-
2
-
-
21844508729
-
Lot Streaming in the Two-Machine Flow Shop with Setup Times
-
Baker, K.R., "Lot Streaming in the Two-Machine Flow Shop with Setup Times", Annals of Operations Research, 57(1995), 1-11.
-
(1995)
Annals of Operations Research
, vol.57
, pp. 1-11
-
-
Baker, K.R.1
-
3
-
-
0028698198
-
Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
-
Cetinkaya, F.C., "Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated", J. Operational Research Society, 45(1994), 1445-1455.
-
(1994)
J. Operational Research Society
, vol.45
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
4
-
-
0000399972
-
Unit Sized Transfer Batch Scheduling with Setup Times
-
Cetinkaya, F.C., and Kayaligil, M.S., "Unit Sized Transfer Batch Scheduling with Setup Times", Computers and Industrial Engineering, 22 (1992) 177-183.
-
(1992)
Computers and Industrial Engineering
, vol.22
, pp. 177-183
-
-
Cetinkaya, F.C.1
Kayaligil, M.S.2
-
5
-
-
0031076263
-
Lot Streaming with Detached Setups in Three-Machine Flow Shops
-
Chen, J., and Steiner, G., "Lot Streaming with Detached Setups in Three-Machine Flow Shops", European J. Operational Research, 96 (1997), 591-611.
-
(1997)
European J. Operational Research
, vol.96
, pp. 591-611
-
-
Chen, J.1
Steiner, G.2
-
6
-
-
85038051919
-
-
W.P.400, School of Business, McMaster U., Hamilton, Ont.
-
Chen, J., and Steiner, G., "Lot Streaming with Attached Setups in Three-Machine Flow Shops", W.P.400, School of Business, McMaster U., Hamilton, Ont., 1994.
-
(1994)
Lot Streaming with Attached Setups in Three-Machine Flow Shops
-
-
Chen, J.1
Steiner, G.2
-
7
-
-
0040324561
-
OPT - An Answer for America (Part IV)
-
Fox, R.E., "OPT - An Answer for America (Part IV)", Inventories and Production 3 (1983).
-
(1983)
Inventories and Production
, vol.3
-
-
Fox, R.E.1
-
8
-
-
0028769359
-
Lot Streaming in Three-Stage Production Processes
-
Glass, C.A., Gupta, J.N.D, and Potts, C.N., "Lot Streaming In Three-Stage Production Processes", European J. Operational Research, 75 (1994) 378-394.
-
(1994)
European J. Operational Research
, vol.75
, pp. 378-394
-
-
Glass, C.A.1
Gupta, J.N.D.2
Potts, C.N.3
-
9
-
-
0003710588
-
-
North River Press, Croton-on-Hudson, NY
-
Goldratt, E., and Fox, R.E., The Race, North River Press, Croton-on-Hudson, NY, 1986.
-
(1986)
The Race
-
-
Goldratt, E.1
Fox, R.E.2
-
10
-
-
0001738801
-
Note on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Model
-
Goyal, S.K., "Note on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Model", Management Science 23 (1976) 332-333; the rejoinder, 334-338.
-
(1976)
Management Science
, vol.23
, pp. 332-333
-
-
Goyal, S.K.1
-
11
-
-
38249040429
-
Overlapping Operations in Material Requirements Planning
-
Graves, S.C., and Kostreva, M., "Overlapping Operations in Material Requirements Planning", J. Operations Managements (1987) 283-294.
-
(1987)
J. Operations Managements
, pp. 283-294
-
-
Graves, S.C.1
Kostreva, M.2
-
12
-
-
84985801774
-
Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing
-
Jacobs, F.R., and Bragg, D.J., "Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing", Decision Sciences 19 (1988) 281-294.
-
(1988)
Decision Sciences
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
13
-
-
0013321506
-
Overlapping Operations - A Step Towards Just-In-Tirrie Production
-
Readings in Zero Inventory
-
Kulonda, D.J., "Overlapping Operations - A Step Towards Just-In-Tirrie Production", Readings in Zero Inventory, APICS 27th Annual Conf. (1984) 78-80.
-
(1984)
APICS 27th Annual Conf.
