-
1
-
-
33144471089
-
Iterative linear approach for nonlinear nonhomogenous stochastic pavement management models
-
10 .1061/(ASCE)0733-947X(2006)132:3(244)
-
Abaza, K. A. (2006). "Iterative linear approach for nonlinear nonhomogenous stochastic pavement management models." J. Transp. Eng., 10 .1061/(ASCE)0733-947X(2006)132:3(244), 244-256.
-
(2006)
J. Transp. Eng.
, pp. 244-256
-
-
Abaza, K.A.1
-
2
-
-
1642480230
-
Integrated pavement management system with a Markovian prediction model
-
10.1061/(ASCE)0733-947X(2004)130:1(24)
-
Abaza, K. A., Ashur, S. A., and Al-Khatib, I. (2004). "Integrated pavement management system with a Markovian prediction model." J. Transp. Eng., 10.1061/(ASCE)0733-947X(2004)130:1(24), 24-33.
-
(2004)
J. Transp. Eng.
, pp. 24-33
-
-
Abaza, K.A.1
Ashur, S.A.2
Al-Khatib, I.3
-
3
-
-
38349148946
-
Dynamic probabilistic approach for long-term pavement restoration program with added user cost
-
Transportation Research Board, Washington, DC
-
Abaza, K. A., and Murad, M. M. (2007). "Dynamic probabilistic approach for long-term pavement restoration program with added user cost." Transportation Research Record 1990, Transportation Research Board, Washington, DC, 48-56.
-
(2007)
Transportation Research Record 1990
, pp. 48-56
-
-
Abaza, K.A.1
Murad, M.M.2
-
4
-
-
76549098095
-
Performance-based contracting for roadway maintenance operations
-
M.Sc. thesis, Purdue Univ., West Lafayette, IN.
-
Anastasopoulos, P. C. (2007). "Performance-based contracting for roadway maintenance operations." M.Sc. thesis, Purdue Univ., West Lafayette, IN.
-
(2007)
-
-
Anastasopoulos, P.C.1
-
5
-
-
84855974075
-
Infrastructure asset management: A case study on pavement rehabilitation
-
Ph.D. dissertation, Purdue Univ., West Lafayette, IN.
-
Anastasopoulos, P. C. (2009). "Infrastructure asset management: A case study on pavement rehabilitation." Ph.D. dissertation, Purdue Univ., West Lafayette, IN.
-
(2009)
-
-
Anastasopoulos, P.C.1
-
6
-
-
76549097923
-
Contracting in highway maintenance and rehabilitation: Are spatial effects important?"
-
Anastasopoulos, P. C., Florax, R. J. G. M., Labi, S., and Karlaftis, M. G. (2010a). "Contracting in highway maintenance and rehabilitation: Are spatial effects important?" Transp. Res. A, 44, 136-146.
-
(2010)
Transp. Res. A
, vol.44
, pp. 136-146
-
-
Anastasopoulos, P.C.1
Florax, R.J.G.M.2
Labi, S.3
Karlaftis, M.G.4
-
7
-
-
84455211117
-
Comparative analysis of public-private partnerships in roadway preservation
-
Transportation Research Record 2235, Transportation Research Board, Washington, DC
-
Anastasopoulos, P. C., Islam, M., Volovski, M., Powell, J., and Labi, S. (2011a). "Comparative analysis of public-private partnerships in roadway preservation." Transportation Research Record 2235, Transportation Research Board, Washington, DC, 9-19.
-
(2011)
, pp. 9-19
-
-
Anastasopoulos, P.C.1
Islam, M.2
Volovski, M.3
Powell, J.4
Labi, S.5
-
8
-
-
84855946849
-
Exploratory state-level empirical assessment of pavement performance
-
10.1061/(ASCE)IS.1943-555X .0000057
-
Anastasopoulos, P. C., Labi, S., Karlaftis, M. G., and Mannering, F. L. (2011b). "Exploratory state-level empirical assessment of pavement performance." J. Infrastruct. Syst., 10.1061/(ASCE)IS.1943-555X .0000057, 200-215.
