메뉴 건너뛰기




Volumn 2, Issue 3, 2010, Pages 176-182

Balancing lines with CNC machines: A multi-start ant based heuristic

Author keywords

Ant Colony Optimization; Line balancing; Machining systems; Reconfigurable transfer lines; Sequence dependent set up times

Indexed keywords

ANT-COLONY OPTIMIZATION; LINE BALANCING; MACHINING SYSTEMS; RE-CONFIGURABLE; SEQUENCE-DEPENDENT; SET-UP TIME; TRANSFER LINES;

EID: 77953650151     PISSN: 17555817     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cirpj.2010.05.002     Document Type: Article
Times cited : (30)

References (31)
  • 1
    • 36849023499 scopus 로고    scopus 로고
    • Balancing and Scheduling Tasks in Assembly Lines with Sequence-Dependent Setup Times
    • Andrés C., Miralles C., and Pastor R. Balancing and Scheduling Tasks in Assembly Lines with Sequence-Dependent Setup Times. European Journal of Operational Research 187 (2008) 1212-1223
    • (2008) European Journal of Operational Research , vol.187 , pp. 1212-1223
    • Andrés, C.1    Miralles, C.2    Pastor, R.3
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: A COmputer Method of Sequencing Operations for Assembly Lines
    • Arcus A.L. COMSOAL: A COmputer Method of Sequencing Operations for Assembly Lines. International Journal of Production Research 4 (1966) 259-277
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 4
    • 0031270224 scopus 로고    scopus 로고
    • A Parallel Station Heuristic for the Mixed-Model Production Line Balancing Problem
    • Askin R.G., and Zhou M. A Parallel Station Heuristic for the Mixed-Model Production Line Balancing Problem. International Journal of Production Research 35 11 (1997) 3095-3105
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 5
    • 0024673749 scopus 로고
    • Assembly Line Balancing with Parallel Workstations and Dead Time
    • Bard J.F. Assembly Line Balancing with Parallel Workstations and Dead Time. International Journal of Production Research 27 6 (1989) 1005-1018
    • (1989) International Journal of Production Research , vol.27 , Issue.6 , pp. 1005-1018
    • Bard, J.F.1
  • 6
    • 33751255097 scopus 로고    scopus 로고
    • Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem
    • Bautista J., and Pereira J. Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem. European Journal of Operational Research 177 3 (2007) 2016-2032
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 7
    • 0022768294 scopus 로고
    • A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
    • Baybars I. A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem. Management Science 32 8 (1986) 909-932
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 8
    • 75449112582 scopus 로고    scopus 로고
    • Bi-Objective Ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling
    • Berrichi A., Yalaoui F., Amodeo L., and Mezghiche M. Bi-Objective Ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling. Computers & Operations Research 37 9 (2010) 1584-1596
    • (2010) Computers & Operations Research , vol.37 , Issue.9 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 10
    • 0037230929 scopus 로고    scopus 로고
    • A Weighted Approach for Assembly Line Design with Station Paralleling and Equipment Selection
    • Bukchin J., and Rubinovitz A. A Weighted Approach for Assembly Line Design with Station Paralleling and Equipment Selection. IIE Transactions 35 (2002) 73-85
    • (2002) IIE Transactions , vol.35 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, A.2
  • 11
    • 0016027179 scopus 로고
    • Assembly Line Balancing with Multiple Stations
    • Buxey G.M. Assembly Line Balancing with Multiple Stations. Management Science 20 (1974) 1010-1021
    • (1974) Management Science , vol.20 , pp. 1010-1021
    • Buxey, G.M.1
  • 15
    • 33746402024 scopus 로고    scopus 로고
    • MIP Approach to Balancing Transfer Lines with Blocks of Parallel Operations
    • Dolgui A., Finel B., Guschinsky N., Levin G., and Vernadat F. MIP Approach to Balancing Transfer Lines with Blocks of Parallel Operations. IIE Transactions 38 (2006) 869-882
    • (2006) IIE Transactions , vol.38 , pp. 869-882
    • Dolgui, A.1    Finel, B.2    Guschinsky, N.3    Levin, G.4    Vernadat, F.5
  • 16
    • 62149119493 scopus 로고    scopus 로고
    • Branch and Bound Algorithm for a Transfer Line Design Problem: Stations with Sequentially Activated Multi-Spindle Heads
