-
1
-
-
0242269877
-
A design strategy for reconfigurable manufacturing systems (rmss) using analytical hierarchical process (ahp): A case study
-
Abdi, M. R., and A. W. Labib. 2003. "A Design Strategy for Reconfigurable Manufacturing Systems (RMSs) using Analytical Hierarchical Process (AHP): A Case Study." International Journal of Production Research 41 (10): 2273-2299.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.10
, pp. 2273-2299
-
-
Abdi, M.R.1
Labib, A.W.2
-
2
-
-
78650596697
-
Performance evaluation of reconfigurable manufacturing systems via holonic architecture and the analytic network process
-
Abdi, M. R., and A. W. Labib. 2011. "Performance Evaluation of Reconfigurable Manufacturing Systems via Holonic Architecture and the Analytic Network Process." International Journal of Production Research 49 (5): 1319-1335.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.5
, pp. 1319-1335
-
-
Abdi, M.R.1
Labib, A.W.2
-
4
-
-
0000816725
-
Be integer programs
-
Barnhart, C., E. L. Johnson, G. L. Nemhauser, M. W. Savelsbergh, and P. H. Vance. 1998. "Be Integer Programs." Operations Research 46 (3): 316-329.
-
(1998)
Operations Research
, vol.46
, Issue.3
, pp. 316-329
-
-
Barnhart, C.1
Johnson, E.L.2
Nemhauser, G.L.3
Savelsbergh, M.W.4
Vance, P.H.5
-
5
-
-
84874540167
-
A taxonomy of line balancing problems and their solution approaches
-
Battaia, O., and A. Dolgui. 2013. "A Taxonomy of Line Balancing Problems and their Solution Approaches." International Journal of Production Economics 142: 259-277.
-
(2013)
International Journal of Production Economics
, vol.142
, pp. 259-277
-
-
Battaia, O.1
Dolgui, A.2
-
6
-
-
36248974607
-
Reconfigurable manufacturing systems: The state of the art
-
Bi, Z. M., Z. Y. T. Lang, W. Zen, and L. Wang. 2008. "Reconfigurable Manufacturing Systems: The State of the Art." International Journal of Production Research 46 (4): 967-992.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.4
, pp. 967-992
-
-
Bi, Z.M.1
Lang, Z.Y.T.2
Zen, W.3
Wang, L.4
-
9
-
-
0032309720
-
Multi-depot vehicle scheduling problems with time windows and waiting costs
-
Desaulniers, G., J. Lavigne, and F. Soumis. 1998. "Multi-depot Vehicle Scheduling Problems with Time Windows and Waiting Costs." European Journal of Operational Research 111 (3): 479-494.
-
(1998)
European Journal of Operational Research
, vol.111
, Issue.3
, pp. 479-494
-
-
Desaulniers, G.1
Lavigne, J.2
Soumis, F.3
-
10
-
-
77957089136
-
Time constrained routing and scheduling
-
Desrosiers, J., Y. Dumas, M. M. Solomon, and F. Soumis. 1995. "Time Constrained Routing and Scheduling." Handbooks in Operations Research and Management Science 8: 35-139.
-
(1995)
Handbooks in Operations Research and Management Science
, vol.8
, pp. 35-139
-
-
Desrosiers, J.1
Dumas, Y.2
Solomon, M.M.3
Soumis, F.4
-
11
-
-
0021691757
-
Routing with time windows by column generation
-
Desrosiers, J., F. Soumis, and M. Desrochers. 1984. "Routing with Time Windows by Column Generation." Networks 14: 545-565.
-
(1984)
Networks
, vol.14
, pp. 545-565
-
-
Desrosiers, J.1
Soumis, F.2
Desrochers, M.3
-
12
-
-
43649093154
-
Reconfigurable process plans for responsive manufacturing systems
-
edited by Pedro Filipe Cunha, and Paul G. Maropoulos, Springer.
-
ElMaraghy, H. A. 2007. "Reconfigurable Process Plans for Responsive Manufacturing Systems." In Digital Enterprise Technology, Perspectives and Future Challenges, edited by Pedro Filipe Cunha, and Paul G. Maropoulos, 35-44. Springer.