-
(2011)
J. Infrastruct. Syst.
, pp. 200-215
-
-
Anastasopoulos, P.C.1
Labi, S.2
Karlaftis, M.G.3
Mannering, F.L.4
-
9
-
-
78449246212
-
Influence of highway project characteristics on contract type selection: Empirical assessment
-
10.1061/(ASCE)IS.1943-555X.0000035
-
Anastasopoulos, P. C., Labi, S., McCullouch, B., Karlaftis, M. G., and Moavenzadeh, F. (2010b). "Influence of highway project characteristics on contract type selection: Empirical assessment." J. Infrastruct. Syst., 10.1061/(ASCE)IS.1943-555X.0000035, 323-333.
-
(2010)
J. Infrastruct. Syst.
, pp. 323-333
-
-
Anastasopoulos, P.C.1
Labi, S.2
McCullouch, B.3
Karlaftis, M.G.4
Moavenzadeh, F.5
-
10
-
-
76749103889
-
Analyzing duration and prolongation of performance-based contracts using hazard-based duration and zero-inflated random parameters Poisson models
-
Transportation Research Record 2136, Transportation Research Board, Washington, DC
-
Anastasopoulos, P. C., Labi, S., and McCullouch, B. G. (2009). "Analyzing duration and prolongation of performance-based contracts using hazard-based duration and zero-inflated random parameters Poisson models." Transportation Research Record 2136, Transportation Research Board, Washington, DC, 11-19.
-
(2009)
, pp. 11-19
-
-
Anastasopoulos, P.C.1
Labi, S.2
McCullouch, B.G.3
-
11
-
-
84876716826
-
A random parameters seemingly unrelated equations approach to the post-rehabilitation performance of pavements
-
10.1061/(ASCE)IS.1943-555X.0000096
-
Anastasopoulos, P. C., Mannering, F. L., and Haddock, J. E. (2012). "A random parameters seemingly unrelated equations approach to the post-rehabilitation performance of pavements." J. Infrastruct. Syst., 10.1061/(ASCE)IS.1943-555X.0000096, 176-182.
-
(2012)
J. Infrastruct. Syst.
, pp. 176-182
-
-
Anastasopoulos, P.C.1
Mannering, F.L.2
Haddock, J.E.3
-
12
-
-
78449257652
-
Cost savings analysis of performance-based contracts for highway maintenance operations
-
10 .1061/(ASCE)IS.1943-555X.0000012
-
Anastasopoulos, P. C., McCullouch, B. G., Gkritza, K., Mannering, F. L., and Sinha, K. C. (2010c). "Cost savings analysis of performance-based contracts for highway maintenance operations." J. Infrastruct. Syst., 10 .1061/(ASCE)IS.1943-555X.0000012, 251-263.
-
(2010)
J. Infrastruct. Syst.
, pp. 251-263
-
-
Anastasopoulos, P.C.1
McCullouch, B.G.2
Gkritza, K.3
Mannering, F.L.4
Sinha, K.C.5
-
13
-
-
33747212711
-
Repeated measurement data analysis in pavement deterioration modeling
-
10.1061/(ASCE)1076-0342(2006)12:3(163)
-
Archilla, A. R. (2006). "Repeated measurement data analysis in pavement deterioration modeling." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(2006)12:3(163), 163-173.
-
(2006)
J. Infrastruct. Syst.
, pp. 163-173
-
-
Archilla, A.R.1
-
14
-
-
0033738505
-
Development of pavement rutting model from experimental data
-
10.1061/ (ASCE)0733-947X(2000)126:4(291)
-
Archilla, A. R., and Madanat, S. M. (2000). "Development of pavement rutting model from experimental data." J. Transp. Eng., 10.1061/ (ASCE)0733-947X(2000)126:4(291), 291-299.
-
(2000)
J. Transp. Eng.
, pp. 291-299
-
-
Archilla, A.R.1
Madanat, S.M.2
-
15
-
-
0035450608
-
Estimation of rutting models by combining data from different sources
-
10.1061/ (ASCE)0733-947X(2001)127:5(379)
-
Archilla, A. R., and Madanat, S. M. (2001). "Estimation of rutting models by combining data from different sources." J. Transp. Eng., 10.1061/ (ASCE)0733-947X(2001)127:5(379), 379-389.
-
(2001)
J. Transp. Eng.
, pp. 379-389
-
-
Archilla, A.R.1
Madanat, S.M.2
-
16
-
-
0027597163
-
An approach for predicting latent infrastructure facility deterioration
-
Ben-Akiva, M., and Ramaswamy, R. (1993). "An approach for predicting latent infrastructure facility deterioration." Transp. Sci., 27(2), 174-193.
