-
1
-
-
0031098890
-
Operation plug-and-play is on the way
-
Aronson, R.B., 1997, Operation plug-and-play is on the way. Manufacturing Engineering, 108-112.
-
(1997)
Manufacturing Engineering
, pp. 108-112
-
-
Aronson, R.B.1
-
2
-
-
0001514851
-
Heuristic scheduling of parallel heterogeneous queues with set-ups
-
Duenyas, I. and Van Oyen M.P., 1996, Heuristic scheduling of parallel heterogeneous queues with set-ups. Management Science, 42, 814-829.
-
(1996)
Management Science
, vol.42
, pp. 814-829
-
-
Duenyas, I.1
Van Oyen, M.P.2
-
3
-
-
0030110789
-
A new comprehensive sheared delay formula for traffic signal optimization
-
Han, B., 1996, A new comprehensive sheared delay formula for traffic signal optimization. Transportation Research A, 30, 155-171.
-
(1996)
Transportation Research A
, vol.30
, pp. 155-171
-
-
Han, B.1
-
4
-
-
0032685930
-
Facility layout design in a changing environment
-
Kochhar, J.S. and Heragu, S.S., 1999, Facility layout design in a changing environment. International Journal of Production Research, 37, 2429-2446.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 2429-2446
-
-
Kochhar, J.S.1
Heragu, S.S.2
-
5
-
-
0002209079
-
Reconfiguration manufacturing systems
-
Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritschow, G., Ulsoy, G. and Van Brussel, H., 1999, Reconfiguration manufacturing systems. Annals of the CIRP, 48, 1-14.
-
(1999)
Annals of the CIRP
, vol.48
, pp. 1-14
-
-
Koren, Y.1
Heisel, U.2
Jovane, F.3
Moriwaki, T.4
Pritschow, G.5
Ulsoy, G.6
Van Brussel, H.7
-
6
-
-
0031677622
-
Project scheduling algorithms for re-layout projects
-
Lacksonen, T.A. and Hung, C.Y., 1998, Project scheduling algorithms for re-layout projects, IIE Transactions, 30, 91-99.
-
(1998)
IIE Transactions
, vol.30
, pp. 91-99
-
-
Lacksonen, T.A.1
Hung, C.Y.2
-
7
-
-
0030682544
-
Reconfigurability consideration design of components and manufacturing systems
-
Lee, G.H., 1997, Reconfigurability consideration design of components and manufacturing systems. International Journal of Advanced Manufacturing Technology, 13, 376-386.
-
(1997)
International Journal of Advanced Manufacturing Technology
, vol.13
, pp. 376-386
-
-
Lee, G.H.1
-
8
-
-
0025665871
-
A computer based production scheduling architecture suitable for driving a reconfigurable manufacturing system
-
Liles, D.H. and Huff, B.L., 1990, A computer based production scheduling architecture suitable for driving a reconfigurable manufacturing system. Computers and Industrial Engineering, 19, 1-5.
-
(1990)
Computers and Industrial Engineering
, vol.19
, pp. 1-5
-
-
Liles, D.H.1
Huff, B.L.2
-
9
-
-
0028753791
-
New developments in assembly systems
-
Makino, H. and Arai, T., 1994, New developments in assembly systems. Annals of the CIRP, 42, 501-522.
-
(1994)
Annals of the CIRP
, vol.42
, pp. 501-522
-
-
Makino, H.1
Arai, T.2
-
10
-
-
0003449926
-
-
Norcross, GA: Institute of Industrial Engineers
-
Monden, Y., 1993, Toyota Production System (Norcross, GA: Institute of Industrial Engineers).
-
(1993)
Toyota Production System
-
-
Monden, Y.1
-
11
-
-
0029369874
-
Physically reconfigurable virtual cells: A dynamic model for a highly dynamic environment
-
Rheault, M., Drolet, J.R. and Abdulnour, G.M., 1995, Physically reconfigurable virtual cells: A dynamic model for a highly dynamic environment. Computers and Industrial Engineering, 29, 221-225.
-
(1995)
Computers and Industrial Engineering
, vol.29
, pp. 221-225
-
-
Rheault, M.1
Drolet, J.R.2
Abdulnour, G.M.3
-
12
-
-
0026820120
-
Customer scheduling under queueing constraints
-
Rosberg, Z. and Kermani, P., 1992, Customer scheduling under queueing constraints. IEEE Transactions on Automatic Control, 37, 252-257.
-
(1992)
IEEE Transactions on Automatic Control
, vol.37
, pp. 252-257
-
-
Rosberg, Z.1
Kermani, P.2
-
13
-
-
0032122942
-
Flexible machine layout design for dynamic and uncertain production environments
-
Yang, T. and Peters, B.A., 1998, Flexible machine layout design for dynamic and uncertain production environments. European Journal of Operational Research, 108, 49-64.
-
(1998)
European Journal of Operational Research
, vol.108
, pp. 49-64
-
-
Yang, T.1
Peters, B.A.2
-
14
-
-
0011790896
-
-
Elsevier/North-Holland, New York: Transportation Engineering
-
Yu, J.C., 1982 (Elsevier/North-Holland, New York: Transportation Engineering).
-
(1982)
-
-
Yu, J.C.1
|