-
(2007)
Digital Enterprise Technology, Perspectives and Future Challenges
, pp. 35-44
-
-
ElMaraghy, H.A.1
-
14
-
-
84867081681
-
A reactive grasp and path relinking for balancing reconfigurable transfer lines
-
Essafi, M., X. Delorme, and A. Dolgui. 2012. "A Reactive GRASP and Path Relinking for Balancing Reconfigurable Transfer Lines." International Journal of Production Research 50 (18): 5213-5238.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 5213-5238
-
-
Essafi, M.1
Delorme, X.2
Dolgui, A.3
-
16
-
-
0021489143
-
A combined vehicle routing and inventory allocation problem
-
Federgruen, A., and P. Zipkin. 1984. "A Combined Vehicle Routing and Inventory Allocation Problem." Operations Research 32 (5): 1019-1037.
-
(1984)
Operations Research
, vol.32
, Issue.5
, pp. 1019-1037
-
-
Federgruen, A.1
Zipkin, P.2
-
17
-
-
0032637840
-
A column generation approach for large-scale aircrew rostering problems
-
Gamache, M., F. Soumis, and G. Marquis. 1999. "A Column Generation Approach for Large-scale Aircrew Rostering Problems." Operations Research 47 (2): 247-263.
-
(1999)
Operations Research
, vol.47
, Issue.2
, pp. 247-263
-
-
Gamache, M.1
Soumis, F.2
Marquis, G.3
-
18
-
-
0001179988
-
Crane scheduling with time windows in circuit board production lines
-
Ge, Y., and Y. Yih. 1995. "Crane Scheduling with Time Windows in Circuit Board Production Lines." International Journal of Production Research 33: 1187-1199.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1187-1199
-
-
Ge, Y.1
Yih, Y.2
-
19
-
-
0015973449
-
Multi-commodity distribution system design by bender decomposition
-
Geoffrion, A. M., and G. W. Graves. 1974. "Multi-commodity Distribution System Design by Bender Decomposition." Operations Research 20 (5): 822-844.
-
(1974)
Operations Research
, vol.20
, Issue.5
, pp. 822-844
-
-
Geoffrion, A.M.1
Graves, G.W.2
-
21
-
-
0030420946
-
Modeling and analysis of flexible fixturing systems for agile manufacturing
-
Beijing, October 14-17
-
Hong, M., S. Payandeh, and W. A. Gruver. 1996. "Modeling and Analysis of Flexible Fixturing Systems for Agile Manufacturing." In Systems, Man, and Cybernetics, IEEE International Conference on, Beijing, October 14-17, 2: 1231-1236.
-
(1996)
Systems, Man, and Cybernetics, IEEE International Conference on
, vol.2
, pp. 1231-1236
-
-
Hong, M.1
Payandeh, S.2
Gruver, W.A.3
-
22
-
-
0038399867
-
Part dimensional error and its propagation modeling in multi-operational machining processes
-
Huang, Q., J. Shi, and J. Yuan. 2003. "Part Dimensional Error and its Propagation Modeling in Multi-operational Machining Processes." ASME Journal of Manufacturing Science in Engineering 125: 255-262.
-
(2003)
ASME Journal of Manufacturing Science in Engineering
, vol.125
, pp. 255-262
-
-
Huang, Q.1
Shi, J.2
Yuan, J.3
-
23
-
-
0003871857
-
A dynamic programming algorithm for the shortest path problem with time windows and linear node costs
-
Ioachim, I., S. Gelinas, J. Desrosiers, and F. Soumis. 1998. "A Dynamic Programming Algorithm for the Shortest Path Problem with Time Windows and Linear Node Costs." Networks 3: 193-204.
-
(1998)
Networks
, vol.3
, pp. 193-204
-
-
Ioachim, I.1
Gelinas, S.2
Desrosiers, J.3
Soumis, F.4
-
24
-
-
0003070321
-
Process capability index
-
Kane, V. E. 1986. "Process Capability Index." Journal of Quality Technology 18 (1): 41-52.
-
(1986)
Journal of Quality Technology
, vol.18
, Issue.1
, pp. 41-52
-
-
Kane, V.E.1
-
25
-
-
0033340198
-
Reconfigurable manufacturing systems
-
Koren, Y., U. Heisel, F. Jovane, T. Moriwaki, G. Pritschow, G. Ulsoy, and H. Van Brussel. 1999. "Reconfigurable Manufacturing Systems." CIRP Annals-Manufacturing Technology 48 (2): 527-540.
