Volumn 21, Issue 4, 2007, Pages 262-270

Match factor for heterogeneous truck and loader fleets

Author keywords

Equipment selection; Heterogeneous fleets; Match factor; Mixed fleets; Productivity

Indexed keywords

CONSTRUCTION; LOADERS; MINING; OPERATIONS RESEARCH; TRUCKS;

EID: 36549053150     PISSN: 17480930     EISSN: 17480949     Source Type: Journal    
DOI: 10.1080/17480930701388606     Document Type: Conference Paper
Times cited : (79)

References (9)
  • 2
    • 61649115729 scopus 로고    scopus 로고
    • Open-pit truck/shovel haulage system simulation
    • Cetin, N. Open-pit truck/shovel haulage system simulation
    • Cetin, N.1
  • 3
    • 36549009533 scopus 로고
    • Prediction of shovel-truck production: A reconciliation of computer and conventional estimates
    • Department of Civil Engineering Stanford University
    • Douglas, J. (1964) Prediction of shovel-truck production: A reconciliation of computer and conventional estimates. Department of Civil Engineering, Stanford University
    • (1964)
    • Douglas, J.1
  • 4
    • 36549028314 scopus 로고    scopus 로고
    • Highway earthwork and pavement production rates for construction time estimation
    • Kuo, Y. Highway earthwork and pavement production rates for construction time estimation
    • Kuo, Y.1
  • 6
    • 0009068346 scopus 로고
    • Determining shovel-truck productivity
    • Morgan, W. and Peterson, L. (1968) Determining shovel-truck productivity. Min. Eng., pp. 76-80.
    • (1968) Min. Eng. , pp. 76-80
    • Morgan, W.1    Peterson, L.2
  • 8
    • 0029304813 scopus 로고
    • Productivity estimation in back-acter/dump-truck earth-moving operations
    • Smith, S., Osborne, J. and Forde, M. (1995) Productivity estimation in back-acter/dump-truck earth-moving operations. Proc. Inst. Civil Eng. Transport, 111, pp. 125-131.
    • (1995) Proc. Inst. Civil Eng. Transport , vol.111 , pp. 125-131
    • Smith, S.1    Osborne, J.2    Forde, M.3
  • 9
    • 0006609394 scopus 로고    scopus 로고
    • A new earthworks estimating methodology
    • Smith, S., Wood, G. and Gould, M. (2000) A new earthworks estimating methodology. Construction Mgmt. Econ., 18, pp. 219-228.
    • (2000) Construction Mgmt. Econ. , vol.18 , pp. 219-228
    • Smith, S.1    Wood, G.2    Gould, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.