-
1
-
-
52049096128
-
Evaluation of automatic flow analysis for wcet calculationon industrial real-time system code
-
D. Barkah, A. Ermedahl, J. Gustafsson, B. Lisper, and C. Sandberg.Evaluation of automatic flow analysis for wcet calculationon industrial real-time system code. In 20th Euromicro Conferenceon Real-Time Systems (ECRTS), pages 331-340, 2008.
-
(2008)
20th Euromicro Conferenceon Real-Time Systems (ECRTS)
, pp. 331-340
-
-
Barkah, D.1
Ermedahl, A.2
Gustafsson, J.3
Lisper, B.4
Sandberg, C.5
-
2
-
-
36348941424
-
Probabilistic timing analysis: An approach using copulas
-
Apr
-
G. Bernat, A. Burns, and M. Newby. Probabilistic timing analysis:An approach using copulas. J. Embedded Comput., 1(2), Apr.2005.
-
(2005)
J. Embedded Comput.
, vol.1
, Issue.2
-
-
Bernat, G.1
Burns, A.2
Newby, M.3
-
6
-
-
79951796002
-
Reasoning about the reliability ofmulti-version, diverse real-time systems
-
Washington, DC, USA,. IEEE Computer Society
-
A. Burns and B. Littlewood. Reasoning about the reliability ofmulti-version, diverse real-time systems. In Proceedings of the2010 31st IEEE Real-Time Systems Symposium, RTSS 10, pages73-81, Washington, DC, USA, 2010. IEEE Computer Society.
-
(2010)
Proceedings of the2010 31st IEEE Real-Time Systems Symposium, RTSS 10
, pp. 73-81
-
-
Burns, A.1
Littlewood, B.2
-
7
-
-
84885225786
-
PROARTIS: Probabilisticallyanalysable real-time systems
-
F. Cazorla, E. Quinones, T. Vardanega, L. Cucu, B. Triquet,G. Bernat, E. Berger, J. Abella, F. Wartel, M. Houston, L. Santinelli,L. Kosmidis, C. Lo, and D. Maxim. PROARTIS: Probabilisticallyanalysable real-time systems. ACM Transactions onEmbedded Computing Systems, 2011.
-
(2011)
ACM Transactions OnEmbedded Computing Systems
-
-
Cazorla, F.1
Quinones, E.2
Vardanega, T.3
Cucu, L.4
Triquet, B.5
Bernat, G.6
Berger, E.7
Abella, J.8
Wartel, F.9
Houston, M.10
Santinelli, L.11
Kosmidis, L.12
Lo, C.13
Maxim, D.14
-
9
-
-
0033733125
-
Worst case execution time analysis for a processorwith branch prediction
-
A. Colin and I. Puaut. Worst case execution time analysis for a processorwith branch prediction. Real-Time Systems, 18(2/3):249-274, 2000.
-
(2000)
Real-Time Systems
, vol.18
, Issue.2-3
, pp. 249-274
-
-
Colin, A.1
Puaut, I.2
-
10
-
-
84870558322
-
Developing critical embedded systems on multicore architectures: The prelude-schedmcore toolset
-
Nantes, France, September 29-30 IRCCyN lab, IRCCyNlab
-
M. Cordovilla, F. Boniol, J. Forget, E. Noulard, and C. Pagetti.Developing critical embedded systems on multicore architectures:the prelude-schedmcore toolset. In 19th InternationalConference on Real-Time and Network Systems (RTNS 2011),Nantes, France, September 29-30 2011. IRCCyN lab, IRCCyNlab. http://hal. inria. fr/inria-00618587/en/.
-
(2011)
19th InternationalConference on Real-Time and Network Systems (RTNS 2011)
-
-
Cordovilla, M.1
Boniol, F.2
Forget, J.3
Noulard, E.4
Pagetti, C.5
-
11
-
-
84866440712
-
Measurement-based probabilistic timing analysis for multi-pathprograms
-
L. Cucu-Grosjean, L. Santinelli, M. Houston, C. Lo, T. Vardanega,L. Kosmidis, J. Abella, E. Mezzeti, E. Quinones, and F. J. Cazorla.Measurement- Based Probabilistic Timing Analysis for Multi-pathPrograms. In 23nd Euromicro Conference on Real-Time Systems(ECRTS). IEEE, 2012.
-
(2012)
23nd Euromicro Conference on Real-Time Systems(ECRTS). IEEE
-
-
Cucu-Grosjean, L.1
Santinelli, L.2
Houston, M.3
Lo, C.4
Vardanega, T.5
Kosmidis, L.6
Abella, J.7
Mezzeti, E.8
Quinones, E.9
Cazorla, F.J.10
-
12
-
-
67650788815
-
Safe measurementbasedwcet estimation
-
J.-F. Deverge and I. Puaut. Safe measurementbasedwcet estimation. In WCET2005, 2005.http://drops. dagstuhl. de/opus/volltexte/2007/808.
-
(2005)
WCET2005
-
-
Deverge, J.-F.1
Puaut, I.2
-
16
-
-
84893392539
-
Combined tracing of the kernel and applicationswith lttng
-
P.-M. Fournier, M. Desnoyer, and M. R. Dagenais.Combined tracing of the kernel and applicationswith lttng. In Linux Symposium 2009, 2009.http://www. dorsal. polymtl. ca/static/publications/fourniercombined-tracing-ols2009. pdf.