-
(1993)
Transp. Sci.
, vol.27
, Issue.2
, pp. 174-193
-
-
Ben-Akiva, M.1
Ramaswamy, R.2
-
17
-
-
84894072310
-
-
LPSolve IDE v5.5.2.0. (June 2011).
-
Berkelaar, M., Dirks, J., Eikland, K., and Notebaert, P. (2011). LPSolve IDE v5.5.2.0. http://lpsolve.sourceforge.net/5.5/IDE.htm (June 2011).
-
(2011)
-
-
Berkelaar, M.1
Dirks, J.2
Eikland, K.3
Notebaert, P.4
-
18
-
-
0023545630
-
Pavement performance prediction model using the Markov process
-
Transportation Research Record 1123, Transportation Research Board, Washington, DC
-
Butt, A. A., Shahin, M. Y., Feighan, K. J., and Carpenter, S. H. (1987). "Pavement performance prediction model using the Markov process." Transportation Research Record 1123, Transportation Research Board, Washington, DC, 12-19.
-
(1987)
, pp. 12-19
-
-
Butt, A.A.1
Shahin, M.Y.2
Feighan, K.J.3
Carpenter, S.H.4
-
19
-
-
0023421382
-
Optimal maintenance decisions for pavement management
-
10.1061/(ASCE)0733-947X(1987)113:5(554)
-
Carnahan, J. V., Davis, W. J., Shahin, M. Y., Kean, P. L., and Wu, M. I. (1987). "Optimal maintenance decisions for pavement management." J. Transp. Eng., 10.1061/(ASCE)0733-947X(1987)113:5(554), 554-572.
-
(1987)
J. Transp. Eng.
, pp. 554-572
-
-
Carnahan, J.V.1
Davis, W.J.2
Shahin, M.Y.3
Kean, P.L.4
Wu, M.I.5
-
20
-
-
3843113479
-
North Carolina's experience in development of pavement performance prediction and modeling
-
Transportation Research Record 1592, Transportation Research Board, Washington, DC
-
Chan, P. K., Oppermann, M. C., and Wu, S. (1997). "North Carolina's experience in development of pavement performance prediction and modeling." Transportation Research Record 1592, Transportation Research Board, Washington, DC, 80-88.
-
(1997)
, pp. 80-88
-
-
Chan, P.K.1
Oppermann, M.C.2
Wu, S.3
-
21
-
-
0035372625
-
Constraint handling methods in pavement maintenance programming
-
Chan, W. T., Fwa, T. F., and Hoque, K. Z. (2001). "Constraint handling methods in pavement maintenance programming." Transp. Res. C, 9(3), 175-190.
-
(2001)
Transp. Res. C
, vol.9
, Issue.3
, pp. 175-190
-
-
Chan, W.T.1
Fwa, T.F.2
Hoque, K.Z.3
-
22
-
-
38349123279
-
Fuzzy logic pavement maintenance and rehabilitation triggering approach for probabilistic life-cycle cost analysis
-
Transportation Research Board, Washington, DC
-
Chen, C., and Flintsch, G. W. (2007). "Fuzzy logic pavement maintenance and rehabilitation triggering approach for probabilistic life-cycle cost analysis." Transportation Research Record 1990, Transportation Research Board, Washington, DC, 80-91.
-
(2007)
Transportation Research Record 1990
, pp. 80-91
-
-
Chen, C.1
Flintsch, G.W.2
-
23
-
-
33745203071
-
A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach
-
Chootinana, P., Chena, A., Horrocksb, M. R., and Bollingc, D. (2006). "A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach." Transp. Res. A, 40(9), 725-743.
-
(2006)
Transp. Res. A
, vol.40
, Issue.9
, pp. 725-743
-
-
Chootinana, P.1
Chena, A.2
Horrocksb, M.R.3
Bollingc, D.4
-
24
-
-
0006809623
-
Linear programming model for pavement management
-
Transportation Research Record 1200, Transportation Research Board, Washington, DC
-
Davis, C. F., and Van Dine, C. P. (1988). "Linear programming model for pavement management." Transportation Research Record 1200, Transportation Research Board, Washington, DC, 71-75.
