메뉴 건너뛰기




Volumn 52, Issue 4, 2014, Pages 1100-1115

A cloud-based intelligent decision-making system for order tracking and allocation in apparel manufacturing

Author keywords

cloud computing; intelligent optimisation; order allocation; order tracking

Indexed keywords

APPAREL MANUFACTURING; CLOUD COMPUTING TECHNOLOGIES; COMPUTATIONAL INTELLIGENCE TECHNIQUES; INTELLIGENT DECISION-MAKING; OPTIMISATIONS; ORDER ALLOCATION; ORDER TRACKING; PRODUCTION EFFICIENCY;

EID: 84892912549     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.838650     Document Type: Article
Times cited : (28)

References (26)
  • 1
    • 17444390501 scopus 로고    scopus 로고
    • Planning order releases for an assembly system with random operation times
    • Axsater, S. 2005. " Planning Order Releases for an Assembly System with Random Operation times." OR Spectrum 27 (2-3): 459-470.
    • (2005) OR Spectrum , vol.27 , Issue.23 , pp. 459-470
    • Axsater, S.1
  • 2
    • 77951117106 scopus 로고    scopus 로고
    • Swmrd: A semantic web-based manufacturing resource discovery system for cross-enterprise collaboration
    • Cai, M., W. Y. Zhang, G. Chen, K. Zhang, and, S. T. Li. 2010. " Swmrd: A Semantic Web-based Manufacturing Resource Discovery System for Cross-enterprise Collaboration." International Journal of Production Research 48 (12): 3445-3460.
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3445-3460
    • Cai, M.1    Zhang, W.Y.2    Chen, G.3    Zhang, K.4    Li, S.T.5
  • 4
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen, Z., and, G. Pundoor. 2006. " Order Assignment and Scheduling in a Supply Chain." Operations Research 54 (3): 555-572.
    • (2006) Operations Research , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.1    Pundoor, G.2
  • 5
    • 36348929265 scopus 로고    scopus 로고
    • Supply planning under uncertainties in mrp environments: A state of the art
    • Dolgui, A., and, C. Prodhon. 2007. " Supply Planning under Uncertainties in MRP Environments: A State of the Art." Annual Reviews in Control 31 (2): 269-279.
    • (2007) Annual Reviews in Control , vol.31 , Issue.2 , pp. 269-279
    • Dolgui, A.1    Prodhon, C.2
  • 6
    • 79951858052 scopus 로고    scopus 로고
    • An efficient genetic algorithm for hybrid flow shop scheduling with multiprocessor task problems
    • Engin, O., G. Ceran, and, M. Yilmaz. 2011. " An Efficient Genetic Algorithm for Hybrid Flow Shop Scheduling with Multiprocessor Task Problems." Applied Soft Computing 11 (3): 3056-3065.
    • (2011) Applied Soft Computing , vol.11 , Issue.3 , pp. 3056-3065
    • Engin, O.1    Ceran, G.2    Yilmaz, M.3
  • 7
    • 84884575033 scopus 로고    scopus 로고
    • Integrated aggregate supply chain planning using memetic algorithm-a performance analysis case study
    • Fahimnia, B., R. Z. Farahani, and, J. Sarkis. 2013. " Integrated Aggregate Supply Chain Planning Using Memetic Algorithm-A Performance Analysis Case Study." International Journal of Production Research 51 (18): 5354-5373.
    • (2013) International Journal of Production Research , vol.51 , Issue.18 , pp. 5354-5373
    • Fahimnia, B.1    Farahani, R.Z.2    Sarkis, J.3
  • 10
    • 82655189217 scopus 로고    scopus 로고
    • Applications of artificial intelligence in the apparel industry: A review
    • Guo, Z. X., W. K. Wong, S. Y. S. Leung, and, M. Li. 2012. " Applications of Artificial Intelligence in the Apparel Industry: A Review." Textile Research Journal 81 (18): 1871-1892.
    • (2012) Textile Research Journal , vol.81 , Issue.18 , pp. 1871-1892
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Li, M.4
  • 11
    • 84876158070 scopus 로고    scopus 로고
    • Modeling and pareto optimization of multi-objective order scheduling problems in production planning
    • Guo, Z. X., W. K. Wong, Li Zhi, and, Ren Peiyu. 2013a. " Modeling and Pareto Optimization of Multi-objective Order Scheduling Problems in Production Planning." Computers & Industrial Engineering 64 (4): 972-986.
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.4 , pp. 972-986
    • Guo, Z.X.1    Wong, W.K.2    Zhi, L.3    Peiyu, R.4
