-
1
-
-
84893566341
-
Optimization of total energy consumption in flexible manufacturing systems using weighted p-timed Petri nets and dynamic programming
-
in press
-
C. K. Pang and C. V. Le, "Optimization of total energy consumption in flexible manufacturing systems using weighted p-timed Petri nets and dynamic programming," IEEE Trans Autom Sci Eng., in press.
-
IEEE Trans Autom Sci Eng
-
-
Pang, C.K.1
Le, C.V.2
-
2
-
-
84861589845
-
Energyaware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops
-
A. A. G. Bruzzone, D. Anghinolfi, M. Paolucci, and F. Tonelli, "Energyaware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops," CIRP Ann. Manuf. Technol., vol. 61, no. 1, pp. 459-462, 2012.
-
(2012)
CIRP Ann. Manuf. Technol.
, vol.61
, Issue.1
, pp. 459-462
-
-
Bruzzone, A.A.G.1
Anghinolfi, D.2
Paolucci, M.3
Tonelli, F.4
-
3
-
-
84869106299
-
Parallel-machine scheduling to minimize tardiness penalty and power cost
-
January
-
K.-T. Fang and B. M. T. Lin, "Parallel-machine scheduling to minimize tardiness penalty and power cost," Comput. Ind. Eng., vol. 64, no. 1, pp. 224-234, January 2013.
-
(2013)
Comput. Ind. Eng
, vol.64
, Issue.1
, pp. 224-234
-
-
Fang, K.-T.1
Lin, B.M.T.2
-
4
-
-
80255137417
-
Evolutionary algorithm for stochastic job shop scheduling with random processing time
-
S. C. Horng, S. S. Lin, and F. Y. Yang, "Evolutionary algorithm for stochastic job shop scheduling with random processing time," Expert Syst. Appl., vol. 39, no. 3, pp. 3603-3610, 2012.
-
(2012)
Expert Syst. Appl.
, vol.39
, Issue.3
, pp. 3603-3610
-
-
Horng, S.C.1
Lin, S.S.2
Yang, F.Y.3
-
5
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
D. Ouelhadj and S. Petrovic, "A survey of dynamic scheduling in manufacturing systems," J. Sched., vol. 12, no. 4, pp. 417-431, 2009.
-
(2009)
J. Sched.
, vol.12
, Issue.4
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
-
7
-
-
84893526985
-
Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties
-
in press
-
C. V. Le and C. K. Pang, "Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties," Comput. Ind. Eng., in press.
-
Comput. Ind. Eng
-
-
Le, C.V.1
Pang, C.K.2
-
8
-
-
35348880508
-
-
London, UK: Springer-Verlag
-
S. Bogdan, F. Lewis, Z. Kovacic, and J. Mireles Jr., Manufacturing Systems Control Design: A Matrix-based Approach. London, UK: Springer-Verlag, 2006.
-
(2006)
Manufacturing Systems Control Design: A Matrix-based Approach
-
-
Bogdan, S.1
Lewis, F.2
Kovacic, Z.3
Mireles Jr., J.4
-
9
-
-
82855182278
-
-
Boca Raton, FL, USA: CRC Press, Taylor and Francis Group
-
C. K. Pang, F. L. Lewis, T. H. Lee, and Z. Y. Dong, Intelligent Diagnosis and Prognosis of Industrial Networked Systems. Boca Raton, FL, USA: CRC Press, Taylor and Francis Group, 2011.
-
(2011)
Intelligent Diagnosis and Prognosis of Industrial Networked Systems
-
-
Pang, C.K.1
Lewis, F.L.2
Lee, T.H.3
Dong, Z.Y.4
-
10
-
-
36749027726
-
Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems
-
A. Prakash, N. Khilwani, M. K. Tiwari, and Y. Cohen, "Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems," Adv. Eng. Softw., vol. 39, no. 3, pp. 219-232, 2008.
-
(2008)
Adv. Eng. Softw.
, vol.39
, Issue.3
, pp. 219-232
-
-
Prakash, A.1
Khilwani, N.2
Tiwari, M.K.3
Cohen, Y.4
|