-
(1988)
, pp. 71-75
-
-
Davis, C.F.1
Van Dine, C.P.2
-
25
-
-
67349232030
-
Maintenance optimization for transportation systems with demand responsiveness
-
Durango-Cohen, P. L., and Sarutipand, P. (2009). "Maintenance optimization for transportation systems with demand responsiveness." Transp. Res. C, 17(4), 337-348.
-
(2009)
Transp. Res. C
, vol.17
, Issue.4
, pp. 337-348
-
-
Durango-Cohen, P.L.1
Sarutipand, P.2
-
26
-
-
0036848688
-
Probabilistic segment-linked pavement management optimization model
-
10.1061/(ASCE)0733-947X(2002)128:6(568)
-
Ferreira, A., Antunes, A., and Picado-Santos, L. (2002). "Probabilistic segment-linked pavement management optimization model." J. Transp. Eng., 10.1061/(ASCE)0733-947X(2002)128:6(568), 568-577.
-
(2002)
J. Transp. Eng.
, pp. 568-577
-
-
Ferreira, A.1
Antunes, A.2
Picado-Santos, L.3
-
27
-
-
0027589526
-
Priority rating of highway needs by neural networks
-
10.1061/(ASCE)0733-947X(1993) 119:3(419)
-
Fwa, T. F., and Chan, W. T. (1993). "Priority rating of highway needs by neural networks." J. Transp. Eng., 10.1061/(ASCE)0733-947X(1993) 119:3(419), 419-432.
-
(1993)
J. Transp. Eng.
, pp. 419-432
-
-
Fwa, T.F.1
Chan, W.T.2
-
28
-
-
0000622665
-
Genetic-algorithm programming of road maintenance and rehabilitation
-
10.1061/(ASCE)0733-947X(1996)122:3(246)
-
Fwa, T. F., Chan, W. T., and Tan, C. Y. (1996). "Genetic-algorithm programming of road maintenance and rehabilitation." J. Transp. Eng., 10.1061/(ASCE)0733-947X(1996)122:3(246), 246-253.
-
(1996)
J. Transp. Eng.
, pp. 246-253
-
-
Fwa, T.F.1
Chan, W.T.2
Tan, C.Y.3
-
29
-
-
0002539999
-
A statewide pavement management system
-
Golabi, K., Kulkarni, R. B., andWay, G. B. (1982). "A statewide pavement management system." Interfaces, 12(6), 5-21.
-
(1982)
Interfaces
, vol.12
, Issue.6
, pp. 5-21
-
-
Golabi, K.1
Kulkarni, R.B.2
Way, G.B.3
-
30
-
-
0004081766
-
-
Krieger Publishing, Malabar, FL.
-
Haas, R., Hudson, R. W., and Zaniewski, J. P. (1994). Modern pavement management, Krieger Publishing, Malabar, FL.
-
(1994)
Modern pavement management
-
-
Haas, R.1
Hudson, R.W.2
Zaniewski, J.P.3
-
31
-
-
33646713386
-
Estimation of pavement performance deterioration using Bayesian approach
-
10.1061/ (ASCE)1076-0342(2006)12:2(77)
-
Hong, F., and Prozzi, J. A. (2006). "Estimation of pavement performance deterioration using Bayesian approach." J. Infrastruct. Syst., 10.1061/ (ASCE)1076-0342(2006)12:2(77), 77-86.
-
(2006)
J. Infrastruct. Syst.
, pp. 77-86
-
-
Hong, F.1
Prozzi, J.A.2
-
32
-
-
79951775181
-
Statistical methods versus neural networks in transportation research: Differences, similarities and some insights
-
Karlaftis, M. G., and Vlahogianni, E. I. (2011). "Statistical methods versus neural networks in transportation research: Differences, similarities and some insights." Transp. Res. C, 19(3), 387-399.
-
(2011)
Transp. Res. C
, vol.19
, Issue.3
, pp. 387-399
-
-
Karlaftis, M.G.1
Vlahogianni, E.I.2
-
33
-
-
33646808628
-
Model uncertainty and the management of a system of infrastructure facilities
-
Kuhn, K. D., and Madanat, S. M. (2005). "Model uncertainty and the management of a system of infrastructure facilities." Transp. Res. C, 13(5-6), 391-404.