-
(2009)
Linux Symposium 2009
-
-
Fournier, P.-M.1
Desnoyer, M.2
Dagenais, M.R.3
-
18
-
-
84866445170
-
The et test, a goodness-of-fit testfor the distribution tail
-
M. Garrido and J. Diebolt. The ET test, a goodness-of-fit testfor the distribution tail. In Methodology, Practice and Inference,second international conference on mathematical methods in reliability,pages 427-430, 2000.
-
(2000)
Methodology, Practice and Inference, Second International Conference on Mathematical Methods in Reliability
, pp. 427-430
-
-
Garrido, M.1
Diebolt, J.2
-
19
-
-
81355159273
-
-
Brussels, Belgium, July OCG
-
J. Gustafsson, A. Betts, A. Ermedahl, and B. Lisper. TheMalardalen WCET benchmarks-past, present and future. pages137-147, Brussels, Belgium, July 2010. OCG.
-
(2010)
TheMalardalen WCET Benchmarks-past, Present and Future
, pp. 137-147
-
-
Gustafsson, J.1
Betts, A.2
Ermedahl, A.3
Lisper, B.4
-
20
-
-
0034478672
-
Integratingreliability and timing analysis of CAN-based systems
-
A. H. Hans, N. Thomas, N. Christer, and P. Sasikumar. Integratingreliability and timing analysis of CAN-based systems. In IEEETransaction on Industrial Electronics, pages 165-172, 2002.
-
(2002)
IEEETransaction on Industrial Electronics
, pp. 165-172
-
-
Hans, A.H.1
Thomas, N.2
Christer, N.3
Sasikumar, P.4
-
21
-
-
78650474439
-
-
Technical report, Carnegie MellonUniversity, Pittsburg
-
J. P. Hansen, S. A. Hissam, and G. A. Moreno. Statistical-basedwcet estimation and validation. Technical report, Carnegie MellonUniversity, Pittsburg, 2009.
-
(2009)
Statistical-basedwcet Estimation and Validation
-
-
Hansen, J.P.1
Hissam, S.A.2
Moreno, G.A.3
-
22
-
-
6944231166
-
The influence of processor architecture on the design and the resultsof wcet tools
-
R. Heckmann, M. Langenbach, S. Thesing, and R. Wilhelm.The influence of processor architecture on the design and the resultsof wcet tools. Proceedings of the IEEE Real-Time Systems,91(7):1038-1054, 2003.
-
(2003)
Proceedings of the IEEE Real-Time Systems
, vol.91
, Issue.7
, pp. 1038-1054
-
-
Heckmann, R.1
Langenbach, M.2
Thesing, S.3
Wilhelm, R.4
-
23
-
-
4644255757
-
A formally verifiedapplication-level framework for real-time scheduling on posixreal-time operating systems
-
September
-
P. Li, B. Ravindran, S. Suhaib, and S. Feizabadi. A formally verifiedapplication-level framework for real-time scheduling on posixreal-time operating systems. IEEE Trans. Softw. Eng., 30:613-629, September 2004.
-
(2004)
IEEE Trans. Softw. Eng.
, vol.30
, pp. 613-629
-
-
Li, P.1
Ravindran, B.2
Suhaib, S.3
Feizabadi, S.4
-
24
-
-
84890609028
-
Stochastic analysisof real-time systems under preemptive priority-driven scheduling
-
J. Lpez, J. Daz, J. Entrialgo, and D. Garcia. Stochastic analysisof real-time systems under preemptive priority-driven scheduling.Journal of Real-time Systems, 40(2), 2008.
-
(2008)
Journal of Real-time Systems
, vol.40
, Issue.2
-
-
Lpez, J.1
Daz, J.2
Entrialgo, J.3
Garcia, D.4
-
27
-
-
84890649524
-
-
ONERA, The French Aerospace Lab. SchedMCore Users Manual, February 2012
-
ONERA, The French Aerospace Lab. SchedMCore Users Manual,February 2012.
-
-
-
-
28
-
-
79960066867
-
Multi-task implementation of multi-periodic synchronous programs
-
C. Pagetti, J. Forget, F. Boniol, M. Cordovilla, and D. Lesens.Multi-task implementation of multi-periodic synchronous programs.Discrete Event Dynamic Systems, 21(3):307-338, 2011.
-
(2011)
Discrete Event Dynamic Systems
, vol.21
, Issue.3
, pp. 307-338
-
-
Pagetti, C.1
Forget, J.2
Boniol, F.3
Cordovilla, M.4
Lesens, D.5
-
33
-
-
43949126892
-
The worst-case execution-time problem-overview of methods andsurvey of tools
-
R. Wilhelm, J. Engblom, A. Ermedahl, N. Holsti, S. Thesing,D. B. Whalley, G. Bernat, C. Ferdinand, R. Heckmann, T. Mitra,F. Mueller, I. Puaut, P. P. Puschner, J. Staschulat, and P. Stenstrom.The worst-case execution-time problem-overview of methods andsurvey of tools. ACM Trans. Embedded Comput. Syst., 2008.
-
(2008)
ACM Trans. Embedded Comput. Syst.
-
-
Wilhelm, R.1
Engblom, J.2
Ermedahl, A.3
Holsti, N.4
Thesing, S.5
Whalley, D.B.6
Bernat, G.7
Ferdinand, C.8
Heckmann, R.9
Mitra, T.10
Mueller, F.11
Puaut, I.12
Puschner, P.P.13
Staschulat, J.14
Stenstrom, P.15
|