, pp. 78-80
-
-
Kulonda, D.J.1
-
14
-
-
0022516278
-
Optimal and Heuristic Procedures for Component Lot-Splitting in a Flow Shop
-
Moily, J.P., "Optimal and Heuristic Procedures for Component Lot-Splitting in a Flow Shop", Management Science 32 (1986) 113-125.
-
(1986)
Management Science
, vol.32
, pp. 113-125
-
-
Moily, J.P.1
-
15
-
-
0000281691
-
A Concise Survey of Efficiently Solvable Special Cases of the Permutation Flow-Shop Problem
-
Monma, C.L., and Rinnooy Kan, A.H.G., "A Concise Survey of Efficiently Solvable Special Cases of the Permutation Flow-Shop Problem", RAIRO Recherche Operationelle 17(1983) 105-119.
-
(1983)
RAIRO Recherche Operationelle
, vol.17
, pp. 105-119
-
-
Monma, C.L.1
Rinnooy Kan, A.H.G.2
-
17
-
-
0000659781
-
A System for Managing Job Shop Production
-
Reiter, S., "A System for Managing Job Shop Production", J. of Business, 34 (1966) 371-393.
-
(1966)
J. of Business
, vol.34
, pp. 371-393
-
-
Reiter, S.1
-
18
-
-
0016572027
-
Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
-
Szendrovits, A.Z. "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model", Management Science, 22 (1978), 298-308.
-
(1978)
Management Science
, vol.22
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
19
-
-
0027662155
-
Batch Scheduling to Minimize Cycle Time, Flow Time, and Processing Cost
-
Steiner, G., and Truscott, W.G., "Batch Scheduling to Minimize Cycle Time, Flow Time, and Processing Cost", IIE Transactions, 23 (1993) 90-97.
-
(1993)
IIE Transactions
, vol.23
, pp. 90-97
-
-
Steiner, G.1
Truscott, W.G.2
-
20
-
-
0013223856
-
-
W.P. NPS-54.87-010, Naval Postgr. School, Monterey, CA
-
Trietsch, D., "Optimal Transfer Lots For Batch Manufacturing: A Base Case And Extension", W.P. NPS-54.87-010, Naval Postgr. School, Monterey, CA, 1987.
-
(1987)
Optimal Transfer Lots for Batch Manufacturing: A Base Case and Extension
-
-
Trietsch, D.1
-
21
-
-
0013225437
-
-
W.P. NPS-54-89-011, Naval Postgr. School, Monterey, CA
-
Trietsch, D., " Polynomial Transfer Lot Sizing Techniques For Batch Processing On Consecutive Machines", W.P. NPS-54-89-011, Naval Postgr. School, Monterey, CA, 1989.
-
(1989)
Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines
-
-
Trietsch, D.1
-
22
-
-
0000611941
-
Basic Techniques for Lot Streaming
-
Trietsch, D., and Baker, K.R., "Basic Techniques For Lot Streaming", Operations Research, 41 (1993), 1065-1076.
-
(1993)
Operations Research
, vol.41
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
23
-
-
0029378595
-
Optimal Lot Streaming for Multiple Products in a Two-Machine Flow Shop
-
Vickson, R. "Optimal Lot Streaming For Multiple Products in a Two-Machine Flow Shop", European J. Operational Research, 85 (1995) 556-575.
-
(1995)
European J. Operational Research
, vol.85
, pp. 556-575
-
-
Vickson, R.1
-
24
-
-
0026896286
-
Two and Three Machines Flow Shop Scheduling Problems with Equal Sized Transfer Batches
-
Vickson, R., and Alfredsson, B., "Two and Three Machines Flow Shop Scheduling Problems With Equal Sized Transfer Batches", Int. J. Production Research, 30 (1992) 1551-1574.
-
(1992)
Int. J. Production Research
, vol.30
, pp. 1551-1574
-
-
Vickson, R.1
Alfredsson, B.2
-
25
-
-
0039140285
-
-
M.Sc. Thesis, Dept. of Management Sciences, U. Waterloo, Ont.
-
Warrillow, E.C.S., "The Use of Lot Streaming in the Presence of Setups and Multiple Jobs", M.Sc. Thesis, Dept. of Management Sciences, U. Waterloo, Ont., 1993.
-
(1993)
The Use of Lot Streaming in the Presence of Setups and Multiple Jobs
-
-
Warrillow, E.C.S.1
|