메뉴 건너뛰기




Volumn , Issue , 2013, Pages 718-730

Real-time simulation of earthmoving projects using automated machine guidance

Author keywords

4D modeling; Automated Machine Control Guidance; Real time simulation

Indexed keywords

ROBOTICS; SIMULATION PLATFORM; STOCHASTIC CONTROL SYSTEMS; STOCHASTIC SYSTEMS; UNCERTAINTY ANALYSIS;

EID: 84893601209     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2013/0079     Document Type: Conference Paper
Times cited : (3)

References (19)
  • 2
    • 84867902111 scopus 로고    scopus 로고
    • An integrated data collection and analysis framework for remote monitoring and planning of construction operations
    • Akhavian, R., & Behzadan, A. H. (2012). An integrated data collection and analysis framework for remote monitoring and planning of construction operations. Advanced Engineering Informatics, 26(4), 749-761.
    • (2012) Advanced Engineering Informatics , vol.26 , Issue.4 , pp. 749-761
    • Akhavian, R.1    Behzadan, A.H.2
  • 3
    • 0033332630 scopus 로고    scopus 로고
    • Real world applications of construction process simulation
    • Halpin, D. W., & Martinez, L. H. (1999). Real World Applications of Construction Process Simulation. Winter Simulation Conference (pp. 956-962).
    • (1999) Winter Simulation Conference , pp. 956-962
    • Halpin, D.W.1    Martinez, L.H.2
  • 4
    • 84863295559 scopus 로고    scopus 로고
    • Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity
    • Phoenix
    • Hammad, A., & Zhang, C. (2011). Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity. Proceeding of the 2011 Winter Simulation Conference (pp. 3533-3544). Phoenix.
    • (2011) Proceeding of the 2011 Winter Simulation Conference , pp. 3533-3544
    • Hammad, A.1    Zhang, C.2
  • 5
    • 0001138328 scopus 로고
    • Algorithm AS 136: A k-means clustering algorithm
    • Hartigan, J., & Wong, M. A. (1979). Algorithm AS 136: A k-means clustering algorithm. Applied Statistics, 100-108.
    • (1979) Applied Statistics , pp. 100-108
    • Hartigan, J.1    Wong, M.A.2
  • 7
    • 84893577175 scopus 로고    scopus 로고
    • Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles
    • Hassan, S., Al-Hussein, M., & Gillis, P. (2010). Advanced Simulation of Tower Crane Operation Utilizing System Dynamics Modeling and Lean Principles. Proceeding of the 2010 Winter Simulation Conference (pp. 3262-3271).
    • (2010) Proceeding of the 2010 Winter Simulation Conference , pp. 3262-3271
    • Hassan, S.1    Al-Hussein, M.2    Gillis, P.3
  • 9
    • 36348997718 scopus 로고    scopus 로고
    • Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms
    • Lu, M., Dai, F., & Chen, W. (2007). Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms. Canadian Journal of Civil Engineering, 912-922.
    • (2007) Canadian Journal of Civil Engineering , pp. 912-922
    • Lu, M.1    Dai, F.2    Chen, W.3
  • 12
    • 77956615844 scopus 로고    scopus 로고
    • The use of computing technology in highway construction as a total jobsite management tool
    • Perkinson, C. L., and Bayraktar., M. E., & Ahmad, I. (2010). The use of computing technology in highway construction as a total jobsite management tool. Automation in Construction, 19(7), 884-897.
    • (2010) Automation in Construction , vol.19 , Issue.7 , pp. 884-897
    • Perkinson, C.L.1    Bayraktar, M.E.2    Ahmad, I.3
  • 15
    • 84863701904 scopus 로고    scopus 로고
    • Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
    • Song, L., & Eldin, N. N. (2012). Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. Automation in Construction, 27, 32-39.
    • (2012) Automation in Construction , vol.27 , pp. 32-39
    • Song, L.1    Eldin, N.N.2
  • 17
    • 84893592078 scopus 로고    scopus 로고
    • 10 2 Retrieved
    • SX Blue GPS. (2013, 10 2). Retrieved from http://www.sxbluegps.com/intro- carrier-phase.html
    • (2013)
  • 18
    • 77955716869 scopus 로고    scopus 로고
    • Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
    • Teizer, J., and Allread., B. S., Fullerton, C. E., & Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19(5), 630-640.
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 630-640
    • Teizer, J.1    Allread, B.S.2    Fullerton, C.E.3    Hinze, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.