-
(2005)
Transp. Res. C
, vol.13
, Issue.5-6
, pp. 391-404
-
-
Kuhn, K.D.1
Madanat, S.M.2
-
34
-
-
0032207127
-
Integer programming of maintenance and rehabilitation treatments for pavement networks
-
Transportation Research Board, Washington, DC
-
Li, N., Haas, R., and Huot, M. (1988). "Integer programming of maintenance and rehabilitation treatments for pavement networks." Transportation Research Record 1629, Transportation Research Board, Washington, DC, 242-248.
-
(1988)
Transportation Research Record 1629
, pp. 242-248
-
-
Li, N.1
Haas, R.2
Huot, M.3
-
35
-
-
0001907920
-
Optimal infrastructure management decisions under uncertainty
-
Madanat, S. M. (1993). "Optimal infrastructure management decisions under uncertainty." Transp. Res. C, 1(1), 77-88.
-
(1993)
Transp. Res. C
, vol.1
, Issue.1
, pp. 77-88
-
-
Madanat, S.M.1
-
36
-
-
0029373816
-
Estimation of infrastructure distress initiation and progression models
-
10.1061/(ASCE)1076-0342(1995)1:3(146)
-
Madanat, S. M., Bulusu, S., and Mahmoud, A. (1995). "Estimation of infrastructure distress initiation and progression models." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(1995)1:3(146), 146-150.
-
(1995)
J. Infrastruct. Syst.
, pp. 146-150
-
-
Madanat, S.M.1
Bulusu, S.2
Mahmoud, A.3
-
37
-
-
0031102980
-
Probabilistic infrastructure deterioration models with panel data
-
10.1061/(ASCE)1076-0342(1997)3:1(4)
-
Madanat, S. M., Karlaftis, M. G., and McCarthy, P. S. (1997). "Probabilistic infrastructure deterioration models with panel data." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(1997)3:1(4), 4-9.
-
(1997)
J. Infrastruct. Syst.
, pp. 4-9
-
-
Madanat, S.M.1
Karlaftis, M.G.2
McCarthy, P.S.3
-
38
-
-
0002954566
-
Optimal rehabilitation times for concrete bridge decks
-
Transportation Research Record 1392, Transportation Research Board, Washington, DC
-
Markow, M. J., Madanat, S. M., and Gurenich, D. I. (1994). "Optimal rehabilitation times for concrete bridge decks." Transportation Research Record 1392, Transportation Research Board, Washington, DC, 79-89.
-
(1994)
, pp. 79-89
-
-
Markow, M.J.1
Madanat, S.M.2
Gurenich, D.I.3
-
39
-
-
0030231329
-
Optimization modeling for enhanced network-level pavement management system
-
Transportation Research Record 1524, Transportation Research Board, Washington, DC
-
Mbwana, J. R., and Turnquist, M. A. (1996). "Optimization modeling for enhanced network-level pavement management system." Transportation Research Record 1524, Transportation Research Board, Washington, DC, 76-85.
-
(1996)
, pp. 76-85
-
-
Mbwana, J.R.1
Turnquist, M.A.2
-
40
-
-
50149100915
-
Stochastic duration modeling of pavement overlay crack initiation
-
10.1061/ (ASCE)1076-0342(2008)14:3(185)
-
Nakat, Z. S., and Madanat, S. M. (2008). "Stochastic duration modeling of pavement overlay crack initiation." J. Infrastruct. Syst., 10.1061/ (ASCE)1076-0342(2008)14:3(185), 185-192.
-
(2008)
J. Infrastruct. Syst.
, pp. 185-192
-
-
Nakat, Z.S.1
Madanat, S.M.2
-
41
-
-
80052777060
-
The price of uncertainty in pavement infrastructure management planning: An integer programming approach
-
Ng, M., Zhang, Z., and Waller, S. T. (2011). "The price of uncertainty in pavement infrastructure management planning: An integer programming approach." Transp. Res. C, 19(6), 1326-1338.
-
(2011)
Transp. Res. C
, vol.19
, Issue.6
, pp. 1326-1338
-
-
Ng, M.1
Zhang, Z.2
Waller, S.T.3
-
42
-
-
84945680351
-
Performance-based contracts-International experiences
-
Finnish Road Administration. Presentation at the TRB Workshop on "Performance-based Contracting", Transportation Research Board (TRB), Washington, DC.
-
Pakkala, P. (2005). "Performance-based contracts-International experiences." Finnish Road Administration. Presentation at the TRB Workshop on "Performance-based Contracting", Transportation Research Board (TRB), Washington, DC.