-
(1999)
CIRP Annals-Manufacturing Technology
, vol.48
, Issue.2
, pp. 527-540
-
-
Koren, Y.1
Heisel, U.2
Jovane, F.3
Moriwaki, T.4
Pritschow, G.5
Ulsoy, G.6
Van Brussel, H.7
-
26
-
-
84884974378
-
Mass customization design of engineer-to-order products using benders' decomposition and bi-level stochastic programming
-
Kristianto, Y., P. Helo, and R. J. Jiao. 2013. "Mass Customization Design of Engineer-to-order Products Using Benders' Decomposition and Bi-level Stochastic Programming." Journal of Intelligent Manufacturing 24: 961-975.
-
(2013)
Journal of Intelligent Manufacturing
, vol.24
, pp. 961-975
-
-
Kristianto, Y.1
Helo, P.2
Jiao, R.J.3
-
27
-
-
9544258275
-
A computational study of benders decomposition for the integrated aircraft routing and crew scheduling problem
-
Mercier, A., J. F. Cordeau, and F. Soumis. 2005. "A Computational Study of Benders Decomposition for the Integrated Aircraft Routing and Crew Scheduling Problem." Computers and Operations Research 32: 1451-1476.
-
(2005)
Computers and Operations Research
, vol.32
, pp. 1451-1476
-
-
Mercier, A.1
Cordeau, J.F.2
Soumis, F.3
-
28
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus, E. L. 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction." Operations Research 34 (19): 137-144.
-
(1986)
Operations Research
, vol.34
, Issue.19
, pp. 137-144
-
-
Porteus, E.L.1
-
29
-
-
0022676316
-
Economic production cycle with imperfect production processes
-
Rosenblatt, M. J., and H. L. Lee. 1986. "Economic Production Cycle with Imperfect Production Processes." IIE Transactions 18: 48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
31
-
-
0035466857
-
An optimization model for the simultaneous operational flight and pilot scheduling problem
-
Stojkovic, M., and F. Soumis. 2001. "An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem." Management Science 47 (9): 1290-1305.
-
(2001)
Management Science
, vol.47
, Issue.9
, pp. 1290-1305
-
-
Stojkovic, M.1
Soumis, F.2
-
32
-
-
4944248025
-
Integrated design approach for virtual production line-based reconfigurable manufacturing systems
-
Tang, Y., Z. M. Bi, and R. G. Qiu. 2004. "Integrated Design Approach for Virtual Production Line-based Reconfigurable Manufacturing Systems." International Journal of Production Research 42 (18): 3803-3822.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.18
, pp. 3803-3822
-
-
Tang, Y.1
Bi, Z.M.2
Qiu, R.G.3
-
33
-
-
0023386648
-
Reliability, pricing and quality control
-
Tapiero, C. S., P. H. Ritchken, and A. Reisman. 1987. "Reliability, Pricing and Quality Control." European Journal of Operational Research 31: 37-45.
-
(1987)
European Journal of Operational Research
, vol.31
, pp. 37-45
-
-
Tapiero, C.S.1
Ritchken, P.H.2
Reisman, A.3
-
34
-
-
0031096922
-
Airline crew scheduling: A new formulation and decomposition algorithm
-
Vance, P., C. Barnhart, E. Johnson, and G. Nemhauser. 1997. "Airline Crew Scheduling: A New Formulation and Decomposition Algorithm." Operations Research 45 (2): 188-200.
-
(1997)
Operations Research
, vol.45
, Issue.2
, pp. 188-200
-
-
Vance, P.1
Barnhart, C.2
Johnson, E.3
Nemhauser, G.4
-
35
-
-
0035452379
-
Simultaneous determination of the optimal production inventory and product inspection policies for a deteriorating production system
-
Wang, C. H., and H. S. Sheu. 2001. "Simultaneous Determination of the Optimal Production Inventory and Product Inspection Policies for a Deteriorating Production System." Computers and Operations Research 28: 1093-1110.
-
(2001)
Computers and Operations Research
, vol.28
, pp. 1093-1110
-
-
Wang, C.H.1
Sheu, H.S.2
-
36
-
-
0034631276
-
A stochastic model of a reconfigurable manufacturing systems. Part 1. A framework
-
Xiaobo, Z., W. Jiancai, and L. Zhenbi. 2000. "A Stochastic Model of a Reconfigurable Manufacturing Systems. Part 1. A Framework." International Journal of Production Research 38: 2273-2285.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2273-2285
-
-
Xiaobo, Z.1
Jiancai, W.2
Zhenbi, L.3
|