1141 1150 2-s2.0-33748542937 10.1016/j.ejor.2005.06.037
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.2
, pp. 1141-1150
-
-
Clausen, J.1
Ju, S.2
-
9
-
-
0036721778
-
An evolutionary algorithm for optimizing material flow in supply chains
-
2-s2.0-0036721778 10.1016/S0360-8352(02)00055-4
-
Vergara F. E., Khouja M., Michalewicz Z., An evolutionary algorithm for optimizing material flow in supply chains. Computers and Industrial Engineering 2002 43 3 407 421 2-s2.0-0036721778 10.1016/S0360-8352(02)00055-4
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.3
, pp. 407-421
-
-
Vergara, F.E.1
Khouja, M.2
Michalewicz, Z.3
-
10
-
-
0041857762
-
Synchronization in supply chains: Implications for design and management
-
2-s2.0-0041857762 10.1057/palgrave.jors.2601606
-
Khouja M., Synchronization in supply chains: implications for design and management. Journal of the Operational Research Society 2003 54 9 984 994 2-s2.0-0041857762 10.1057/palgrave.jors.2601606
-
(2003)
Journal of the Operational Research Society
, vol.54
, Issue.9
, pp. 984-994
-
-
Khouja, M.1
-
12
-
-
33646116556
-
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains
-
2-s2.0-33646116556 10.1016/j.ejor.2004.11.012
-
Torabi S. A., Fatemi Ghomi S. M. T., Karimi B., A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. European Journal of Operational Research 2006 173 1 173 189 2-s2.0-33646116556 10.1016/j.ejor.2004.11.012
-
(2006)
European Journal of Operational Research
, vol.173
, Issue.1
, pp. 173-189
-
-
Torabi, S.A.1
Fatemi Ghomi, S.M.T.2
Karimi, B.3
-
13
-
-
33750706574
-
Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete
-
2-s2.0-33750706574 10.1016/j.ejor.2005.12.019
-
Naso D., Surico M., Turchiano B., Kaymak U., Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete. European Journal of Operational Research 2007 177 3 2069 2099 2-s2.0-33750706574 10.1016/j.ejor.2005.12.019
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2069-2099
-
-
Naso, D.1
Surico, M.2
Turchiano, B.3
Kaymak, U.4
-
14
-
-
78651501034
-
Collaborative decision of distribution lot-sizing among suppliers based on supply-hub
-
Ma S., Gong F., Collaborative decision of distribution lot-sizing among suppliers based on supply-hub Industrial Engineering and Management 2009 14 2 1 9
-
(2009)
Industrial Engineering and Management
, vol.14
, Issue.2
, pp. 1-9
-
-
Ma, S.1
Gong, F.2
-
15
-
-
48649104903
-
An integral constrained generalized hub-and-spoke network design problem
-
2-s2.0-48649104903 10.1016/j.tre.2008.02.001
-
Lin C., Chen S., An integral constrained generalized hub-and-spoke network design problem. Transportation Research E 2008 44 6 986 1003 2-s2.0-48649104903 10.1016/j.tre.2008.02.001
-
(2008)
Transportation Research e
, vol.44
, Issue.6
, pp. 986-1003
-
-
Lin, C.1
Chen, S.2
-
16
-
-
70449529546
-
The integrated secondary route network design model in the hierarchical hub-and-spoke network for dual express services
-
2-s2.0-70449529546 10.1016/j.ijpe.2009.05.030
-
Lin C., The integrated secondary route network design model in the hierarchical hub-and-spoke network for dual express services. International Journal of Production Economics 2010 123 1 20 30 2-s2.0-70449529546 10.1016/j.ijpe.2009.05.030
-
(2010)
International Journal of Production Economics
, vol.123
, Issue.1
, pp. 20-30
-
-
Lin, C.1
-
17
-
-
77957277145
-
Deriving industrial logistics hub reference models for manufacturing based economies
-
Charles V. T., Gilbert Y. P. L., Amy J. C. T., Liu C. S., Lee W. T., Deriving industrial logistics hub reference models for manufacturing based economies. Expert System with Applications 2011 38 1223 1232
-
(2011)
Expert System with Applications
, vol.38
, pp. 1223-1232
-
-
Charles, V.T.1
Gilbert, Y.P.L.2
Amy, J.C.T.3
Liu, C.S.4
Lee, W.T.5
-
18
-
-
69249225544
-
Supply chain design model based on BOM-Supply Hub
-
2-s2.0-69249225544
-
Li J., Ma S., Guo P., Liu C., Supply chain design model based on BOM-Supply Hub Computer Integrated Manufacturing Systems 2009 15 7 1299 1306 2-s2.0-69249225544
-
(2009)
Computer Integrated Manufacturing Systems
, vol.15
, Issue.7
, pp. 1299-1306
-
-
Li, J.1
Ma, S.2
Guo, P.3
Liu, C.4
-
19
-
-
84874499828
-
A study on the multi-source replenishment model and coordination lot size decision-making based on Supply-Hub
-
Gui H., Ma S., A study on the multi-source replenishment model and coordination lot size decision-making based on Supply-Hub Chinese Journal of Management Science 2010 18 1 78 82
-
(2010)
Chinese Journal of Management Science
, vol.18
, Issue.1
, pp. 78-82
-
-
Gui, H.1
Ma, S.2
-
20
-
-
80855135541
-
Research reviews and future prospective of collaborative operation in supply logistics based on Supply-Hub
-
2-s2.0-80855135541 10.3901/JME.2011.20.023
-
Li G., Ma S., Gong F., Wang Z., Research reviews and future prospective of collaborative operation in supply logistics based on Supply-Hub Journal of Mechanical Engineering 2011 47 20 23 33 2-s2.0-80855135541 10.3901/JME.2011.20. 023
-
(2011)
Journal of Mechanical Engineering
, vol.47
, Issue.20
, pp. 23-33
-
-
Li, G.1
Ma, S.2
Gong, F.3
Wang, Z.4
|