-
(2005)
-
-
Pakkala, P.1
-
43
-
-
0023034306
-
On predicting pavement surface distress with empirical models of failure times
-
Transportation Research Record 1095, Transportation Research Board, Washington, DC
-
Paterson, W. D. O., and Chesher, A. D. (1986). "On predicting pavement surface distress with empirical models of failure times." Transportation Research Record 1095, Transportation Research Board, Washington, DC, 45-56.
-
(1986)
, pp. 45-56
-
-
Paterson, W.D.O.1
Chesher, A.D.2
-
44
-
-
84894044257
-
International trends in procurement models for highway maintenance
-
Final Rep. 2002, Opus International Consultants, New Zealand (Jun. 2013).
-
Porter, T. (2006). "International trends in procurement models for highway maintenance." Final Rep. 2002, Opus International Consultants, New Zealand http://www.opus.co.nz (Jun. 2013).
-
(2006)
-
-
Porter, T.1
-
45
-
-
40549115339
-
Transportation infrastructure performance modeling through seemingly unrelated regression systems
-
10.1061/(ASCE)1076-0342(2008)14:2(129)
-
Prozzi, J. A., and Hong, F. (2008). "Transportation infrastructure performance modeling through seemingly unrelated regression systems." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(2008)14:2(129), 129-137.
-
(2008)
J. Infrastruct. Syst.
, pp. 129-137
-
-
Prozzi, J.A.1
Hong, F.2
-
46
-
-
1942506422
-
Development of pavement performance models by combining experimental and field data
-
10.1061/(ASCE)1076-0342(2004)10:1(9)
-
Prozzi, J. A., and Madanat, S. M. (2004). "Development of pavement performance models by combining experimental and field data." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(2004)10:1(9), 9-22.
-
(2004)
J. Infrastruct. Syst.
, pp. 9-22
-
-
Prozzi, J.A.1
Madanat, S.M.2
-
47
-
-
38349100699
-
Development of pavement performance models to account for frost effects and their application to mechanistic-empirical design guide calibration
-
Transportation Research Board, Washington, DC
-
Puccinelli, J., and Jackson, N. C. (2007). "Development of pavement performance models to account for frost effects and their application to mechanistic-empirical design guide calibration." Transportation Research Record 1990, Transportation Research Board, Washington, DC, 95-101.
-
(2007)
Transportation Research Record 1990
, pp. 95-101
-
-
Puccinelli, J.1
Jackson, N.C.2
-
48
-
-
0012541221
-
COIN/BCP user's manual
-
(June 2011).
-
Ralphs, T. K., and Ladányi, L. (2001). "COIN/BCP user's manual." http:// coral.ie.lehigh.edu/~ted/files/papers/BCP-Manual.pdf (June 2011).
-
(2001)
-
-
Ralphs, T.K.1
Ladányi, L.2
-
49
-
-
84894081077
-
DC Streets performance-based asset preservation experiment: Current quantitative results and suggestions for future contracts
-
Presented at the 85th Transportation Research Board Annual Meeting, Transportation Research Board (TRB), Washington DC.
-
Robinson, D. M., Raynault, E., Frazer, W., Lakew, M., Rennie, S., and Sheldahl, E. A. (2006). "DC Streets performance-based asset preservation experiment: Current quantitative results and suggestions for future contracts." Presented at the 85th Transportation Research Board Annual Meeting, Transportation Research Board (TRB), Washington DC.
-
(2006)
-
-
Robinson, D.M.1
Raynault, E.2
Frazer, W.3
Lakew, M.4
Rennie, S.5
Sheldahl, E.A.6
-
50
-
-
44249086028
-
GAMS-A user's guide
-
GAMS Development Corporation, Washington, DC. (June 2011).
-
Rosenthal, R. E. (2010). "GAMS-A user's guide." GAMS Development Corporation, Washington, DC. http://www.gams.com/dd/docs/bigdocs/ GAMSUsersGuide.pdf (June 2011).
-
(2010)
-
-
Rosenthal, R.E.1
-
51
-
-
84894056785
-
Pavement preservation programming: A multi-year multi-constraint optimization methodology
-
Transportation Research Board (TRB), Washington DC.
