-
2
-
-
0011773709
-
-
Caterpillar Tractor Co., Peoria, Ill.
-
Caterpillar performance handbook. (1993). Caterpillar Tractor Co., Peoria, Ill., 8-79.
-
(1993)
Caterpillar Performance Handbook
, pp. 8-79
-
-
-
3
-
-
0028452701
-
Simulation verifies queuing program for selecting loader-truck fleets
-
ASCE
-
Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader-truck fleets." J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386.
-
(1994)
J. Constr. Engrg. and Mgmt.
, vol.120
, Issue.2
, pp. 386
-
-
Farid, F.1
Koning, T.L.2
-
4
-
-
0016587576
-
Optimum size of hauling units
-
ASCE
-
Gates, M., and Scarpa, A. (1975). "Optimum size of hauling units." J. Constr. Div., ASCE, 101(4), 853-860.
-
(1975)
J. Constr. Div.
, vol.101
, Issue.4
, pp. 853-860
-
-
Gates, M.1
Scarpa, A.2
-
5
-
-
85033862589
-
-
MSc thesis, Oregon State Univ., Corvallis, Oreg.
-
Gransberg, D. D. (1979). "Determining optimum size and number of hauling units," MSc thesis, Oregon State Univ., Corvallis, Oreg., 18-19.
-
(1979)
Determining Optimum Size and Number of Hauling Units
, pp. 18-19
-
-
Gransberg, D.D.1
-
6
-
-
5244363680
-
Optimizing haul fleet size using queuing theory
-
ASCE
-
Griffis, F. H. (1968). "Optimizing haul fleet size using queuing theory." J. Constr. Div., ASCE, 94(1), 75-88.
-
(1968)
J. Constr. Div.
, vol.94
, Issue.1
, pp. 75-88
-
-
Griffis, F.H.1
-
7
-
-
0004176045
-
-
McGraw-Hill Book Co., Inc., New York, N.Y.
-
Peurifoy, R. L. (1970). Construction planning, equipment, and methods. McGraw-Hill Book Co., Inc., New York, N.Y.
-
(1970)
Construction Planning, Equipment, and Methods
-
-
Peurifoy, R.L.1
-
8
-
-
0016519334
-
Cost-reducing analyses
-
ASCE
-
Peurifoy, R. L. (1975). "Cost-reducing analyses." J. Constr. Div., ASCE, 101(2), 299-307.
-
(1975)
J. Constr. Div.
, vol.101
, Issue.2
, pp. 299-307
-
-
Peurifoy, R.L.1
-
9
-
-
0004176045
-
-
McGraw-Hill Book Co., Inc., New York, N.Y.
-
Peurifoy, R. L., and Ledbetter, W. B. (1985). Construction planning, equipment, and methods. McGraw-Hill Book Co., Inc., New York, N.Y., 188-190.
-
(1985)
Construction Planning, Equipment, and Methods
, pp. 188-190
-
-
Peurifoy, R.L.1
Ledbetter, W.B.2
-
10
-
-
85033840048
-
Equipment costs
-
Oregon State Univ., Corvallis, Oreg.
-
Phelps, R. E. (1977). "Equipment costs." Working Paper, Oregon State Univ., Corvallis, Oreg.
-
(1977)
Working Paper
-
-
Phelps, R.E.1
-
11
-
-
0023366791
-
Bunching theory applied to minimize cost
-
ASCE
-
Ringwald, R. C. (1987). "Bunching theory applied to minimize cost." J. Constr. Engrg. and Mgmt., ASCE, 113(2), 321-326.
-
(1987)
J. Constr. Engrg. and Mgmt.
, vol.113
, Issue.2
, pp. 321-326
-
-
Ringwald, R.C.1
-
12
-
-
3342935888
-
Equipment policy of top 400 contractors: A survey. J
-
ASCE
-
Tavakoli, A., Taye, E. D., and Erktin, M. (1989). "Equipment policy of top 400 contractors: a survey." J. Constr. Engrg. and Mgmt., ASCE, 115(2), 317-329.
-
(1989)
Constr. Engrg. and Mgmt.
, vol.115
, Issue.2
, pp. 317-329
-
-
Tavakoli, A.1
Taye, E.D.2
Erktin, M.3
|