메뉴 건너뛰기




Volumn , Issue , 2013, Pages 417-425

In search of the ideal truck-excavator combination

Author keywords

Earthmoving; Fleet selection; Heavy civil construction; Mining; Monte Carlo simulation

Indexed keywords

CONSTRUCTION EQUIPMENT; EFFICIENCY; EXCAVATION; EXCAVATORS; INTELLIGENT SYSTEMS; MINE TRUCKS; MINING; MONTE CARLO METHODS; ROBOTICS;

EID: 84893586955     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2013/0045     Document Type: Conference Paper
Times cited : (6)

References (13)
  • 1
    • 36549053150 scopus 로고    scopus 로고
    • Match factor for heterogeneous truck and loader fleets
    • Burt, C.N. and Caccetta, L. (2007). "Match factor for heterogeneous truck and loader fleets.," Int. J. Mini. Reclamat. Environ., 21(4), 262-270.
    • (2007) Int. J. Mini. Reclamat. Environ. , vol.21 , Issue.4 , pp. 262-270
    • Burt, C.N.1    Caccetta, L.2
  • 2
    • 34249040596 scopus 로고    scopus 로고
    • 41st Ed. Caterpillar Inc., Peoria, Il
    • Caterpillar Performance Handbook, 41st Ed. (2011). Caterpillar Inc., Peoria, Il.
    • (2011) Caterpillar Performance Handbook
  • 4
    • 0344494308 scopus 로고    scopus 로고
    • Optimizing haul unit size and number based on loading facility characteristics
    • Gransberg, D.D. (1996). "Optimizing haul unit size and number based on loading facility characteristics.," J. Constr. Eng. Manage., 122(3), 248-253.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.3 , pp. 248-253
    • Gransberg, D.D.1
  • 5
    • 81855193659 scopus 로고    scopus 로고
    • Field studies in construction equipment economics and productivity
    • Kannan, G. (2011). "Field studies in construction equipment economics and productivity.," J. Constr. Eng. Manage., 137(10), 823-828
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.10 , pp. 823-828
    • Kannan, G.1
  • 6
    • 18244389105 scopus 로고
    • Truck capacity selection for earthmoving
    • Karshenas, S. (1989). "Truck capacity selection for earthmoving.," J. Constr. Eng. Manage., 115, 212-227.
    • (1989) J. Constr. Eng. Manage. , vol.115 , pp. 212-227
    • Karshenas, S.1
  • 7
    • 73949095829 scopus 로고    scopus 로고
    • An expert system for hydraulic excavator and truck selection in surface mining
    • Kirmanli, C. and Ercelebi, S.G. (2009). "An expert system for hydraulic excavator and truck selection in surface mining.," J. S. Afr. Inst. Min. Metall., 109, 727-738.
    • (2009) J. S. Afr. Inst. Min. Metall. , vol.109 , pp. 727-738
    • Kirmanli, C.1    Ercelebi, S.G.2
  • 9
    • 79961216509 scopus 로고    scopus 로고
    • Optimization of loader-hauler fleet selection
    • Limsiri, C. (2011). "Optimization of loader-hauler fleet selection.," Eur. J. Sci. Res., 56(2), 266-271.
    • (2011) Eur. J. Sci. Res. , vol.56 , Issue.2 , pp. 266-271
    • Limsiri, C.1
  • 10
    • 34250111733 scopus 로고
    • Optimizing off-highway truck characteristics for minimum haulage cost
    • Lineberry, G.T. (1985). "Optimizing off-highway truck characteristics for minimum haulage cost," Int. J. Mining Eng., 3, 295-310.
    • (1985) Int. J. Mining Eng. , vol.3 , pp. 295-310
    • Lineberry, G.T.1
  • 11
    • 0036024942 scopus 로고    scopus 로고
    • Bid preparation for earthmoving operations
    • Marzouk, M. and Moselhi, O. (2002). "Bid preparation for earthmoving operations.," Can. J. Civ. Eng., 29, 517-532.
    • (2002) Can. J. Civ. Eng. , vol.29 , pp. 517-532
    • Marzouk, M.1    Moselhi, O.2
  • 12
    • 84893614823 scopus 로고    scopus 로고
    • Earthwork and excavation
    • Fifth Edition, McGraw-Hill, New York, New York
    • Peurifoy, R.L., and Oberlender, G.D. (2004). "Earthwork and Excavation,". Estimating Construction Costs, Fifth Edition, McGraw-Hill, New York, New York.
    • (2004) Estimating Construction Costs
    • Peurifoy, R.L.1    Oberlender, G.D.2
  • 13
    • 0029522572 scopus 로고
    • Analysis of earth-moving systems using discrete-event simulation
    • Smith, S.D., Osborne, J.R. and Forde, M.C. (1995). "Analysis of earth-moving systems using discrete-event simulation.," J. Constr. Eng. Manage., 121(4), 388-396.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 388-396
    • Smith, S.D.1    Osborne, J.R.2    Forde, M.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.