    • Dolgui A., and Ihnatsenka I. Branch and Bound Algorithm for a Transfer Line Design Problem: Stations with Sequentially Activated Multi-Spindle Heads. European Journal of Operational Research 197 3 (2009) 1119-1132
    • (2009) European Journal of Operational Research , vol.197 , Issue.3 , pp. 1119-1132
    • Dolgui, A.1    Ihnatsenka, I.2
  • 17
    • 77953651267 scopus 로고    scopus 로고
    • Dorigo, M., 1992, Optimization, Learning and Natural Algorithms (in Italian), Ph.D. Thesis, Dipartimento di Elettronica, Politecnico di Milano.
    • Dorigo, M., 1992, Optimization, Learning and Natural Algorithms (in Italian), Ph.D. Thesis, Dipartimento di Elettronica, Politecnico di Milano.
  • 18
    • 84901418243 scopus 로고    scopus 로고
    • Ant Colony Optimization: A New Meta-Heuristic
    • Angeline P.J., Michalewicz Z., Schoenauer M., Yao X., and Zalzala A. (Eds), IEEE Press
    • Dorigo M., and Di Caro G. Ant Colony Optimization: A New Meta-Heuristic. In: Angeline P.J., Michalewicz Z., Schoenauer M., Yao X., and Zalzala A. (Eds). Proceeding of the Congress on Evolutionary Computation, vol. 2 (1999), IEEE Press 1470-1477
    • (1999) Proceeding of the Congress on Evolutionary Computation, vol. 2 , pp. 1470-1477
    • Dorigo, M.1    Di Caro, G.2
  • 19
    • 0030759617 scopus 로고    scopus 로고
    • Ant Colonies for the Travelling Salesman Problem
    • Dorigo M., and Gambardella L.M. Ant Colonies for the Travelling Salesman Problem. BioSystems 43 (1997) 73-81
    • (1997) BioSystems , vol.43 , pp. 73-81
    • Dorigo, M.1    Gambardella, L.M.2
  • 20
    • 77953650030 scopus 로고    scopus 로고
    • A Heuristic Method for Balancing Machining Lines with Paralleling of Stations and Sequence-Dependent Setup Times
    • Sousse, Tunisia, 18-20 November
    • Essafi M., Delorme X., and Dolgui A. A Heuristic Method for Balancing Machining Lines with Paralleling of Stations and Sequence-Dependent Setup Times. Proceeding of the International Workshop LT2007. Sousse, Tunisia, 18-20 November (2007) 349-354
    • (2007) Proceeding of the International Workshop LT2007 , pp. 349-354
    • Essafi, M.1    Delorme, X.2    Dolgui, A.3
  • 21
  • 22
    • 40849119751 scopus 로고    scopus 로고
    • A Heuristic Multi-Start Decomposition Approach for Optimal Design of Serial Machining Lines
    • Guschinskaya O., Dolgui A., Guschinsky N., and Levin G. A Heuristic Multi-Start Decomposition Approach for Optimal Design of Serial Machining Lines. European Journal of Operational Research 189 3 (2008) 902-913
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 902-913
    • Guschinskaya, O.1    Dolgui, A.2    Guschinsky, N.3    Levin, G.4
  • 23
    • 0001108060 scopus 로고
    • Assembly Line Balancing Using the Ranked Positional Weight Technic
    • Helgeson W.P., and Birnie D.P. Assembly Line Balancing Using the Ranked Positional Weight Technic. Journal of Industrial Engineering 12 (1961) 394-398
    • (1961) Journal of Industrial Engineering , vol.12 , pp. 394-398
    • Helgeson, W.P.1    Birnie, D.P.2
  • 27
    • 67651163455 scopus 로고    scopus 로고
    • Ant Colony Optimization for the Single Model U-type Assembly Line Balancing Problem
    • Sabuncuoglu I., Erel E., and Alp A. Ant Colony Optimization for the Single Model U-type Assembly Line Balancing Problem. International Journal of Production Economics 120 (2009) 287-300
    • (2009) International Journal of Production Economics , vol.120 , pp. 287-300
    • Sabuncuoglu, I.1    Erel, E.2    Alp, A.3
  • 29
    • 43449085514 scopus 로고    scopus 로고
    • The Sequence-Dependent Assembly Line Balancing Problem
    • Scholl A., Boysen N., and Fliedner M. The Sequence-Dependent Assembly Line Balancing Problem. Operational Research Spectrum 30 3 (2008) 579-609
    • (2008) Operational Research Spectrum , vol.30 , Issue.3 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 31
    • 0032651420 scopus 로고    scopus 로고
    • A Column-Generation Approach for the Assembly System Design Problem with Tool Changes
    • Wilhelm W.E. A Column-Generation Approach for the Assembly System Design Problem with Tool Changes. International Journal of Flexible Manufacturing Systems 11 (1999) 177-205
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 177-205
    • Wilhelm, W.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.