  • 12
    • 84881661182 scopus 로고    scopus 로고
    • A hybrid intelligent model for order allocation planning in make-to-order manufacturing
    • Guo, Z. X., W. K. Wong, and, S. Y. S. Leung. 2013b. " A Hybrid Intelligent Model for Order Allocation Planning in Make-to-order Manufacturing." Applied Soft Computing 13 (3): 1376-1390.
    • (2013) Applied Soft Computing , vol.13 , Issue.3 , pp. 1376-1390
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3
  • 13
    • 77951096660 scopus 로고    scopus 로고
    • A branch-and-bound algorithm to minimize the line length of a two-sided assembly line
    • Hu, X. F., E. F. Wu, J. S. Bao, and, Y. Jin. 2010. " A Branch-and-bound Algorithm to Minimize the Line Length of a Two-sided Assembly Line." European Journal of Operational Research 206 (3): 703-707.
    • (2010) European Journal of Operational Research , vol.206 , Issue.3 , pp. 703-707
    • Hu, X.F.1    Wu, E.F.2    Bao, J.S.3    Jin, Y.4
  • 14
    • 84868705761 scopus 로고    scopus 로고
    • A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times
    • Jolai, F., M. Rabiee, and, H. Asefi. 2012. " A Novel Hybrid Meta-heuristic Algorithm for a No-wait Flexible Flow Shop Scheduling Problem with Sequence Dependent Setup times." International Journal of Production Research 50 (24): 7447-7466.
    • (2012) International Journal of Production Research , vol.50 , Issue.24 , pp. 7447-7466
    • Jolai, F.1    Rabiee, M.2    Asefi, H.3
  • 15
    • 84863107632 scopus 로고    scopus 로고
    • Knowledge cloud system for network collaboration: A case study in medical service industry in china
    • Lai, I. K. W., S. K. T. Tam, and, M. F. S. Chan. 2012. " Knowledge Cloud System for Network Collaboration: A Case Study in Medical Service Industry in China." Expert Systems with Applications 39 (15): 12205-12212.
    • (2012) Expert Systems with Applications , vol.39 , Issue.15 , pp. 12205-12212
    • Lai, I.K.W.1    Tam, S.K.T.2    Chan, M.F.S.3
  • 17
    • 77951192753 scopus 로고    scopus 로고
    • A possibilistic aggregate production planning model for brass casting industry
    • Sakalli, U., O. Baykoc, and, B. Birgoren. 2010. " A Possibilistic Aggregate Production Planning Model for Brass Casting Industry." Production Planning & Control 21 (3): 319-338.
    • (2010) Production Planning & Control , vol.21 , Issue.3 , pp. 319-338
    • Sakalli, U.1    Baykoc, O.2    Birgoren, B.3
  • 19
    • 84887691677 scopus 로고    scopus 로고
    • Cloud based e-governance system: A survey
    • Smitha, K. K., T. Thomas, and, K. Chitharanjan. 2012. " Cloud Based E-governance System: A Survey." Procedia Engineering 38 (1): 3816-3823.
    • (2012) Procedia Engineering , vol.38 , Issue.1 , pp. 3816-3823
    • Smitha, K.K.1    Thomas, T.2    Chitharanjan, K.3
  • 23
    • 77952624937 scopus 로고    scopus 로고
    • A review of manufacturing resources planning models under different uncertainties: State-of-the-art and future directions
    • Wazed, M., S. Ahmed, and, Y. Nukman. 2010. " A Review of Manufacturing Resources Planning Models under Different Uncertainties: State-of-the-art and Future Directions." South African Journal of Industrial Engineering 21 (1): 17-33.
    • (2010) South African Journal of Industrial Engineering , vol.21 , Issue.1 , pp. 17-33
    • Wazed, M.1    Ahmed, S.2    Nukman, Y.3
  • 24
    • 78049375347 scopus 로고    scopus 로고
    • A solution of manufacturing resources sharing in cloud computing environment
    • Wu, L., and, C. Yang. 2010. " A Solution of Manufacturing Resources Sharing in Cloud Computing Environment." Lecture Notes in Computer Science 6240: 247-252.
    • (2010) Lecture Notes in Computer Science , vol.6240 , pp. 247-252
    • Wu, L.1    Yang, C.2
  • 25
    • 80052032966 scopus 로고    scopus 로고
    • From cloud computing to cloud manufacturing
    • Xu, X. 2012. " From Cloud Computing to Cloud Manufacturing." Robotics and Computer-Integrated Manufacturing 28 (1): 75-86.
    • (2012) Robotics and Computer-Integrated Manufacturing , vol.28 , Issue.1 , pp. 75-86
    • Xu, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.