-
Scheinberg, T., and Anastasopoulos, P. C. (2010). "Pavement preservation programming: A multi-year multi-constraint optimization methodology." 89th Transportation Research Board Annual Meeting, Transportation Research Board (TRB), Washington DC.
-
(2010)
89th Transportation Research Board Annual Meeting
-
-
Scheinberg, T.1
Anastasopoulos, P.C.2
-
52
-
-
0003459385
-
Pavement maintenance management for roads and streets using the PAVER system
-
USA CERL Technical Report M-90/05, Champaign, IL.
-
Shahin, M. Y., and Walther, J. A. (1990). "Pavement maintenance management for roads and streets using the PAVER system." USA CERL Technical Report M-90/05, Champaign, IL.
-
(1990)
-
-
Shahin, M.Y.1
Walther, J.A.2
-
53
-
-
84876728826
-
Final report: smoothness specifications for pavements
-
NCHRP Web Document 1. National Cooperative Highway Research Program, Washington, DC.
-
Smith, K. L., Smith, K. D., Evans, L. D., Hoerner, T. E., Darter, M. I., and Woodstrom, J. H. (1997). "Final report: smoothness specifications for pavements." NCHRP Web Document 1. National Cooperative Highway Research Program, Washington, DC.
-
(1997)
-
-
Smith, K.L.1
Smith, K.D.2
Evans, L.D.3
Hoerner, T.E.4
Darter, M.I.5
Woodstrom, J.H.6
-
54
-
-
78449252532
-
Contrats basés sur les résultats pour la préservation et l'amélioration des actifs routiers
-
Transport Note TN-27. World Bank, Washington, DC.
-
Stankevich, N., Qureshi, N., and Queiroz, C. (2005). "Contrats basés sur les résultats pour la préservation et l'amélioration des actifs routiers." Transport Note TN-27. World Bank, Washington, DC.
-
(2005)
-
-
Stankevich, N.1
Qureshi, N.2
Queiroz, C.3
-
55
-
-
1942440489
-
Decision-making problem for managing pavement maintenance and rehabilitation projects
-
Transportation Research Board, Washington, DC
-
Wang, F., Zhang, Z., and Machemehl, R. B. (2003). "Decision-making problem for managing pavement maintenance and rehabilitation projects." Transportation Research Record 1853, Transportation Research Board, Washington, DC, 21-28.
-
(2003)
Transportation Research Record 1853
, pp. 21-28
-
-
Wang, F.1
Zhang, Z.2
Machemehl, R.B.3
-
56
-
-
38849140162
-
Estimating investment requirement for maintaining and improving highway systems
-
Yin, Y., Lawphongpanich, S., and Lou, Y. (2008). "Estimating investment requirement for maintaining and improving highway systems." Transp. Res. C, 16(2), 199-211.
-
(2008)
Transp. Res. C
, vol.16
, Issue.2
, pp. 199-211
-
-
Yin, Y.1
Lawphongpanich, S.2
Lou, Y.3
-
57
-
-
30844473301
-
Public clients' best value perspectives of public private partnerships in infrastructure development
-
10.1061/(ASCE)0733-9364(2006)132:2(107)
-
Zhang, X. (2006). "Public clients' best value perspectives of public private partnerships in infrastructure development." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:2(107), 107-114.
-
(2006)
J. Constr. Eng. Manage.
, pp. 107-114
-
-
Zhang, X.1
-
58
-
-
76749096241
-
Implementing performance-based road management and maintenance contracts in developing countries-An instrument of German technical cooperation
-
German Development Cooperation, Eschborn, Germany.
-
Zietlow, G. (2004). "Implementing performance-based road management and maintenance contracts in developing countries-An instrument of German technical cooperation." Report 11/2004, German Development Cooperation, Eschborn, Germany.
-
(2004)
Report 11/2004
-
-
Zietlow, G.1
-
59
-
-
76549114840
-
Cutting costs and improving quality through performance-based road management and maintenance contracts-The Latin American and OECD experiences
-
Regional Arusha, Arusha, Tanzania.
-
Zietlow, G. (2005). "Cutting costs and improving quality through performance-based road management and maintenance contracts-The Latin American and OECD experiences." Regional Seminar on Performance-Based Road Management and Maintenance Contracts, Regional Arusha, Arusha, Tanzania.
-
(2005)
Regional Seminar on Performance-Based Road Management and Maintenance Contracts
-
-
Zietlow, G.1
|